SKILL.md: HSTS — Integrated Planning & Scheduling
Wisdom from Muscettola's HSTS framework for building intelligent systems that unify planning (what to do) and scheduling (when/how to do it). Activates when designing constraint-based agents, solving resource allocation problems, building robust execution systems, or reasoning about commitment under uncertainty.
DECISION POINTS
Decision 1: Unified vs. Separated Planning/Scheduling
IF domain has resources with time-varying availability
AND causal goals interact with resource constraints
AND execution environment is uncertain
→ Use unified state variable approach
→ Model as evolving constraint network
IF problem is purely causal (no resource contention)
→ Classical planning may suffice
IF problem has fixed task structure with only temporal constraints
→ Classical scheduling may suffice
IF you see "planner feeds into scheduler" architecture
→ QUESTION: Is the seam creating coordination debt?
Decision 2: Commitment Level Selection
FOR each variable binding decision:
IF decision is reversible AND more information is coming
→ Post ordering constraint only
→ Example: "A before B" instead of "A at 10:00, B at 11:30"
IF decision resolves high-contention bottleneck (measured via simulation)
→ Commit to specific value now
→ Example: Assign spacecraft antenna to high-priority download
IF tempted to fix exact times early in search
→ STOP: Can ordering relation achieve same progress?
→ Preserve temporal flexibility for executor
Decision 3: Search Focus Priority
BEFORE resolving any disjunction:
1. Run stochastic simulation on current partial solution
2. Sample 100+ paths without resolving open choices
3. Count conflicts per resource-time pair
4. Focus next decision on highest-contention resource
IF search is thrashing (many backtracks, little progress)
→ You're attacking non-bottleneck variables first
→ Re-estimate contention distribution
→ Switch to highest-conflict resource
Decision 4: Domain Modeling Approach
IF domain has objects with internal state evolving over time
→ Model each as state variable with transition graph
→ Example: Satellite antenna {idle, tracking, downloading, slewing}
IF domain has shared resources (consumable/reusable)
→ Model resource levels as state variables
→ Track availability windows, not just capacity numbers
IF expert rules exist ("X and Y can't overlap during Z")
→ Encode as compatibility constraints
→ NOT as search pruning hacks
FAILURE MODES
Anti-Pattern 1: "Nominal Trajectory Planning"
Detection Rule: If schedule output is sequence of exact times/actions with no flexibility
Root Cause: Confusing schedule with execution plan; over-committing temporal decisions
Symptom: Any runtime deviation requires full replanning
Fix: Output behavioral envelopes (constraint networks) not nominal sequences
Timeline: Becomes critical when execution uncertainty > 5% of plan duration
Anti-Pattern 2: "Premature Value Commitment"
Detection Rule: If binding variables to specific values before constraints force it
Root Cause: Not distinguishing between progress and commitment
Symptom: Search space artificially shrunk; solutions exist but aren't found
Fix: Post weakest constraint that enables progress; commit only when forced
Timeline: Shows up immediately in search statistics (solution quality drops)
Anti-Pattern 3: "Bottleneck Ignorance"
Detection Rule: If resolving disjunctions without measuring which matter most
Root Cause: Treating all constraints as equally important
Symptom: Search thrashing on easy variables while hard constraints fester
Fix: Use stochastic simulation to estimate conflict probability before each decision
Timeline: Becomes exponentially worse as problem size grows
Anti-Pattern 4: "Constraint Network Bloat"
Detection Rule: If propagation time grows quadratically with problem size
Root Cause: Not respecting module boundaries; monolithic constraint posting
Symptom: Solver becomes unusably slow on realistic problems
Fix: Decompose into state variable modules; make interaction topology explicit
Timeline: Hits performance wall around 50-100 activities
Anti-Pattern 5: "Expert Knowledge as Hardcoded Heuristics"
Detection Rule: If domain knowledge exists as ad-hoc search pruning rules
Root Cause: Encoding constraints implicitly instead of declaratively
Symptom: Knowledge invisible to debugging; doesn't compose across modules
Fix: Express expert rules as formal compatibility constraints with causal semantics
Timeline: Maintenance nightmare emerges when domain complexity grows
WORKED EXAMPLES
Example 1: Satellite Mission Planning
Scenario: Mars orbiter with 2 instruments (camera, spectrometer), 1 antenna, 4 GB storage. Plan 8-hour observation session with data downlink.
Novice Approach:
- Plan observation sequence first
- Schedule exact start times
- Add downlink at end
Fails when storage constraint discovered late
Expert HSTS Approach:
- Model state variables: storage_level, antenna_state, instrument_states
- Run stochastic simulation: storage fills to 95% probability by hour 3
- Decision: Storage is bottleneck, not antenna time
- Commit to downlink at hour 3 (value commitment for bottleneck)
- Leave observation ordering flexible (constraint posting for non-bottleneck)
- Output: behavioral envelope with storage invariant + flexible observation sequence
Alternative Path Shown: If simulation revealed antenna conflicts instead of storage, would commit to antenna schedule first, leave storage management flexible.
Example 2: Manufacturing Job Shop
Scenario: 5 jobs, 3 machines, delivery deadlines. Machine M2 has 50% uptime, others 90%.
Novice Approach: Schedule assuming all machines available; handle breakdowns reactively.
Expert HSTS Approach:
- Model machine_availability as time-varying state variable
- Stochastic simulation: M2 unavailable 40% of time slots
- Trade-off Analysis:
- Option A: Route critical jobs around M2 (safer, longer makespan)
- Option B: Use M2 with backup plans (shorter nominal, replanning risk)
- Decision: Critical path jobs avoid M2; non-critical use M2 with ordering constraints only
- Output: schedule robust to M2 failures without pessimistic assumption about availability
What Expert Catches: M2 unreliability creates secondary bottleneck at other machines when jobs reroute. Plans for cascade effects.
QUALITY GATES
Schedule is valid and complete when:
Automated Validation Signals:
- Stochastic simulation runs complete without contradiction
- Constraint propagation converges in bounded time
- Multiple distinct solutions exist in final envelope
- Module coupling metrics within acceptable bounds
NOT-FOR BOUNDARIES
This skill should NOT be used for:
- Pure optimization problems without temporal/resource constraints → Use mathematical programming instead
- Real-time reactive control → Use control theory instead
- Simple project management with known task durations → Use critical path method instead
- Problems where optimal solution required → Use complete search methods instead
- Domains where expert knowledge unavailable → Use machine learning approaches instead
Delegation Rules:
- For route planning: use
path-planning-algorithms instead
- For resource allocation without time: use
constraint-satisfaction-methods instead
- For predictive analytics: use
time-series-forecasting instead
- For execution monitoring: use
plan-execution-monitoring instead
Boundary Signals: If you're spending more effort encoding the domain than solving instances, consider whether classical OR methods might suffice for your use case.