Skip to main content

rail-safety-management-system

Build a ROGS goal-based rail Safety Management System (SMS) to the ROGS/ORR element set (policy, accountabilities, risk-control arrangements, CSM-RA change interface, competence/Sentinel, asset/ECM maintenance, emergency, monitoring/audit, continuous improvement) for a named transport operator or infrastructure manager. Use this skill to build or review a rail SMS or structure a ROGS safety-certificate / safety-authorisation submission. Grounds elements in KB-REG-ROGS and the change interface in KB-REG-CSM-RA, resolves the route first (mainline operator -> safety certificate; infrastructure manager -> safety authorisation; non-mainline -> Part 3 verification), names the accountable duty-holder and safety-critical roles, ranks every mitigation through the hierarchy of controls, and de-identifies role-holder names / COSS / Sentinel numbers to role labels. The SMS is for-acceptance: it never claims it is 'accepted by ORR'. Decision-support only; a competent rail-SMS / ORR-aware person must review the output.

الانتقال إلى التثبيت

معلومات المصدر

المستودع
ashley-eyekyam/hse-leadership-skills
آخر نشاط في المصدر
٧ يوليو ٢٠٢٦ في ٠٥:٢١
لغة SKILL.md المكتشفة
الإنجليزية
النجوم
١
التفرعات
٠

خيارات التثبيت

يُحدَّد Prompt الذي يراجع المصدر أولًا بشكل افتراضي. يمكنك التبديل إلى أمر مباشر أو تنزيل نسخة محلية.

مراجعة ملفات المصدر

اقرأ SKILL.md وأي ملفات مرافقة يعرضها SkillsMP قبل أن تقرر التثبيت.