Skip to main content

thermal-overload-mitigation

Senior power-engineer playbook for overloaded lines and transformers. Use whenever power-flow or contingency studies show loading above ratings — including escalations from a tool skill where branch loading exceeds 100% of its rating. Triggers on "line overloaded", "transformer above rating", "relieve congestion", or "redispatch to unload". Gives an operationally credible sequence of redispatch, topology, phase-shifter, and reinforcement actions rather than only flagging the overload.

跳到安装

来源信息

仓库
Power-Agent/PowerSkills
最近来源活动
2026年8月22日 17:19
检测到的 SKILL.md 语言
英语
星标
64
分支
14

安装方式

默认使用会先检查来源的 Prompt;你也可以切换为直接命令,或下载本地副本。

检查来源文件

决定是否安装前,请先阅读 SKILL.md,以及 SkillsMP 当前展示的配套文件。