| description | Extracts building equipment data from project documents (PCNA, CNA, iAuditor reports, equipment survey forms) and submits a structured equipment survey to Audette, triggering re-modelling of the building's carbon reduction plan. Use whenever the user wants to fill out an equipment survey, add equipment data to a building in Audette, submit HVAC details, or update building systems. Triggers on: "add equipment data for [property]", "fill in the equipment survey", "submit HVAC info to Audette", "update [property]'s systems", "extract equipment from the PCNA". Also use proactively when the user shares a PCNA, CNA, or iAuditor report and a building already exists in Audette for that property.
|
| version | 1.0.0 |
| requires | ["audette-mcp"] |
Audette Equipment Survey
Read property documents, extract building equipment details, map to Audette's schema,
confirm with the user, and submit — triggering a fresh model run.
Required: Audette MCP
Step 1: Pre-flight
Read .audette-config.json. If missing, tell the user to run workspace-setup first.
Call switch_customer_account with audette_account.uid.
Identify the target building from buildings[] by name, or ask the user. Note the building_model_uid.
Step 2: Check Existing Survey
Call get_equipment_survey with the building_model_uid.
If a survey already exists, show a summary of the populated sections and ask:
"An equipment survey already exists for this building. Update specific sections, or replace entirely?"
⚠️ Never assume an existing survey is correct — audit its *_size units first. Earlier runs (and
imports) stored the WRONG units in *_size fields — kW, kW-scaled, or tank volume in litres/gallons —
which silently corrupt the whole energy model. Before treating a stored survey as usable, sanity-check
every size against the tons rule (see "Unit conversions" below):
- a
domestic_hot_water_heater_size that equals tank litres/gallons (e.g. 169 for ~45-gal tanks) is wrong;
- a
terminal_heater_size/_cooler_size far below the load the equipment implies (e.g. 268 when
254 units × 36 MBH ÷ 12 ≈ 762 tons, or 199 when the DX load is 565 tons) is kW-scaled, not tons.
When a stored size fails the check, re-derive it in tons and OVERWRITE the survey via
submit_equipment_survey — do not carry the bad value forward, and do not report the survey as
"already correctly sized." A complete survey in the wrong units is worse than none.
If updating, focus extraction on the sections the user wants to change.
If this is a first submission, continue with full extraction.
Step 3: Extract Equipment Data
Read source documents. Consult:
references/equipment-schema.md — full field list and valid enum values
references/terminology-map.md — translate document language into Audette enum values
references/audette-topology.md — how each equipment type drives the energy model (multipliers, fuel resolution, rooftop detection mapping, common pitfalls)
references/submission-guide.md — exact call format, complete payload template, all 15 API validation rules, valid system combinations, error handling — read this before Step 5
Determine primary heating fuel first (topology doc Section 1) — it affects every
downstream calculation. Use the fuel resolution priority rule before proceeding to other sections.
Document priority
| Document type | Best for |
|---|
| iAuditor / site survey | Most reliable — direct observation. Equipment type, install year, condition. |
| PCNA / CNA | HVAC type, boiler/chiller size, DHW, elevators |
| Equipment survey forms | Model numbers → infer type and capacity |
| Offering memoranda | High-level system descriptions — verify against PCNA |
What to extract (section by section)
Work through each section of references/equipment-schema.md. For each:
- Search documents for relevant equipment
- Map terminology using
references/terminology-map.md
- Record the value and source (document + page/section)
- If a field can't be found: leave it
null. Don't guess silently — flag it for the user.
Start with _exists flags — they determine whether the rest of a section matters.
Air handling: Look for "AHU", "MAU", "makeup air", "ERV", "HRV", "DOAS", "exhaust fan". Note heating/cooling integration and supply airflow rate (CFM).
Central plant heater: Look for "boiler", "furnace". Note fuel type, efficiency (AFUE), brand. Note distribution: baseboard, fan coil, VAV. Check for district heat connections. Note capacity — submit in ton-equivalents (do not convert to kW).
Central plant cooler: Look for "chiller", "cooling tower", "condenser water loop". Note tonnage — submit in tons (do not convert to kW).
Central plant heat pump: Look for central-plant-level heat pumps (not suite mini-splits). Note ASHP vs. GSHP. Note capacity — submit in ton-equivalents (do not convert to kW).
Domestic hot water: Look for "DHW", "water heater", "hot water tank". Note fuel, central vs. suite-level. Note capacity as a ton-equivalent (see the note on DHW below — this is the heater's thermal capacity, not tank volume).
Rooftop units: Look for "RTU", "packaged unit on roof". Note heating fuel and whether cooling is DX. Note supply airflow if documented.
Terminal cooler: Look for suite-level or zone-level cooling-only equipment — PTACs, window ACs, split ACs. Distinct from heat pumps.
Terminal heater: Look for suite-level or zone-level heating-only equipment — electric baseboards, unit heaters, gas PTACs. Note capacity — submit in ton-equivalents (do not convert to kW).
Distributed heat pumps: Look for "mini-split", "ductless heat pump", "water loop heat pump", "WLHP". Note COP if in specs. Note whether heat pumps handle all heating/cooling load or share it with another system (→ load_ratio).
Visual identification from rooftop imagery: Arrays of small gray boxes along the roof centerline typically indicate split_air_source_heat_pump systems. Count of boxes ≈ number of suites served.
Other equipment: Check for laundry facilities (washer/dryer type, common or in-suite), elevators (count, approximate install year), escalators, rooftop solar PV (kW nameplate).
Generic HVAC: Note anything that doesn't fit the above — radiant panels, pool heating, district energy connections, unit heaters on a separate loop. Every field is required; see references/equipment-schema.md for the full generic structure.
Unit conversions
| From | To | Multiply by |
|---|
| MBH | tons | ÷ 12 |
| BTU/h | tons | ÷ 12,000 |
| kW | tons | ÷ 3.517 |
| gallons | litres | × 3.785 (tank volume only — see DHW note below) |
All heating, cooling, and DHW capacity sizes (central_plant_cooler_size, central_plant_heater_size, central_plant_heat_pump_size, terminal_cooler_size, terminal_heater_size, terminal_heater_cooler_size, heat_pump_size, domestic_hot_water_heater_size) must be submitted as ton-equivalents — never kW, never litres/gallons. Per Christopher (2026-07-16): "all heating cooling and DHW size must be converted to ton equivalents." This overrides ANY reference doc (references/equipment-schema.md, references/submission-guide.md, references/audette-topology.md, references/terminology-map.md) that shows kW, litres, or gallons for these *_size fields — if you see that, the reference doc is stale, not the requirement.
DHW note: a DHW heater's nameplate/recovery capacity is a thermal rating (BTU/h or kW input) — convert that to tons the same way as any other heating capacity, and prefer this whenever it's documented. Rule of thumb when only tank volume is known (no nameplate/recovery rating in the source): tons ≈ gallons ÷ 40 (litres ÷ 151), based on typical storage water heater sizing (~4.5 kW element per 40–50 gal tank ≈ 1 ton per ~40 gal, for both electric and gas storage units). Flag when this fallback was used instead of an actual nameplate rating, so it's distinguishable from a documented value.
Decrypting password-protected PDFs
If the Read tool fails on a PDF:
pip install pikepdf --break-system-packages
python3 -c "
import pikepdf, sys
src = sys.argv[1]
dst = src.replace('.pdf', '_decrypted.pdf')
pikepdf.open(src, password='').save(dst)
print(f'Decrypted → {dst}')
" "<path>"
Step 4: Confirm with the User
Present a summary table before submitting anything:
Building: [Name] ([building_model_uid])
Existing survey: [Yes — submitted YYYY-MM-DD] / [None]
Extracted equipment:
Section | Field | Value | Source
----------------------|------------------------------|--------------------|------------------
central_plant_heater | type | gas_boiler | PCNA p.14
central_plant_heater | terminal_units | baseboards | PCNA p.14
central_plant_heater | size | 30 tons (3×120 MBH ÷ 12) | PCNA p.14
central_plant_heater | install_year | 1994 | PCNA p.14
domestic_hot_water | type | gas_heater | PCNA p.15
domestic_hot_water | central_distribution | true | PCNA p.15
...
⚠️ Not found — please supply or confirm null:
- air_handling_equipment type
- heat_pump COP values
Ask the user to confirm or correct before proceeding. For ambiguous fields, ask directly rather than making a silent choice.
Step 4b: Pre-validate Against API Rules
Before submitting, verify the payload does not violate the 15 API validation rules
listed in references/submission-guide.md. Key checks:
domestic_hot_water_heater_exists must be true — API always requires DHW
central_plant_cooler and terminal_cooler are mutually exclusive — pick one
central_plant_heater and terminal_heater are mutually exclusive — pick one
- At least one of
air_handling_equipment_exists or rooftop_unit_exists must be true
- If
rooftop_unit_exists = true, rooftop_unit_cooling_type must be provided
- If
heat_pump_type = "water_loop_heat_pump", a boiler must exist (Rule 13) and no chiller (Rule 14)
- Furnace types conflict with: unit heaters, baseboards, central cooling, most AHU types (Rules 9–12)
Flag any conflicts in the confirmation table and ask the user to resolve before submitting.
Step 5: Submit
Call submit_equipment_survey with the building_model_uid and the complete equipment_survey dict.
Every top-level section must be present, even if _exists is false (set all other fields to null).
Use the empty template from references/equipment-schema.md as a starting point and fill in confirmed values.
For generic_hvac_equipment: pass [] if no generic equipment. If items exist, all fields are required and non-nullable — omit the entry entirely rather than passing null values.
Re-modelling is triggered automatically on successful submission.
Step 6: Confirmation
Equipment survey submitted.
Building: [building_name]
Sections: [list of sections where exists=true]
Re-modelling: triggered — updated carbon plan will be available shortly
[If any sections were null:]
Not provided: [list] — these can be updated later by running this skill again.
Next steps:
1. Energy data → audette-energy-data
2. Full report → report
Error Handling
MCP rejects the survey
Audette rejected the survey: [error]. This usually means an invalid enum value or a required field is missing. Check the field named in the error and resubmit.
Equipment found in documents but type is ambiguous
I found [description] in [source]. This could be [option A] or [option B]. Which is correct?
No source documents found
No PCNA, CNA, or equipment survey documents found in this workspace. Please add the relevant files and try again — or answer the questions manually.
Rules
- Always call
switch_customer_account before any MCP calls
- Always check for an existing survey before extracting
- Never submit without user confirmation (Step 4)
- Never invent equipment not mentioned in source documents —
null is better than a wrong value
- Every section must be in the payload; omitting sections causes API errors
- Flag all ambiguous values in the confirmation table rather than silently choosing
- For
generic_hvac_equipment, all fields are required and non-nullable — omit the entry rather than passing nulls