Submittal Intelligence Skill
Overview
The submittal-intelligence skill performs comprehensive compliance reviews of submitted product data, shop drawings, and samples against specification requirements from project intelligence. It automates the verification process by:
- Extracting spec requirements from relevant CSI sections with testable, verifiable criteria
- Parsing submittal documents (PDFs, data sheets, shop drawings) to extract product specifications and performance data
- Building a compliance matrix that cross-references each specification requirement with the submitted value
- Determining compliance status for each line item: Compliant, Non-Compliant, Partially Compliant, or Unable to Verify
- Generating professional review comments suitable for architect/engineer review cycles
- Producing an overall recommendation: Approved, Approved as Noted, Revise and Resubmit, or Rejected
- Tracking submission history and flagging changes from previous revisions
The skill produces deliverables suitable for direct inclusion in RFI responses, meeting minutes, and project correspondence.
When to Use
- Submittal PDFs uploaded for review by contractors or suppliers
- Verifying products meet specifications before purchase or installation approval
- Preparing review comments for architect/engineer sign-off
- Processing shop drawing submissions for dimensional and detail compliance
- Evaluating "or equal" substitutions against original specification requirements
- Checking certification and testing data against spec-required standards
- Documenting compliance decisions in the submittal log for future reference
- Expediting review cycles when multiple submittals require rapid turnaround
Data Sources
- submittal_log — Historical record of submitted items, spec sections, review dates, and recommendation status
- spec_sections — Structured project specifications with required fields:
submittal_required (boolean) — indicates if spec section requires submittal review
key_req (array) — critical requirements in natural language
tolerances (object) — dimensional and performance tolerances
testing (array) — ASTM, ASHRAE, or other standards for verification
environmental (object) — VOC, lead-free, sustainability requirements
divisions (CSI division codes) — Division 03, 05, 07, 08, 09, etc.
- key_materials — Material specifications database with properties, certifications, and approved equal products
- document-intelligence skill — Used to parse and extract data from submittal PDFs, data sheets, and shop drawings
- project-data skill — Used to retrieve and reference project-specific requirements and approved materials
Workflow
1. Identify the Submittal
- Retrieve submittal ID from submittal_log if resubmission
- Or accept new submittal document (PDF, image, data sheet)
- Extract cover letter, item description, and submission metadata
2. Determine the Spec Section
- Query submittal_log by submittal ID to find associated CSI spec section
- If new submittal, ask user to specify relevant spec section (e.g., "Division 03 Concrete", "Division 08 Doors and Frames")
- Confirm with user if ambiguous
3. Load Spec Requirements
- Retrieve spec section from project intelligence
- Extract all relevant requirements into a structured checklist:
- Material properties (grade, PSI, finish, color)
- Dimensional tolerances (sizes, clearances)
- Performance ratings (fire ratings, sound ratings, load capacity)
- Testing standards (ASTM references with specific test methods)
- Environmental compliance (VOC limits, lead-free, RoHS)
- Certifications (UL, ICC, NFRC, FINEGRAIN, etc.)
- Note any "or equal" or "approved equal" clauses that allow substitutions
4. Parse Submittal Document
- Use document-intelligence skill to extract:
- Product name, model, manufacturer
- Technical specifications and properties
- Dimensional data (from shop drawings or product data)
- Testing certifications and lab reports
- Material certifications and safety data
- Installation notes and conditions
- Organize extracted data in same format as spec requirements for direct comparison
5. Build Compliance Matrix
- Create line-by-line comparison table:
- Column 1: Spec Requirement (reference code, e.g., "03.03.01")
- Column 2: Requirement Text (extract from spec)
- Column 3: Submitted Value (extract from submittal document)
- Column 4: Compliance Status (Compliant / Non-Compliant / Partially Compliant / Unable to Verify)
- Column 5: Notes (explanation or citation)
- Sort by compliance status to highlight non-compliances first
5a. Auto-Populated Compliance Matrix
When /process-docs processes a submittal package, the compliance matrix should be auto-populated before the user runs /submittal-review:
- From the submittal package, extract all product specifications (model, performance values, certifications, test reports)
- From
specs-quality.json, load the relevant spec section requirements for the material type
- For each spec requirement, find the corresponding submitted value:
- Match by property name (e.g., "compressive strength" in spec → "f'c" in submittal)
- Match by ASTM standard (e.g., spec requires "per ASTM C39" → look for C39 test results)
- Match by performance category (e.g., "fire rating" in spec → "UL listing" in submittal)
- Pre-populate the compliance matrix:
| Spec Requirement | Required Value | Submitted Value | Compliance | Source |
|---|---|---|---|---|
| Compressive strength | ≥4,000 PSI | 4,500 PSI | ✅ PASS | Mix design report p.2 |
| w/c ratio | ≤0.45 | 0.42 | ✅ PASS | Mix design report p.3 |
| Air content | 5-7% | Not provided | ❓ MISSING | — |
- Flag any row where:
- Submitted value < required value → FAIL
- Submitted value is missing → MISSING DATA
- Submitted value can't be compared (different units, different test standard) → NEEDS MANUAL REVIEW
This auto-population happens during /process-docs extraction. The /submittal-review command then presents the pre-filled matrix for the superintendent to confirm, override, or supplement with field observations.
6. Determine Compliance Status
- Compliant — Submitted value exactly matches or exceeds spec requirement
- Non-Compliant — Submitted value falls short of spec requirement (cite specific deficiency)
- Partially Compliant — Submittal addresses requirement in part but leaves ambiguities or conditions
- Unable to Verify — Required specification data missing from submittal (request clarification)
- See compliance-checking.md for detailed determination rules and examples
6a. Concrete Mix Design Submittal Review
When reviewing concrete mix design submittals, refer to the concrete-mix-design-extraction template in the foremanos-intel plugin's document-intelligence skill for detailed extraction guidance (if installed). Key compliance checks:
- Design f'c meets or exceeds specified f'c (with appropriate overdesign margin)
- w/c ratio does not exceed specified maximum
- Air content within specified range (especially for freeze-thaw exposure)
- Cement type matches spec requirement (Type I, II, III, V)
- Aggregate meets gradation and maximum size requirements
- Admixtures are from approved manufacturers list (if specified)
- Lab performing trial batch is accredited
- Cold weather and hot weather modification plans are included if project has temperature-dependent specs
7. Generate Overall Recommendation
Synthesize compliance matrix into recommendation:
- Approved — All requirements met, no deviations or exceptions. Ready for installation/procurement.
- Approved as Noted — All critical requirements met; minor clarifications, conditions, or non-critical deviations noted. Approved with contingencies documented.
- Revise and Resubmit — Specific deficiencies identified. Contractor must address identified items and resubmit. Cite section references and required corrections.
- Rejected — Does not meet fundamental spec requirements. Resubmit with different product/approach or escalate for waiver consideration.
8. Draft Review Comments
- Write in professional, objective tone suitable for RFI response or meeting minutes
- Use structured comment format: [Status] | [Spec Reference] | [Finding] | [Required Action]
- Group comments by spec section or compliance status
- Include recommendations for follow-up (additional testing, certification, shop drawings, etc.)
- Cite all references to spec sections, ASTM standards, test reports
- For non-compliances, specify corrective action required
9. Update Submittal Log
- Record review date, reviewer, recommendation, and comments
- Link to compliance matrix and any supporting documents
- If resubmission, note previous revision status and what changed
- Flag for escalation if needed (structural engineer, code official, etc.)
Review Comment Language Standards
Approved
The submitted [product/material] meets all applicable specification requirements and is approved for [procurement/installation].
Approved as Noted
The submitted [product/material] meets specification requirements subject to the following conditions/clarifications:
- [Condition 1]: [explanation, deadline, or required action]
- Approval granted pending completion of noted items.
Revise and Resubmit
The submitted [product/material] does not meet specification in the following respects:
- [Reference code] [Requirement]: Specification requires [required value]. Submittal provides [submitted value]. [Specific corrective action required].
- [Reference code] [Requirement]: ...
Please resubmit with corrections or request formal waiver if waiver is intended.
Rejected
The submitted [product/material] is not acceptable due to non-compliance with fundamental specification requirements:
- [Critical deficiency 1]
- [Critical deficiency 2]
Resubmit with alternative product meeting all spec requirements, or submit formal waiver request for architect/engineer consideration.
Lead-Time Alert System
The submittal-intelligence skill tracks submittal timelines and flags items at risk of missing critical path deadlines. This system prevents procurement delays, schedule impacts, and last-minute rush approvals.
Must-Submit-By Calculation
Working backwards from each submittal's critical path impact:
Timeline Logic:
- Activity Start Date (from
schedule.json → activities linked to this submittal)
- Minus Material Lead Time (from procurement specs or supplier standard terms)
- Minus Fabrication Time (manufacturer lead time after order placed; typically 2-8 weeks)
- Minus Approval Cycle Time (architect/engineer review to approval):
- Standard products (common, pre-approved): 2-4 weeks
- Complex/custom products (engineered, mock-ups, samples): 4-6 weeks
- Minus Preparation Time (contractor prep of drawings, samples, certifications): 1-2 weeks
Example Calculation:
Activity start date (PEMB erection): 03/23/2026
Minus: PEMB lead time: 30 days
Minus: Fabrication time: Already in PEMB lead time, covered
Minus: Approval cycle (engineered): 4 weeks
Minus: Preparation (drawings ready): 1 week
───────────────────────────────────
Must-submit-by date: 02/02/2026
Alert Tiers
Three escalating alert levels based on days remaining until must-submit-by date:
| Tier | Days Remaining | Status | Action |
|---|
| CRITICAL | Past due (negative) | Red flag | Submittal missed deadline. Escalate to PM/engineer immediately. Assess schedule impact. May require expedited review or change order. |
| WARNING | 0-7 days | Yellow flag | Due within one week. Verify submittal ready for submission. Confirm with architect review slot reserved. Prepare expedited review package if needed. |
| WATCH | 8-21 days | Blue flag | Due within 3 weeks. Monitor preparation progress. Confirm no blockers (missing data, approvals, samples). Schedule architect review. |
| NORMAL | >21 days | Green | On track. No action needed. Continue normal schedule. |
Daily Morning-Brief Auto-Check
The /morning-brief command automatically scans submittal-log.json and generates an alert summary:
Query logic:
- Find all submittals with
status != "approved"
- Calculate
must-submit-by date working backwards from linked schedule activities
- Compare to today's date
- Generate alert for each tier
Morning Brief Output Example:
SUBMITTAL STATUS — ALERTS ONLY (3 items at risk)
🔴 CRITICAL — Past Due
• Nucor PEMB Reaction Drawing (SUB-008)
Status: "under_review" (submitted 02/09, 9 days ago)
Needed by: 02/02 (7 DAYS PAST DUE)
Impact: PEMB erection critical path blocked
Action: Call Nucor today; escalate to CMW architect
🟡 WARNING — Due in 3 Days
• Schiller Door Hardware (SUB-012)
Status: "revision_submitted" (resubmit 02/15)
Needed by: 02/18 (3 days)
Impact: Door procurement dependent
Action: Confirm with architect; hold time slot for review
🔵 WATCH — Due in 18 Days
• Davis & Plomin HVAC Equipment (SUB-015)
Status: "under_review" (submitted 02/10)
Needed by: 03/05 (18 days)
Impact: HVAC procurement, MEP rough-in scheduled 04/27
Action: No urgent action; normal tracking
Project Intelligence Integration
When reviewing submittals or generating alerts, automatically enrich with data from the project intelligence store. These cross-references improve review accuracy and catch procurement/schedule risks early.
Procurement Lead Time Enrichment
Read procurement-log.json → For each submittal, look up the corresponding procurement entry by submittal_id. Pull expected_delivery, lead_time_weeks, and delivery_status → auto-populate fabrication_days and material_lead_time_days in the submittal record. If procurement entry shows delivery_status = "delayed", escalate the submittal alert tier accordingly.
Sub Contact Resolution
Read directory.json → subcontractors[] → When a submittal is overdue or needs follow-up, resolve the responsible sub's foreman name, phone, and email from the directory. Auto-fill contact information in alert action items: "Contact {foreman} at {phone} ({sub_name}) to expedite SUB-{id}."
Inspection Hold Point Linking
Read specs-quality.json → hold_points[] → For each submittal's spec_section, check if any hold points require submittal approval before the inspection can proceed. Flag linked hold points: "SUB-{id} approval is a prerequisite for hold point HP-{hp_id} ({inspection_name}). Inspection cannot proceed until this submittal is approved."
Cost Impact Flagging
Read cost-data.json → For submittals linked to critical path activities or high-value budget line items, show the budget amount at risk if approval is delayed. Include in alert output: "Budget line item {division} — {description}: ${amount} at risk if SUB-{id} delays procurement by {N} days."
Quality Test Correlation
Read quality-data.json → After a submittal is approved (status = "approved"), link subsequent material test results back to the approved submittal. For example, an approved concrete mix design (SUB-XXX) should be cross-referenced when 7-day and 28-day break results arrive: "Break test results for {mix_id} — 28-day f'c = {value} PSI vs. approved design f'c = {design_value} PSI. Status: {pass/fail}."
Installation Verification
Read daily-report-data.json → Flag if materials from a submittal are documented as installed in a daily report before the submittal status = "approved": "WARNING: {material} from SUB-{id} appears installed per daily report #{report_number} on {date}, but submittal status is still '{status}'. Verify approval before installation proceeds."
Submittal-Log Data Structure
For lead-time tracking, each submittal in submittal-log.json must include:
{
"id": "SUB-008",
"item": "PEMB Reaction Drawing",
"spec_section": "05 42 00",
"submitting_sub": "Alexander Construction / Nucor",
"status": "under_review",
"submitted_date": "2026-02-09",
"must_submit_by_date": "2026-02-02",
"approval_cycle_days": 4,
"material_lead_time_days": 30,
"fabrication_days": 0,
"preparation_days": 7,
"linked_schedule_activity_id": "A45-PEMB-Erection",
"linked_activity_start_date": "2026-03-23",
"critical_path_blocked": true,
"days_past_due": 7,
"alert_tier": "CRITICAL",
"notes": "Nucor sent initial, needs revisions for anchor bolt details"
}
Rejection/Resubmission Workflow
When a submittal is rejected or returned for revisions, auto-calculate new timeline impact:
Trigger: Submittal status changes from "under_review" to "revise_and_resubmit" or "rejected"
Auto-Calculation:
- Set new
revision_number (increment from previous)
- Capture original
must_submit_by_date
- Record
rejection_reason from architect's comments
- Estimate resubmission time (typically 3-5 business days for major revisions, 1-2 for minor)
- Add resubmission lead time to today to get new
expected_resubmit_date
- Recalculate new
must_submit_by_date (if 2nd revision, time is even tighter)
- Compare new deadline to original; flag if slipping past must-submit-by
- Alert to PM: "Resubmission due [date]. New approval cycle leaves [N] day margin."
Example Rejection Timeline:
SUB-008 PEMB Reaction Drawing (Nucor)
Original submission: 02/09
Original must-submit-by: 02/02 (MISSED by 7 days)
Rejection date: 02/12
Rejection reason: "Anchor bolt embedment depth needs verification per geotechnical report"
Estimated resubmission: 02/15 (3 days for revisions)
New approval cycle: 4 days (expedited given past-due status)
New must-submit-by: 02/19 (16 days past original deadline!)
Action: Flag to PM; assess schedule impact; consider change order if erection delayed
Resubmission Tracking
Track each revision with separate entries to maintain history:
In submittal-log.json:
{
"id": "SUB-008",
"item": "PEMB Reaction Drawing",
"revision_history": [
{
"revision_number": 1,
"submitted_date": "2026-02-09",
"status": "revise_and_resubmit",
"rejection_reason": "Anchor bolt embedment depth needs verification per geotechnical report",
"rejection_date": "2026-02-12",
"approval_cycle_days": 4,
"must_submit_by_date": "2026-02-02",
"days_late": 7
},
{
"revision_number": 2,
"submitted_date": "2026-02-15",
"expected_approval_date": "2026-02-19",
"status": "under_review",
"approval_cycle_days": 4,
"must_submit_by_date": "2026-02-19",
"days_late": 17,
"turnaround_time_days": 3,
"notes": "Expedited review requested; geotechnical verification confirmed"
}
],
"current_revision_number": 2,
"total_revisions": 2
}
Critical Path Submittal Flagging
Cross-reference each submittal with schedule.json critical path to flag items that will block the schedule if delayed:
Linking logic:
- Submittal's
spec_section maps to schedule.json material requirement
- Check if linked activity has
float = 0 or < 5 days
- If yes, set
critical_path_blocked = true
- These submittals get priority flagging in alerts
Example:
SUB-008 PEMB Reaction Drawing
Linked activity: A45-PEMB-Erection (critical path)
Float: 0 days
Flag: CRITICAL_PATH_BLOCKED = true
Alert priority: Highest — any delay impacts substantial completion
SUB-015 HVAC Equipment Data
Linked activity: A72-MEP-Rough-In (near-critical, float = 5)
Float: 5 days
Flag: CRITICAL_PATH_BLOCKED = false (but near-critical)
Alert priority: Medium — some schedule cushion but tight
Integration with /morning-brief and /daily-report
Morning Brief (/morning-brief):
- Scan all submittals with
status != "approved"
- List only CRITICAL and WARNING tiers (skip WATCH/NORMAL unless requested)
- Include must-submit-by dates and linked activities
- Provide action items for each flagged item
Daily Report (/daily-report):
- Include new rejections or resubmissions in "Open Items" section
- Note any submittals that crossed into CRITICAL or WARNING during the day
- Track turnaround time for resubmissions (days between rejection and resubmit)
- Update schedule impact assessment if critical path activities are affected
Cross-References
- project-data skill — Retrieves project-specific spec sections, approved materials, and submittal requirements
- document-intelligence skill — Parses PDFs and extracts structured data from submittal documents, data sheets, test reports, and shop drawings
- spec-requirement-extraction.md — Detailed guidance on identifying and structuring testable requirements from CSI specs
- compliance-checking.md — Detailed determination rules, evaluation methodology, and review comment templates