Skip to main content
yezhwi
GitHub 创作者资料

yezhwi

按仓库查看 2 个 GitHub 仓库中的 11 个已收集 skills。

已收集 skills
11
仓库
2
更新
2026年8月29日
仓库分布

Skills 分布在哪些仓库

按已收集 skill 数展示主要仓库,并显示它们在该创作者目录中的占比和职业覆盖。

仓库浏览

仓库与代表性 skills

engineering-harness
未分类

Use when starting or resuming a task in a repo with .harness/ state, when unsure which harness phase comes next, or when asked to run the Engineering Harness loop end-to-end. Orchestrates the fixed state machine; MUST NOT implement business code itself.

2026年8月29日
diagnosability-review
未分类

Review Q2/Q3 changed business paths for production diagnosability and persist structured review input.

2026年8月29日
task-contract
未分类

Turn a User Requirement into a Task Contract: Acceptance Criteria, Requirements, Invariants, Risks, Verification Plan. Produces .harness/requirements.yaml and .harness/invariants.yaml and advances task state CREATED -> SPECIFYING -> PLANNED. This skill MUST…

2026年8月29日
adversarial-review
未分类

Adversarial review of a Task Contract: construct failure scenarios, attempt to violate Requirements and Invariants. Produces .harness/findings/FND-nnn.yaml files with status=PROPOSED only. This skill MUST NOT confirm bugs, review code style, or suggest…

2026年8月28日
reproduce-finding
未分类

Reproduce an adversarial finding through the mandatory lifecycle PROPOSED -> REPRODUCING -> CONFIRMED (bug reproduced, test RED) -> FIXING -> FIXED (test GREEN) -> VERIFIED (full regression) -> CLOSED, or REJECTED. Each status has one meaning and its own…

2026年8月25日
complexity-reviewer
未分类

Review verified diff for unnecessary implementation complexity before adversarial review.

2026年8月25日
minimal-implementation
未分类

Run before implementation to record minimal necessary approach using Harness Decision Ladder.

2026年8月25日
convergence
未分类

Use when quality_gate.py has returned PASS or BLOCKED and the loop must decide to finish (CONVERGED/DONE), continue iterating, or escalate. Applies v0.1 escalation rules with no scoring.

2026年8月24日
已展示 8 / 10 个已收集 Skill。
已展示 2 / 2 个仓库
已展示全部仓库