| name | building-intake |
| description | Create a source-traceable, privacy-aware building profile before EnergyPlus modeling, calibration, or control studies. |
Building intake
Use this before a new building enters the shared workflow.
- Record conditioned area, use, location/time zone, geometry, envelope, HVAC topology, schedules, utility context, and data coverage.
- Give each material value a status:
SOURCE_FACT, INFERRED_FROM_DATA, ENGINEERING_ASSUMPTION, or UNRESOLVED.
- Normalize units and reconcile floor/shell areas before model authoring.
- Keep a missing-input list; do not fill it with silent defaults.
- If the project is anonymized, use stable pseudonyms and remove addresses, coordinates, account identifiers, owner names, and identifying screenshots.
Produce a profile, an evidence/assumption ledger, and a redaction log when applicable. Model only the number of shells/zones needed to preserve material loads, schedules, and HVAC/control distinctions.