用 Codex 或 Claude 帮你安装 复制这段 Prompt,粘贴到 Codex、Claude 或其他助手里,让它检查 Skill 页面并帮你完成安装。
直接命令不会经过审查 Prompt;运行前请先检查来源。
npx skills add https://github.com/MikeTreml/MissionControl --skill changeover-optimizer命令会保持在同一行。复制前请横向滚动并检查完整内容。
想先保存到本地?可下载 SkillsMP 当前能够提供的文件。
基于 SOC 职业分类
正在显示 SKILL.md
| name | changeover-optimizer |
| description | Setup and changeover time reduction skill with SMED methodology and sequence optimization |
| allowed-tools | ["Read","Write","Glob","Grep","Edit"] |
| metadata | {"specialization":"operations","domain":"business","category":"workflow-automation"} |
The Changeover Optimizer skill provides comprehensive capabilities for reducing setup and changeover times. It supports SMED (Single-Minute Exchange of Die) methodology, sequence optimization, and changeover time tracking.
skill: changeover-optimizer
inputs:
equipment: "Injection Molding Press 5"
current_changeover_time: 120 # minutes
target_changeover_time: 30
changeover_data:
video_analysis: "changeover_video_url"
task_breakdown:
- task: "Remove old mold"
time: 15
type: "internal"
- task: "Get new mold from storage"
time: 20
type: "internal"
- task: "Install new mold"
time: 25
type: "internal"
- task: "Connect utilities"
time: 15
type: "internal"
- task: "Adjust parameters"
time: 25
type: "internal"
- task: "Run test shots"
time: 20
type: "internal"
outputs:
- current_state_analysis
- internal_external_separation
- improvement_opportunities
- optimized_procedure
- changeover_matrix
- implementation_plan
| Type | Definition | Goal |
|---|---|---|
| Internal | Must stop machine | Minimize |
| External | Machine running | Maximize |
Current State:
- Total time: 120 minutes
- Internal: 100 minutes
- External: 20 minutes
Improvement Opportunities:
1. Move mold retrieval to external: -20 min
2. Pre-heat mold: -10 min
3. Use quick-clamps: -15 min
4. Parallel connection work: -10 min
5. Eliminate test shots: -15 min
Target State:
- Total time: 30 minutes
- Internal: 25 minutes
- External: 35 minutes
| From / To | Product A | Product B | Product C |
|---|---|---|---|
| Product A | - | 30 min | 45 min |
| Product B | 35 min | - | 25 min |
| Product C | 40 min | 30 min | - |
| Technique | Application |
|---|---|
| Quick-release clamps | Replace bolts |
| Intermediate jigs | Pre-positioned tooling |
| Color coding | Visual identification |
| One-turn fasteners | Reduce turns required |
| Standardized heights | Eliminate adjustments |
| Preset gauges | Eliminate measurement |