一键导入
synthesis
Gate 6 - Must-Be-True Conditions, Exit Criteria, risk assessment, recommendation
用 Codex 或 Claude 帮你安装 复制这段 Prompt,粘贴到 Codex、Claude 或其他助手里,让它检查 Skill 页面并帮你完成安装。
菜单
Gate 6 - Must-Be-True Conditions, Exit Criteria, risk assessment, recommendation
用 Codex 或 Claude 帮你安装 复制这段 Prompt,粘贴到 Codex、Claude 或其他助手里,让它检查 Skill 页面并帮你完成安装。
基于 SOC 职业分类
Introduction to the Deliberate Decisions framework - use when helping humans make high-stakes decisions
Gate 4 - Consolidate Facts vs Assumptions, update Knowns/Unknowns, create assumption inventory
Gate 5 - Pre-mortem, steel-man opposition, surface biases, second-order effects
Gate 7 - Document final decision, rationale, and commit to artifact
Gate 3 - Web search, document analysis, reference class, gather evidence
Gate 2 - Surface Decision Points, Intersections, alternatives, and initial Knowns/Unknowns
| name | synthesis |
| description | Gate 6 - Must-Be-True Conditions, Exit Criteria, risk assessment, recommendation |
Purpose: Integrate all findings into a clear recommendation with explicit conditions.
Announce: "Moving to Synthesis Gate - let's integrate our findings."
Identify assumptions that must hold for the decision to succeed.
Focus on:
For each condition:
Ask:
Define tripwires before making the decision - conditions that would trigger reversal or pause.
This counters the sunk-cost fallacy by pre-committing to exit conditions when thinking is clear.
For each tripwire:
Ask:
Consolidate risks from all previous gates.
For each risk:
Calculate overall risk profile:
Check against risk tolerance:
Formulate the recommendation based on the complete analysis.
Format:
The recommendation is the AI's assessment based on the evidence. The human decides.
Present the decision-maker with clear options:
| Option | Description |
|---|---|
| Proceed | Accept the recommendation and move forward |
| Reject | Decline based on analysis - document why |
| Pause | Need more information before deciding |
| Revisit | Return to earlier gate for deeper analysis |
Each option leads to documentation in the Decision Gate.
| Aspect | Light | Medium | Complete |
|---|---|---|---|
| Must-Be-True | Top 3 conditions | 5-6 conditions | Comprehensive list |
| Exit criteria | 1-2 basic tripwires | 3-4 specific tripwires | Detailed with thresholds + dates |
| Risk assessment | High-level summary | Consolidated risks | Full risk matrix |
| Recommendation | Brief with rationale | Standard format | Comprehensive with confidence reasoning |
Light: Focus on top 3 Must-Be-True conditions. 1-2 basic exit criteria. High-level risk summary. Brief recommendation.
Medium: 5-6 Must-Be-True conditions. 3-4 specific exit criteria with thresholds. Consolidated risk assessment. Standard recommendation format.
Complete: Comprehensive Must-Be-True list. Detailed exit criteria with specific thresholds and review dates. Full risk matrix. Comprehensive recommendation with confidence reasoning.
At Synthesis, upgrade detection focuses on whether the analysis is sufficient:
Suggest upgrading if:
Upgrade prompt:
⚠️ Synthesis is difficult because:
- [Cannot clearly articulate what must be true]
- [Risks are higher than we can confidently assess]
- [My recommendation confidence is [Low] for a decision of this magnitude]
This suggests we may benefit from deeper analysis in earlier gates.
Options:
1. Continue at [Weight] - accept higher uncertainty
2. Return to [Gate] for deeper analysis
3. Upgrade remaining gates to [Higher Weight]
Which approach?
Update decision artifact with synthesis:
# Synthesis Gate Summary
## Must-Be-True Conditions
| Condition | Confidence | Consequence if False |
|-----------|------------|---------------------|
| [Condition 1] | [High/Med/Low] | [What happens if wrong] |
| [Condition 2] | [High/Med/Low] | [What happens if wrong] |
| [Condition 3] | [High/Med/Low] | [What happens if wrong] |
## Exit Criteria
| Tripwire | Threshold | Action | Review Date |
|----------|-----------|--------|-------------|
| [Metric 1] | [Value] | [Pause/Reverse/Escalate] | [Date] |
| [Metric 2] | [Value] | [Pause/Reverse/Escalate] | [Date] |
## Risk Assessment
| Risk | Likelihood | Impact | Mitigation | Source Gate |
|------|------------|--------|------------|-------------|
| [Risk 1] | [H/M/L] | [H/M/L] | [Action] | [Gate name] |
| [Risk 2] | [H/M/L] | [H/M/L] | [Action] | [Gate name] |
| [Risk 3] | [H/M/L] | [H/M/L] | [Action] | [Gate name] |
### Overall Risk Profile
- **High-Impact Risks**: [count]
- **Catastrophic Risks**: [Yes/No - describe if yes]
- **Risk Concentration**: [Where risk clusters]
- **Risk Tolerance Match**: [Within/Exceeds tolerance]
## Recommendation
**RECOMMENDATION:** [Proceed / Do Not Proceed / Pause]
**CONFIDENCE:** [High / Medium / Low]
**RATIONALE:** [2-3 sentence summary of why this recommendation]
**KEY CONDITIONS:**
1. [Must-Be-True Condition 1]
2. [Must-Be-True Condition 2]
3. [Must-Be-True Condition 3]
**PRIMARY RISKS:**
1. [Risk 1]
2. [Risk 2]
3. [Risk 3]
Save to: docs/decisions/YYYY-MM-DD-<decision-slug>/decision.md (update existing)
Watch for:
Proceed to: deliberate-decisions:decision-capture