Apply when committing, pushing, opening or updating a PR, writing a pull request, creating release notes, or closing out remote CI. Enforces the opencode-swarm invariant audit, release-note fragment workflow, full validation suite, issue comment requirement, and post-PR lifecycle rules.
Apply when committing, pushing, opening or updating a PR, writing a pull request, creating release notes, or closing out remote CI. Enforces the opencode-swarm invariant audit, release-note fragment workflow, full validation suite, issue comment requirement, and post-PR lifecycle rules.
bun --smol test tests/unit/config --timeout 60000
for f in tests/unit/tools/*.test.ts; do bun --smol test"$f" --timeout 30000; done
If invariant 7 is touched, confirm the writing-tests skill was loaded and that new test seams avoid leaking mock.module.
Step 0 - Session start hygiene
Run before publication work:
git fetch origin main
rm -f .swarm/evidence/pr_body.md
rm -f .swarm/evidence/commit-pr-validation.md
rm -f .swarm/evidence/publication-evidence.json
git status --short
Delete ONLY those three exact publication-cache files. NEVER broad-delete
.swarm/evidence/*.json — that directory also holds authoritative task/gate
evidence ({taskId}.json), final-council.json, and phase-council records
(issue #2131 finding 4a).
On Windows, prefer temporary save branches over git stash. If you must stash, use git stash push --include-untracked and verify the stash contents.
If this changeset edited any SKILL.md file's wording, also run file:.swarm/bundled-skills/skill-edit-validation/SKILL.md's content-assertion sweep before committing, to catch stale test assertions.
Step 1 - Commit and PR titles
Use conventional commit format <type>(<scope>): <description> exactly.
description is lowercase and does not end with a period
The squash merge commit message must match the PR title exactly.
Note: The PR title MUST follow <type>(<scope>): <description> exactly — CI runs action-semantic-pull-request which will fail the check-title job if the format is wrong. Do not deviate from this format.
Step 2 - Release note fragment
Create a pending release fragment and do not calculate a version manually.
Required file shape:
docs/releases/pending/<unique-slug>.md
The fragment should cover:
what changed
why
migration steps, if any
breaking changes, if any
known caveats
Ground-truth verification (mandatory)
Before finalizing a release note fragment, verify every concrete reference
against the actual codebase:
File paths: grep -r "path/to/file" — confirm each referenced file
exists at the stated path.
Script names: check package.json scripts or scripts/ directory.
Attribute/variable names: grep for the exact identifier in src/.
Environment variables: grep for the exact name in src/ and config.
Remove or correct any reference that does not resolve. AI-generated
fragments frequently hallucinate paths and names — this step is not
optional.
Bot authors (e.g. [bot], Copilot) and docs/workflow/meta-only changes (no src/, tests/, scripts/, package.json, etc.) are exempt from this requirement by CI; all other PRs that touch code must include a fragment.
Do not manually edit:
package.json version
CHANGELOG.md
.release-please-manifest.json — exception: reconciliation when the manifest desyncs from actual releases (see below)
For the full release-please manifest desync diagnosis and fix protocol, read references/pr-incident-playbook.md.
Step 3 - Mandatory validation suite
Run the full validation stack before pushing. The exact commands may be narrowed only when the repo contract or current task explicitly justifies it in evidence, not by intuition.
Pre-flight
dist/ is not committed (#1047) — do not stage it. Confirm the build succeeds:
bun run build
node --input-type=module -e "await import('./dist/index.js'); console.log('dist import OK')"
Tier 1 - quality
Run both linter AND formatter — e.g., bunx @biomejs/biome@<version> check --write . or equivalent — because CI quality gates reject code that passes tests but fails style validation. Pin the tool version to match the version in package.json (@biomejs/biome); unversioned bunx biome resolves to a different version than the CI gate uses. (the repo script bun run lint:ci runs the pinned Biome version; prefer it over invoking bunx biome directly).
bun run typecheck
bun run lint:ci
bun run scripts/check-tool-registration.ts
bun run check:mock-cleanup
bun run check:invariants
bun run check:cross-contamination
bun run check:test-clock
bun run check:runtime-src-refs
bun run check:events
bun run check:retention
bun run check:registry-citations
bun run check:core-events
bun run check:shell-audit
bun run check:trajectory-store
bun run check:test-file-cap
bun run check:pending-fragment
bun run check:gate-portability
bun run check:bare-spawn
bun run check:test-tmpdir
bun run check:bash-portability
bun run check:error-channel-discard
bun run check:token-formula
(cd scripts/swarm-model && node --test)
bun run package:smoke
This list is the FULL blocking CI quality contract (issue #2131 finding 4c):
every quality-job step in .github/workflows/ci.yml plus the package:smoke
pack check. tests/unit/skills/commit-pr-validation-parity.test.ts derives the
list from the workflow — if CI adds a quality step, the parity test fails until
this skill teaches it.
Tier 2 - unit tests
bun run test:unit:ci # CI-equivalent unit gate (quarantine ledgers + retry budget)
bun run test:unit:ci <file>... # scoped mode: run only the listed repo-relative test files
bun run test:unit:ci runs scripts/ci/run-unit-tests-local.ts, the CI-equivalent unit gate with per-platform quarantine ledgers (scripts/ci/quarantined-tests.txt, quarantined-tests-macos.txt, quarantined-tests-windows.txt) and the retry budget. The full serial run is 45–90 min, so use the scoped mode (bun run test:unit:ci <file>...) when the evidence justifies narrowing (e.g. you only touched one module). This closes the gap the hand-rolled loops left (~40% of CI's colocated src/** tests were uncovered).
Tier 3 - integration
bun test tests/integration ./test --timeout 120000
Tier 4 - security and adversarial
bun test tests/security --timeout 120000
bun test tests/adversarial --timeout 120000
Tier 5 - smoke
bun test tests/smoke --timeout 120000
Pre-existing failure handling
If a failure looks unrelated, prove it on clean origin/main before carrying it into the PR body:
git worktree add /tmp/repro-check origin/main
cd /tmp/repro-check
bun install --frozen-lockfile
bun run build
bun --smol test <repo-relative-path-to-failing-test> --timeout 120000
cd ..
git worktree remove /tmp/repro-check
If the failure reproduces on main, document it under ## Pre-existing failures. Do not silently inherit it.
dist/ is generated, not committed
dist/ is build output and is git-ignored (#1047); do not stage or commit it, and
there is no dist-check drift gate. The authoritative artifact check is package-check,
which runs npm pack and verifies the packed tarball is complete (type declarations,
grammar assets), installs it in a temp project, imports it under Node, and runs the CLI.
A package-check failure is a source / build / package.json#files problem — fix the
source or manifest and rebuild; never "commit dist to make CI green." CI builds dist/
itself (the unit, package-check, and smoke jobs run bun run build), and
release/publish builds from source.
Step 4 - Workflow changes
If any .github/workflows/*.yml file changed, every third-party uses: must be pinned to a full 40-character SHA.
Step 5 - History shape
Before opening a PR, verify no local-only files are staged:
Prefer a single clean commit for the branch before initial PR publication. Resolve the canonical remote first (see "Canonical remote resolution" below), then squash/push:
If the PR is from a fork (head repository differs from base repository), GitHub requires explicit workflow approval after every push. CI jobs will remain in "waiting" status until approved:
# List pending runs
gh run list --repo <upstream-owner>/<upstream-repo> --branch <branch-name> --limit 5
# Approve the pending run
gh api -X POST repos/<upstream-owner>/<upstream-repo>/actions/runs/<run-id>/approve
This requires actions: write permission on the base repository. See the fork-pr-operations skill for the full protocol including race conditions, permission requirements, and stale CI verification.
Pre-push: Push Protection and Canonical Remote
Before git push, run both checks:
Push protection scan — scan for literal secret patterns that trigger GitHub push protection:
For full details, patterns, workarounds, and anecdotes, read references/pr-incident-playbook.md.
Step 6 - PR creation
Before generating the PR body, read .swarm/issue-reference.json. If it exists and
contains a number field, auto-populate Closes #<number> as the first line of the
PR body. If the file does not exist, fall back to the Closes #<issue-number> placeholder.
PR body requirements:
Closes #<issue-number> as the first line when the PR resolves an issue
## Summary
## Invariant audit
## Test plan
CI enforces both the section ORDER (Summary, then Invariant audit, then Test plan) and that each heading is on its own line with nothing trailing but whitespace (see .github/workflows/pr-standards.yml).
Publication-gate evidence
A repository publication gate (.github/hooks/pr-publication-gate.json ->
scripts/copilot-pr-publication-gate.sh) may block gh pr create, gh pr edit,
and gh pr ready until publication evidence exists. Before publishing, write:
.swarm/evidence/pr_body.md — the exact PR body you will publish (must contain
## Summary, ## Invariant audit, and ## Test plan).
.swarm/evidence/commit-pr-validation.md — the validation commands you ran and
their results.
.swarm/evidence/publication-evidence.json — the versioned, freshness-bound
receipt (issue #2131 finding 4b). The gate verifies it against the CURRENT git
state and the EXACT body being published:
pr_number may be added once the PR exists (for gh pr edit / gh pr ready).
If HEAD changes, the body is edited, or you rerun validation, REGENERATE this
receipt — a stale or mismatched receipt is rejected by the gate.
These files live under .swarm/ (runtime state, never committed) and double as the
evidence the gate checks. Keep them current if you edit the PR body or rerun
validation. The CI pr-standards check enforces the same body contract server-side.
If this session is running an issue trace (/swarm issue --trace), call
record_issue_publication with the issue number, PR number, URL, and HEAD sha immediately
after gh pr create (or after gh pr edit / gh pr ready for an existing PR).
This is what lets the issue-trace workflow reach its terminal published state —
without it the trace stays at publication_handoff and is NOT considered resolved.
Step 6a - PR monitoring subscription
After PR creation, if the project uses PR monitoring (pr_monitor.enabled: true
in resolved opencode-swarm config), the new PR must be subscribed for background
monitoring:
Automatic (default): when pr_monitor.auto_subscribe_on_pr_create is
enabled (default true), the subscription is created automatically after
gh pr create succeeds — no command needed. Verify with /swarm pr status
if in doubt.
Manual fallback: when auto-subscribe is disabled or did not fire, run
/swarm pr subscribe <pr-url>, which records the subscription and
lazy-starts the polling worker.
The post-subscription monitoring protocol — event intake, triage
(fix / ask / skip), bounded-retry escalation, and terminal-state behavior —
lives in the swarm-pr-subscribe skill (../swarm-pr-subscribe/SKILL.md).
Step 6.5 - Issue comment
If the PR closes an issue, post a comment on the issue. This is mandatory.
The issue comment must include:
the PR link
what changed
how to use it
migration steps or "No migration required"
Uses the same UTF-8-no-BOM file-write pattern as Step 6 above.
$comment = @"
Fixed in PR #<pr-number>.
## What changed
- <bullet 1>
- <bullet 2>
## How to use
```json
{ "config": "example" }
```
## Migration
No migration required.
"@
$utf8NoBom = New-Object -TypeName System.Text.UTF8Encoding -ArgumentList $false
$issueCommentPath = Join-Path ([System.IO.Path]::GetTempPath()) "issue-comment.txt"
[System.IO.File]::WriteAllText($issueCommentPath, $comment, $utf8NoBom)
gh issue comment <issue-number> --body-file $issueCommentPath
If the PR merged before this was done, post the missing issue comment immediately.
Commit messages
PowerShell parens/brackets/backticks/dollar-signs in git commit -m "..." fail. Use the same UTF-8-no-BOM file-write pattern (see Step 6), then git commit -F <file>.
Step 7 - Existing PR follow-up and closeout
If a PR already exists for the branch:
do not open a second PR
inspect unresolved PR feedback surfaces before updating or readying the PR: review threads/comments, requested-changes reviews, CI/check failures, mergeability/conflicts, and whether check data belongs to the current head SHA
use ../swarm-pr-feedback/SKILL.md when feedback needs fixes before closeout
update the existing PR body when summary, invariant evidence, test counts, caveats, or pre-existing failure notes changed
keep the PR draft while follow-up edits are still expected or required checks are still pending
mark the PR ready only after the body is current and required remote checks are green, unless the user explicitly wants it ready earlier
after any follow-up push or force-push, verify the PR head matches the expected commit and that reported checks belong to the current headRefOid:
After resolving merge conflicts or syncing a stale branch:
verify there are no local unmerged paths or conflict markers,
push the conflict-resolution commit,
verify GitHub reports both mergeable: MERGEABLE and
mergeStateStatus: CLEAN, not merely that local markers are gone, and
keep a conflict/branch-drift item in the PR closure ledger when it affected
the PR.
If GitHub still reports DIRTY, BLOCKED, or stale checks after local conflict
resolution, fetch current origin/main again and re-evaluate before claiming the
conflict is resolved.
GitHub auto-merge race condition
With a merge queue enabled, prefer queuing over manual freshness rebases. If you encounter "fetch first" errors after a fresh fetch, GitHub may have auto-pushed a merge commit. Recovery: force-push your local commit with --force-with-lease. See references/pr-incident-playbook.md for full diagnosis and recovery steps.
Check closeout
gh pr checks --watch --fail-fast is useful but can lag or flatten matrix and
downstream jobs. When the PR checks view looks stale, missing, or inconsistent,
use the workflow run as the authoritative detail:
MCP environments: When using GitHub MCP tools instead of gh, prefer
get_check_runs over get_status. The get_status method uses GitHub's
legacy commit status API: it returns state: "pending" even when all GitHub
Actions jobs are green, because Actions creates check-runs (not legacy
statuses). get_check_runs returns the actual job results.
gh run view <run-id> --json headSha,status,conclusion,jobs,url
Keep watching after unit jobs pass; this repository may enqueue integration and
smoke jobs later in the same CI run. Do not call the PR green until the current
headRefOid has all required jobs completed successfully.
If a previous run from an older PR head is still in progress or already failed
and is blocking the current head's workflow through concurrency, inspect it with
gh run view <run-id> --json headSha,status,conclusion,jobs,url. Cancel only
obsolete older-head runs that are no longer relevant to the PR head you are
validating, then wait for the current-head checks to complete.
If you edit the PR body after checks are green, expect PR Standards / title
checks to rerun. Re-check before claiming final green or merge-readiness.
Merge queue (current-base validation)
Read file:.swarm/bundled-skills/merge-queue-readiness/SKILL.md for the full pre-queue merge-group CI simulation protocol.
When main has a GitHub merge queue enabled, do not rebase or force-push a PR
solely because main advanced. Once required checks and review are green, add the
PR to the merge queue; GitHub re-runs the required workflows against the queued
change on top of the latest main (and any earlier queued PRs) before merging, so
manual "freshness" rebases are unnecessary.
Still rebase/force-push when there is a real reason: a genuine merge conflict,
a stale review thread that depends on current SHAs, or a correctness issue that only
appears against current main. The queue handles up-to-date validation; it does not
resolve conflicts for you.
Required workflows trigger on both pull_request and merge_group. PR-only checks
(title/body validation) no-op to success on merge_group because the PR already
satisfied them before being queued.
Step 8 - Cancelled jobs and skipped dependents
If a required GitHub Actions job is cancelled and downstream jobs are skipped:
inspect the run:
gh run view <run-id> --json status,conclusion,jobs,url
if the cancellation looks like orchestration or infrastructure rather than a code failure, rerun the failed or cancelled jobs:
gh run rerun <run-id> --failed
re-check the PR until required jobs are green:
gh pr checks <number> --watch --fail-fast
Do not call the PR green or merge-ready while a required job is cancelled, skipped, in_progress, or otherwise non-green unless the user explicitly accepts that state.
Step 9 - Pre-merge checklist
invariant audit is complete and current
required build and validation commands ran for touched invariants
test_runner was not used with broad repo-validation scopes
release fragment exists and version files are untouched
dist/ was NOT staged (it is generated output, not committed — #1047)
PR body has Closes, ## Summary, ## Invariant audit, and ## Test plan
if this was review follow-up, the PR body was refreshed to match current evidence
if the PR resolves an issue, the issue comment was posted with PR link, what changed, how to use it, and migration notes
if any required job was cancelled and dependent jobs skipped, the run was rerun or the non-green state was explicitly accepted by the user
for high-risk work (security, isolation, IPC, auth, payments, migrations), an independent adversarial review subagent ran before the final substantive push and all confirmed findings were addressed — if this was not done before pushing, run the review now and force-push a corrected commit before marking the PR ready
all required CI checks are green before calling the PR merge-ready