Reconcile the project's FPF state with recent repository changes
creates draft task file in .specs/tasks/draft/ with original user intent
Evaluate and improve Claude Code commands, skills, and agents. Use when testing prompt effectiveness, validating context engineering choices, or measuring improvement quality.
基于 SOC 职业分类
正在显示 SKILL.md
| name | plan-do-check-act |
| description | Iterative PDCA cycle for systematic experimentation and continuous improvement |
| argument-hint | Optional improvement goal or problem to address |
Apply PDCA cycle for continuous improvement through iterative problem-solving and process optimization.
Four-phase iterative cycle: Plan (identify and analyze), Do (implement changes), Check (measure results), Act (standardize or adjust). Enables systematic experimentation and improvement.
/plan-do-check-act [improvement_goal]
/why or /cause-and-effect)CYCLE 1
───────
PLAN:
Problem: Docker build takes 45 minutes
Current State: Full rebuild every time, no layer caching
Root Cause: Package manager cache not preserved between builds
Hypothesis: Caching dependencies will reduce build to <10 minutes
Change: Add layer caching for package.json + node_modules
Success Criteria: Build time <10 minutes on unchanged dependencies
DO:
- Restructured Dockerfile: COPY package*.json before src files
- Added .dockerignore for node_modules
- Configured CI cache for Docker layers
- Tested on 3 builds
CHECK:
Results:
- Unchanged dependencies: 8 minutes ✓ (was 45)
- Changed dependencies: 12 minutes (was 45)
- Fresh builds: 45 minutes (same, expected)
Analysis: 82% reduction on cached builds, hypothesis confirmed
ACT:
Standardize:
✓ Merged Dockerfile changes
✓ Updated CI pipeline config
✓ Documented in README
✓ Added build time monitoring
New Problem: 12 minutes still slow when deps change
→ Start CYCLE 2
CYCLE 2
───────
PLAN:
Problem: Build still 12 min when dependencies change
Current State: npm install rebuilds all packages
Root Cause: Some packages compile from source
Hypothesis: Pre-built binaries will reduce to <5 minutes
Change: Use npm ci instead of install, configure binary mirrors
Success Criteria: Build <5 minutes on dependency changes
DO:
- Changed to npm ci (uses package-lock.json)
- Added .npmrc with binary mirror configs
- Tested across 5 dependency updates
CHECK:
Results:
- Dependency changes: 4.5 minutes ✓ (was 12)
- Compilation errors reduced to 0 (was 3)
Analysis: npm ci faster + more reliable, hypothesis confirmed
ACT:
Standardize:
✓ Use npm ci everywhere (local + CI)
✓ Committed .npmrc
✓ Updated developer onboarding docs
Total improvement: 45min → 4.5min (90% reduction)
✓ PDCA complete, monitor for 2 weeks
CYCLE 1
───────
PLAN:
Problem: 8 production bugs per month
Current State: Manual testing only, no automated tests
Root Cause: Regressions not caught before release
Hypothesis: Adding integration tests will reduce bugs by 50%
Change: Implement integration test suite for critical paths
Success Criteria: <4 bugs per month after 1 month
DO:
Week 1-2: Wrote integration tests for:
- User authentication flow
- Payment processing
- Data export
Week 3: Set up CI to run tests
Week 4: Team training on test writing
Coverage: 3 critical paths (was 0)
CHECK:
Results after 1 month:
- Production bugs: 6 (was 8)
- Bugs caught in CI: 4
- Test failures (false positives): 2
Analysis: 25% reduction, not 50% target
Insight: Bugs are in areas without tests yet
ACT:
Partially successful:
✓ Keep existing tests (prevented 4 bugs)
✓ Fix flaky tests
Adjust for CYCLE 2:
- Expand test coverage to all user flows
- Add tests for bug-prone areas
→ Start CYCLE 2
CYCLE 2
───────
PLAN:
Problem: Still 6 bugs/month, need <4
Current State: 3 critical paths tested, 12 paths total
Root Cause: UI interaction bugs not covered by integration tests
Hypothesis: E2E tests for all user flows will reach <4 bugs
Change: Add E2E tests for remaining 9 flows
Success Criteria: <4 bugs per month, 80% coverage
DO:
Week 1-3: Added E2E tests for all user flows
Week 4: Set up visual regression testing
Coverage: 12/12 user flows (was 3/12)
CHECK:
Results after 1 month:
- Production bugs: 3 ✓ (was 6)
- Bugs caught in CI: 8 (was 4)
- Test maintenance time: 3 hours/week
Analysis: Target achieved! 62% reduction from baseline
ACT:
Standardize:
✓ Made tests required for all PRs
✓ Added test checklist to PR template
✓ Scheduled weekly test review
✓ Created runbook for test maintenance
Monitor: Track bug rate and test effectiveness monthly
✓ PDCA complete
PLAN:
Problem: PRs take 3 days average to merge
Current State: Manual review, no automation
Root Cause: Reviewers wait to see if CI passes before reviewing
Hypothesis: Auto-review + faster CI will reduce to <1 day
Change: Add automated checks + split long CI jobs
Success Criteria: Average time to merge <1 day (8 hours)
DO:
- Set up automated linter checks (fail fast)
- Split test suite into parallel jobs
- Added PR template with self-review checklist
- CI time: 45min → 15min
- Tracked PR merge time for 2 weeks
CHECK:
Results:
- Average time to merge: 1.5 days (was 3)
- Time waiting for CI: 15min (was 45min)
- Time waiting for review: 1.3 days (was 2+ days)
Analysis: CI faster, but review still bottleneck
ACT:
Partially successful:
✓ Keep fast CI improvements
Insight: Real bottleneck is reviewer availability, not CI
Adjust for new PDCA:
- Focus on reviewer availability/notification
- Consider rotating review assignments
→ Start new PDCA cycle with different hypothesis
/analyse-problem (A3) for comprehensive documentation