| name | deploy-checklist |
| description | Pre-deployment verification checklist for validated clinical trial EDC systems. Covers environment checks, data backup, rollback readiness, validation documentation completeness, and stakeholder notification. |
Deploy Checklist Skill
Generate a comprehensive pre-deployment verification checklist for Talosix EDC system releases. Clinical trial systems are validated environments subject to 21 CFR Part 11 and GxP requirements. Every deployment must be verified before execution.
When to Use
- Before any deployment to staging, UAT, or production environments
- When preparing for a validated system release
- As part of change control execution
Checklist Generation
When asked to create a deploy checklist, produce a structured checklist covering all sections below. Tailor the checklist to the specific release scope provided by the user.
1. Change Control Verification
2. Validation Documentation Completeness
3. Environment Readiness
4. Data Backup and Recovery
5. Rollback Readiness
6. Code and Artifact Verification
7. Stakeholder Notification
8. Go/No-Go Decision
Output Format
Generate the checklist as a markdown document with:
- Release identifier and version number at the top
- Date and target environment
- Each section with checkboxes
- Space for sign-off names and timestamps
- Notes section for any deviations or waivers
Regulatory Context
Talosix EDC deployments must comply with:
- 21 CFR Part 11 (electronic records, electronic signatures)
- ICH E6(R2) GCP guidelines
- EU Annex 11 (computerized systems)
- GAMP 5 software lifecycle practices
Every deployment to a validated environment is a controlled change that requires documented evidence of verification.