| name | team-process |
| description | Engineering team process patterns: OKR definition and scoring, sprint planning and retros, roadmap structuring (now/next/later), feature breakdown into user stories with acceptance criteria, and engineering metrics (DORA, velocity). For product lifecycle see product-lifecycle skill. |
Team Process
Scope: Engineering team rituals, planning frameworks, and delivery metrics.
For product discovery and PRD creation, see product-lifecycle.
For feature breakdown into sprint tasks, use /breakdown.
When to Activate
- Writing OKRs for a quarter
- Running sprint planning or retrospectives
- Creating a product roadmap
- Defining engineering team metrics
- Structuring a feature into user stories and acceptance criteria
- Setting up team working agreements
- Reviewing an existing process for bottlenecks or missing feedback loops
OKR Framework
Structure
Objective (qualitative, inspiring, 1 sentence):
"Become the fastest checkout experience in our category"
Key Results (measurable, 3-5 per objective):
KR1: Reduce checkout time from 120s to 45s (median)
KR2: Increase checkout completion rate from 68% to 82%
KR3: Achieve p95 checkout latency < 2s on mobile
KR4: 0 payment data incidents this quarter
OKR quality checklist
OKR anti-patterns
| Anti-pattern | Example | Fix |
|---|
| Activity KR | "Launch feature X" | "Feature X increases activation by 15%" |
| Sandbagging | KR you'll hit 100% easily | Set 70% = good |
| Too many | 8 objectives × 5 KRs = 40 KRs | Max 3 objectives × 4 KRs |
| No baseline | "Improve response time" | "Improve p95 latency from 800ms to 300ms" |
| Vanity metric | "Reach 100k users" | "90-day retention reaches 40%" |
OKR scoring
At quarter end:
- 0.7–1.0: Strong (if consistently 1.0, your targets were too easy)
- 0.4–0.6: Partial — review blockers
- < 0.4: Missed — root cause analysis required
Sprint Planning
Sprint structure (2-week sprints)
Day 1: Sprint planning (1-2h)
Days 2-9: Execution (daily standup 15min)
Day 10: Code freeze + testing
Day 11: Sprint review (30min) + Retrospective (1h)
Day 12: Buffer / planning for next sprint
Sprint planning agenda
-
Capacity (10 min): How many story points can we commit?
- Default team velocity × 0.8 (leave 20% buffer for unplanned)
- Account for PTO, interviews, on-call
-
Backlog refinement (20 min): Review top stories from backlog
- Stories must have acceptance criteria before entering sprint
- Stories > 5 pts must be broken down
-
Commitment (20 min): Select stories for the sprint
- Fill to capacity × 0.8
- Assign owners for each story
-
Sprint goal (5 min): One sentence summarizing the sprint's theme
Sprint goal format
By end of sprint [N], users will be able to [capability], which delivers [value].
Daily standup (async-friendly format)
Yesterday: [what I completed]
Today: [what I'm working on]
Blockers: [what's blocking me, who I need help from]
Retrospective formats
Start/Stop/Continue (default):
- Start: what should we begin doing?
- Stop: what's hurting us that we should stop?
- Continue: what's working well?
4Ls (for deeper reflection):
- Liked: what went well?
- Learned: what did we learn?
- Lacked: what was missing?
- Longed for: what do we wish we had?
Action item format:
Action: [specific action]
Owner: [one person, not "the team"]
Due: [next sprint / specific date]
Roadmap Structuring
Now / Next / Later format
| Horizon | Timeframe | Status | Commitment level |
|---|
| Now | Current quarter | In progress or committed | High — specific features |
| Next | Next 1-2 quarters | Planned | Medium — themes and epics |
| Later | 6+ months | Exploratory | Low — opportunities, not commitments |
Roadmap item format
[Theme/Epic] — [one-line description]
Value: [outcome for users]
Metrics: [how we'll measure success]
Status: [Now / Next / Later]
Dependencies: [teams or external]
Roadmap anti-patterns
- Feature factory: listing features without outcomes — always state the user value
- Over-committing Later: Later items should be opportunities, not promises
- Missing dependencies: calling out what blocks what
- No metrics: every item should have a measurable success criteria
Engineering Metrics
DORA (DevOps Research and Assessment) metrics
| Metric | Elite | High | Medium | Low |
|---|
| Deployment frequency | Multiple/day | Weekly | Monthly | < Monthly |
| Lead time for changes | < 1 hour | 1 day | 1 week | > 1 month |
| Change failure rate | < 5% | 10% | 15% | > 30% |
| MTTR | < 1 hour | < 1 day | < 1 week | > 1 week |
Measuring DORA
select
count(*) / 30.0 as deploys_per_day
from deploys
where deployed_at >= now() - interval '30 days'
and environment = 'production';
select
count(case when caused_incident then 1 end) * 1.0 / count(*) as failure_rate
from deploys
where deployed_at >= now() - interval '30 days';
select
avg(extract(epoch from (resolved_at - started_at)) / 3600) as mttr_hours
from incidents
where resolved_at is not null
and started_at >= now() - interval '90 days';
Team health metrics
| Metric | How to measure | Target |
|---|
| Velocity | Story points per sprint | Stable (not maximized) |
| Unplanned work % | Unplanned pts / total pts | < 20% |
| Cycle time | Story created → merged | < 3 days |
| PR size | Lines changed per PR | < 400 lines |
| Test coverage | % branches covered | ≥ 80% |
| On-call burden | Pages per engineer per week | < 2 |
Working Agreements Template
## Team Working Agreements — [Team Name]
### Communication
- Default async: Slack for non-urgent, PR comments for code
- Response time: < 4h during business hours for direct messages
- Meeting-free blocks: Tuesday and Thursday 9am-12pm
### Code review
- PRs reviewed within 1 business day
- At least 1 approver required; 2 for core systems
- PR size: keep under 400 lines; break up larger changes
### On-call
- Rotation: 1 week per engineer, team of [N] = 1 week every [N] weeks
- Handoff: 30min sync at rotation end
- Runbook for every alert
### Definition of done
- Unit tests written and CI passing
- PR reviewed and approved
- Deployed to staging and manually tested
- Product sign-off for user-visible changes
- Docs updated if behavior changed
### Meetings
- All meetings have an agenda sent 24h before
- Decisions documented in the meeting notes within 24h
- Recurring meetings reviewed monthly for relevance
Engineering Metrics — DORA + SPACE
Engineering team effectiveness is measured with the DORA Four Keys framework and complemented by the SPACE framework for developer experience.
DORA Four Keys (measurement layer)
| Metric | Elite | High | Medium | Low |
|---|
| Deploy Frequency | Multiple/day | Daily–weekly | Weekly–monthly | < Monthly |
| Lead Time | < 1h | 1d–1wk | 1wk–1mo | > 1mo |
| Change Failure Rate | 0–15% | 16–30% | 16–30% | 46–60% |
| MTTR | < 1h | < 1d | 1d–1wk | > 1wk |
Team level = lowest single-metric rating. Use for team improvement — never for individual performance evaluation (Goodhart's Law).
Monthly Review Cadence
Use /engineering-review for structured monthly reviews combining DORA trends, leading indicators (PR size, CI duration, review turnaround), tech debt movement, and team wellbeing signals.
Quarterly DevEx Survey
Use /devex-survey to design anonymous developer experience surveys. Measures: Flow State, Feedback Loops, Cognitive Load, Collaboration, Wellbeing.
Related
- product-lifecycle — product discovery, idea → PRD
- incident-response — MTTR improvement, incident process
- engineering-metrics — DORA Four Keys, SPACE framework theory
- dora-implementation — technical DORA data extraction
/breakdown command — break epic into sprint-ready stories
/prd command — write a Product Requirements Document
/dora-baseline command — measure team's current DORA baseline
/devex-survey command — design a developer experience survey
/engineering-review command — monthly engineering health review