estimate
Estimates task effort by analyzing complexity, dependencies, historical velocity, and risk factors. Produces a structured estimate with confidence levels.
用 Codex 或 Claude 帮你安装 复制这段 Prompt,粘贴到 Codex、Claude 或其他助手里,让它检查 Skill 页面并帮你完成安装。
菜单
Estimates task effort by analyzing complexity, dependencies, historical velocity, and risk factors. Produces a structured estimate with confidence levels.
用 Codex 或 Claude 帮你安装 复制这段 Prompt,粘贴到 Codex、Claude 或其他助手里,让它检查 Skill 页面并帮你完成安装。
基于 SOC 职业分类
Creates an Architecture Decision Record (ADR) documenting a significant technical decision, its context, alternatives considered, and consequences. Every major technical choice should have an ADR.
Audits game assets for compliance with naming conventions, file size budgets, format standards, and pipeline requirements. Identifies orphaned assets, missing references, and standard violations.
Analyzes game balance data files, formulas, and configuration to identify outliers, broken progressions, degenerate strategies, and economy imbalances. Use after modifying any balance-related data or design.
Guided game concept ideation — from zero idea to a structured game concept document. Uses professional studio ideation techniques, player psychology frameworks, and structured creative exploration.
Creates a structured bug report from a description, or analyzes code to identify potential bugs. Ensures every bug report has full reproduction steps, severity assessment, and context.
Auto-generates a changelog from git commits, sprint data, and design documents. Produces both internal and player-facing versions.
| name | estimate |
| description | Estimates task effort by analyzing complexity, dependencies, historical velocity, and risk factors. Produces a structured estimate with confidence levels. |
| argument-hint | [task-description] |
| user-invocable | true |
| allowed-tools | Read, Glob, Grep |
When this skill is invoked:
Read the task description from the argument. If the description is too vague to estimate meaningfully, ask for clarification before proceeding.
Read STUDIO.md for project context: tech stack, coding standards, architectural patterns, and any estimation guidelines.
Read relevant design documents from design/gdd/ if the task relates
to a documented feature or system.
Scan the codebase to understand the systems affected by this task:
Read past sprint data from production/sprints/ if available:
Analyze the following factors:
Code Complexity:
Scope:
Risk:
Generate the estimate:
## Task Estimate: [Task Name]
Generated: [Date]
### Task Description
[Restate the task clearly in 1-2 sentences]
### Complexity Assessment
| Factor | Assessment | Notes |
|--------|-----------|-------|
| Systems affected | [List] | [Core, gameplay, UI, etc.] |
| Files likely modified | [Count] | [Key files listed below] |
| New code vs modification | [Ratio, e.g., 70% new / 30% modification] | |
| Integration points | [Count] | [Which systems interact] |
| Test coverage needed | [Low / Medium / High] | [Unit, integration, manual] |
| Existing patterns available | [Yes / Partial / No] | [Can follow existing code or new ground] |
**Key files likely affected:**
- `[path/to/file1]` -- [what changes here]
- `[path/to/file2]` -- [what changes here]
- `[path/to/file3]` -- [what changes here]
### Effort Estimate
| Scenario | Days | Assumption |
|----------|------|------------|
| Optimistic | [X] | Everything goes right, no surprises, requirements are clear |
| Expected | [Y] | Normal pace, minor issues, one round of review feedback |
| Pessimistic | [Z] | Significant unknowns surface, blocked for a day, requirements change |
**Recommended budget: [Y days]**
[If historical data is available: "Based on [N] similar tasks that averaged
[X] days actual vs [Y] days estimated, a [correction factor] adjustment has
been applied."]
### Confidence: [High / Medium / Low]
**High** -- Clear requirements, familiar systems, follows existing patterns,
similar tasks completed before.
**Medium** -- Some unknowns, touches moderately complex systems, partial
precedent from previous work.
**Low** -- Significant unknowns, new technology, unclear requirements, or
cross-cutting concerns across many systems.
[Explain which factors drive the confidence level for this specific task.]
### Risk Factors
| Risk | Likelihood | Impact | Mitigation |
|------|-----------|--------|------------|
| [Specific risk] | [High/Med/Low] | [Days added if realized] | [How to reduce] |
| [Another risk] | [Likelihood] | [Impact] | [Mitigation] |
### Dependencies
| Dependency | Status | Impact if Delayed |
|-----------|--------|-------------------|
| [What must be done first] | [Done / In Progress / Not Started] | [How it affects this task] |
### Suggested Breakdown
| # | Sub-task | Estimate | Notes |
|---|----------|----------|-------|
| 1 | [Research / spike] | [X days] | [If unknowns need investigation first] |
| 2 | [Core implementation] | [X days] | [The main work] |
| 3 | [Integration with system X] | [X days] | [Connecting to existing code] |
| 4 | [Testing and validation] | [X days] | [Writing tests, manual verification] |
| 5 | [Code review and iteration] | [X days] | [Review feedback, fixes] |
| | **Total** | **[Y days]** | |
### Historical Comparison
[If similar tasks exist in sprint history:]
| Similar Task | Estimated | Actual | Relevant Difference |
|-------------|-----------|--------|-------------------|
| [Past task 1] | [X days] | [Y days] | [What makes it similar/different] |
| [Past task 2] | [X days] | [Y days] | [What makes it similar/different] |
### Notes and Assumptions
- [Key assumption that affects the estimate]
- [Another assumption]
- [Any caveats about scope boundaries -- what is included vs excluded]
- [Recommendations: e.g., "Consider a spike first if requirement X is unclear"]