Skip to main content
在 Manus 中运行任何 Skill
一键导入
GitHub 仓库

cc-thinking-skills

cc-thinking-skills 收录了来自 tjboudreaux 的 39 个 skills,并提供仓库级职业覆盖和站内 skill 详情页。

已收集 skills
39
Stars
814
更新
2026-06-07
Forks
125
职业覆盖
5 个职业分类 · 已分类 100%
仓库浏览

这个仓库中的 skills

thinking-bounded-rationality
其他计算机职业

Use when a search or investigation could run indefinitely and you need a stopping rule. Set an explicit "good enough" threshold and stop at the first option that clears it.

2026-06-07
thinking-effectuation
市场调研分析师与营销专员

Start with means, not goals; co-create with partners; leverage contingencies. Use for startup strategy, innovation projects, and uncertain/novel domains where planning is unreliable.

2026-06-07
thinking-first-principles
其他计算机职业

When a constraint is treated as fixed ("too expensive", "impossible", "always done this way"), ask whether it's physics or just convention, then rebuild from what's actually true.

2026-06-07
thinking-jobs-to-be-done
市场调研分析师与营销专员

Deciding what to build or why a feature isn't adopted. Reframe from features to the "job" users hire the product for — the progress they seek — to prioritize and position.

2026-06-07
thinking-kepner-tregoe
软件开发工程师

Use when a defect is selective (some endpoints/regions/users/times affected, not all) and the cause is unclear — map what IS vs IS-NOT affected; the boundary contrast points at the root cause.

2026-06-07
thinking-leverage-points
软件开发工程师

Use when picking where to intervene in a system and tuning parameters keeps not sticking—rank candidate interventions by Meadows' hierarchy and choose the highest-leverage point you can move.

2026-06-07
thinking-lindy-effect
软件开发工程师

Choosing a technology/framework/dependency and longevity matters. Use the heuristic that for non-perishable things, expected remaining life is proportional to current age — favor the proven.

2026-06-07
thinking-margin-of-safety
软件开发工程师

Use when provisioning capacity, setting a timeout/limit, or committing to an estimate under uncertainty. Size a buffer to the cost of being wrong instead of optimizing to the edge.

2026-06-07
thinking-occams-razor
软件开发工程师

Use when multiple causes could explain a bug — test the fewest-assumption hypothesis first; escalate to complex only when evidence forces it. Skip the full procedure when one step resolves it.

2026-06-07
thinking-ooda
软件开发工程师

Use under time pressure (incident, outage, debugging a moving target) when you must act before you have certainty—cycle Observe→Orient→Decide→Act on ~70% confidence, then re-observe.

2026-06-07
thinking-opportunity-cost
软件开发工程师

Before committing scarce time/people/money to one thing, ask "what's the next-best use of these resources, and what does doing nothing cost?" — the real cost is the best option you skip.

2026-06-07
thinking-pre-mortem
软件开发工程师

Before committing to a plan or launch, assume it has already failed and reason backward through why — prospective hindsight surfaces risks that "what could go wrong?" misses.

2026-06-07
thinking-reversibility
软件开发工程师

Before deliberating over a decision, ask if it's a one-way door (costly to undo) or two-way (cheap to undo) — decide two-way doors fast, and look for moves that make one-way doors reversible.

2026-06-07
thinking-steel-manning
软件开发工程师

Use before rejecting a proposal or when you're inclined to just agree with the user. Build the strongest version of the opposing case first, then engage that — not a weak version.

2026-06-07
thinking-thought-experiment
软件开发工程师

You need to trace how a system would fail or behave at a scale you can't cheaply test or measure. Use to imagine the scenario and walk the consequence chain step by step.

2026-06-07
thinking-triz
软件开发工程师

Use when stuck between two architecture or API requirements that seem mutually exclusive — name the contradiction precisely, then separate the conflicting states in time, space, or condition.

2026-06-07
thinking-via-negativa
软件开发工程师

About to add a feature/layer/process to fix a problem. First ask what to remove instead — subtraction is often more robust than addition. Use for simplification and complexity reduction.

2026-06-07
thinking-archetypes
软件开发工程师

Use when the same problem keeps recurring despite fixes, growth stalled with no obvious cause, or a quick fix made things worse—match it to a known structural pattern instead of re-diagnosing.

2026-06-07
thinking-bayesian
软件开发工程师

Use when interpreting a test result, metric, or new evidence and you risk over-reacting to it. State the base rate first, then update belief by the likelihood ratio.

2026-06-07
thinking-debiasing
软件开发工程师

In a long trajectory where you're defending a path you committed to early, run a quick self-check for sunk-cost and confirmation bias before continuing — only when evidence is being explained away.

2026-06-07
thinking-dual-process
软件开发工程师

Use when an answer arrives too fast on a high-stakes or unfamiliar task. Force one explicit verification pass before committing instead of shipping the first plausible answer.

2026-06-07
thinking-feedback-loops
软件开发工程师

Use when a system shows runaway growth/collapse, oscillates around a target, or resists change, and you need to find the loop driving it. Identifies reinforcing/balancing loops and delays.

2026-06-07
thinking-fermi-estimation
软件开发工程师

Use when you need a number you can't measure and can't look up. Decompose the unknown into estimable factors and multiply for an order-of-magnitude answer. Don't Fermi a lookup-able value.

2026-06-07
thinking-inversion
软件开发工程师

When planning work where optimism may be hiding risks, ask "how would I guarantee this fails?" — enumerate failure paths, then turn the top ones into explicit requirements to avoid.

2026-06-07
thinking-model-selection
软件开发工程师

Choose the right mental model for the problem at hand. Use when facing new problems, when current approaches fail, or when you need to match tool to context.

2026-06-07
thinking-regret-minimization
项目管理专家

When advising a human on a high-stakes, hard-to-undo life/career choice, weigh the asymmetry between a recoverable downside and a permanent missed opportunity, not just the short-term cost.

2026-06-07
thinking-five-whys-plus
软件开发工程师

Use when a fault is localized to a component and the proximate cause is known but the systemic root is not — chain 'why' with evidence, a counterfactual cause test, and an explicit stop condition.

2026-06-07
thinking-map-territory
软件开发工程师

Use when behavior contradicts the docs, tests, diagram, or your assumption — stop reasoning from the description, go verify the running code or data directly, and let the territory overrule the map.

2026-06-07
thinking-red-team
信息安全分析师

Use when reviewing code, auth, or APIs for security vulnerabilities — adopt an attacker mindset, enumerate the attack surface, report only findings with a concrete reproducible attack path.

2026-06-07
thinking-systems
软件开发工程师

Use when debugging across services/an incident where a fix in one place breaks another, or behavior is emergent and no single component explains it. Maps the system and traces causes.

2026-06-01
thinking-model-router
软件开发工程师

Route to the right mental model based on your domain and problem type. The single entry point for all thinking skills.

2026-06-01
thinking-scientific-method
软件开发工程师

Use when a symptom could have several causes and you must find the faulty code by ranking falsifiable hypotheses and checking the cheapest discriminating observation first.

2026-06-01
thinking-circle-of-competence
软件开发工程师

Use when you're unsure whether you actually know the answer. If you lack the evidence or context to answer reliably, abstain, ask, or fetch it — don't confabulate a confident reply.

2026-06-01
thinking-cynefin
软件开发工程师

Use when unsure how to approach a problem—plan, analyze, experiment, or stabilize first. Classify it by cause-effect (clear/complicated/complex/chaotic) and match the approach to the domain.

2026-06-01
thinking-model-combination
项目管理专家

Combine multiple mental models for richer analysis. Use for complex problems requiring multiple lenses, high-stakes decisions, or when single models leave blind spots.

2026-06-01
thinking-probabilistic
项目管理专家

Use when stating a forecast, estimate, or risk. Anchor on the base rate, give a confidence range instead of a point, and update the number when new evidence arrives.

2026-06-01
thinking-second-order
项目管理专家

When a change has effects past the immediate fix (incentives, scale, feedback loops), ask "and then what?" across horizons before committing — the obvious fix often backfires downstream.

2026-06-01
thinking-socratic
项目管理专家

Use before building when a request is vague, assumption-laden, or "obvious." Ask the clarifying questions that surface hidden requirements and false premises instead of guessing.

2026-06-01
thinking-theory-of-constraints
项目管理专家

Use when optimizing latency or throughput in a pipeline and one stage dominates—focus all effort on that single bottleneck, since speeding up the others changes nothing until it's fixed.

2026-06-01