用 Codex 或 Claude 帮你安装 复制这段 Prompt,粘贴到 Codex、Claude 或其他助手里,让它检查 Skill 页面并帮你完成安装。
直接命令不会经过审查 Prompt;运行前请先检查来源。
npx skills add https://github.com/MikeTreml/MissionControl --skill change-management命令会保持在同一行。复制前请横向滚动并检查完整内容。
想先保存到本地?可下载 SkillsMP 当前能够提供的文件。
Expert Electron application architecture skill for IPC design, main/renderer/preload boundaries, security hardening, performance optimization, packaging strategy, native integration, and cross-platform desktop development. Use when reviewing or designing Electron apps, planning migrations, auditing architecture risks, choosing IPC patterns, diagnosing startup or memory issues, or coordinating related Electron skills.
Generates DrawIO XML diagrams for Amazon Web Services architectures from text descriptions or images. Analyzes existing .drawio files to extract AWS components. Use for AWS architecture diagrams, cloud infrastructure documentation, or when converting AWS diagram images to editable DrawIO format.
Generates DrawIO XML diagrams for Google Cloud Platform architectures from text descriptions or images. Analyzes existing .drawio files to extract GCP components. Use for GCP architecture diagrams, cloud infrastructure documentation, or when converting GCP diagram images to editable DrawIO format.
基于 SOC 职业分类
正在显示 SKILL.md
| name | change-management |
| description | Skill for engineering change request and order processing through PLM systems |
| allowed-tools | ["Read","Write","Glob","Grep","Bash"] |
| metadata | {"specialization":"mechanical-engineering","domain":"science","category":"design-review-documentation","priority":"medium","phase":7,"tools-libraries":["PTC Windchill","Siemens Teamcenter","Dassault ENOVIA"]} |
The Engineering Change Management skill provides capabilities for managing engineering changes through PLM systems, ensuring controlled modification of designs with proper impact assessment and approval workflow.
| Type | Description | Urgency | Approval Level |
|---|---|---|---|
| Class I | Form/fit/function change | Normal | Full review |
| Class II | Minor change, no F/F/F impact | Normal | Limited review |
| Deviation | Temporary non-conformance | Varies | Engineering |
| Waiver | Accept as-is before build | Varies | Engineering |
| Emergency | Safety/production critical | Urgent | Expedited |
1. Change Request (ECR)
- Problem/opportunity identification
- Preliminary impact assessment
- Initial approval to investigate
2. Change Investigation
- Detailed impact analysis
- Solution development
- Cost/schedule estimation
3. Change Order (ECO)
- Formal change documentation
- Approval routing
- Implementation planning
4. Implementation
- Document updates
- Manufacturing notification
- Effectivity management
5. Closure
- Verification of implementation
- Record completion
Required information:
- Problem statement
- Proposed solution (if known)
- Originator and date
- Affected items (preliminary)
- Impact assessment (preliminary)
- Priority/urgency
- Supporting documentation
| Category | Assessment Questions |
|---|---|
| Technical | Does it affect performance, reliability, safety? |
| Cost | What is development and recurring cost impact? |
| Schedule | What is timeline impact? |
| Manufacturing | Does it affect tooling, processes, suppliers? |
| Service | Does it affect spare parts, maintenance procedures? |
| Regulatory | Does it affect certifications, approvals? |
Required sections:
1. Change description
- What is changing
- Why change is needed
- How change will be implemented
2. Affected items list
- Part numbers
- Document numbers
- Revision levels (from/to)
3. Impact assessment
- By category (cost, schedule, technical)
- Risk assessment
4. Interchangeability
- Form/fit/function analysis
- Backward compatibility
5. Effectivity
- Serial number/date effectivity
- Retrofit requirements
6. Implementation plan
- Tasks and responsibilities
- Timeline
- Verification requirements
| Code | Meaning | Action |
|---|---|---|
| D | Direct interchangeable | Replace anywhere |
| O | One-way interchangeable | New replaces old only |
| N | Not interchangeable | Separate part number |
| R | Retrofittable | Can upgrade old units |
Form:
- Dimensions unchanged?
- Mounting unchanged?
- Interfaces unchanged?
Fit:
- Assembly process unchanged?
- Mating parts unaffected?
- Clearances maintained?
Function:
- Performance unchanged?
- Reliability maintained?
- Safety unaffected?
Typical approval levels:
1. Originator - Complete ECR/ECO
2. Design Engineering - Technical review
3. Analysis Engineering - Impact verification
4. Manufacturing Engineering - Process review
5. Quality Assurance - Compliance review
6. Program Management - Cost/schedule review
7. Configuration Management - Release authority
8. Customer (if required) - Acceptance
| Role | Focus Areas |
|---|---|
| Design Engineering | Technical correctness |
| Manufacturing | Producibility, tooling |
| Quality | Inspection, compliance |
| Supply Chain | Supplier impact, cost |
| Program Management | Schedule, budget |
| Customer | Contract compliance |
Serial number effectivity:
- Starting serial: S/N 100
- Ending serial: S/N 199 (or blank for ongoing)
Date effectivity:
- Effective date: 2026-02-01
Lot effectivity:
- Starting lot: LOT-2026-001
Implementation considerations:
- Work-in-process inventory
- Finished goods inventory
- Field units
- Spare parts inventory
- Documentation updates
- Training requirements
| Type | Update Required | Responsibility |
|---|---|---|
| Drawings | New revision | Design |
| Models | New revision | Design |
| Specifications | As needed | Engineering |
| Procedures | As needed | Manufacturing |
| Manuals | As needed | Publications |
| Training | As needed | Training |
{
"change_type": "ECR|ECO|deviation|waiver",
"problem_statement": "string",
"proposed_solution": "string",
"affected_items": [
{
"item_number": "string",
"current_revision": "string",
"item_type": "part|document|process"
}
],
"priority": "normal|urgent|emergency",
"originator": "string",
"supporting_documents": "array of references"
}
{
"change_document": {
"number": "string",
"type": "ECR|ECO",
"status": "draft|in_review|approved|implemented|closed"
},
"impact_assessment": {
"technical": "string",
"cost": "number",
"schedule": "string",
"manufacturing": "string"
},
"interchangeability": {
"code": "D|O|N|R",
"justification": "string"
},
"approval_routing": {
"current_step": "string",
"approvers"