Skip to main content

rail-safety-management-system

Build a ROGS goal-based rail Safety Management System (SMS) to the ROGS/ORR element set (policy, accountabilities, risk-control arrangements, CSM-RA change interface, competence/Sentinel, asset/ECM maintenance, emergency, monitoring/audit, continuous improvement) for a named transport operator or infrastructure manager. Use this skill to build or review a rail SMS or structure a ROGS safety-certificate / safety-authorisation submission. Grounds elements in KB-REG-ROGS and the change interface in KB-REG-CSM-RA, resolves the route first (mainline operator -> safety certificate; infrastructure manager -> safety authorisation; non-mainline -> Part 3 verification), names the accountable duty-holder and safety-critical roles, ranks every mitigation through the hierarchy of controls, and de-identifies role-holder names / COSS / Sentinel numbers to role labels. The SMS is for-acceptance: it never claims it is 'accepted by ORR'. Decision-support only; a competent rail-SMS / ORR-aware person must review the output.

Ir a la instalación

Datos de origen

Repositorio
ashley-eyekyam/hse-leadership-skills
Última actividad en el origen
7 de julio de 2026 a las 05:21
Idioma detectado de SKILL.md
inglés
Estrellas
1
Forks
0

Opciones de instalación

De forma predeterminada está seleccionado el prompt que primero revisa el origen. Puedes cambiar a un comando directo o descargar una copia local.

Revisa los archivos de origen

Lee SKILL.md y los archivos complementarios que muestra SkillsMP antes de decidir si quieres instalarlo.