| name | rtl-p5-verify |
| description | Phase 5 legacy bundled verification: functional + silicon checks in one flow. Triggers 'verify', 'Phase 5', 'run all checks'. New flows: prefer split P5A/P5B. |
| user-invocable | true |
| argument-hint | [--module=name | --stage=N | --resume] |
| allowed-tools | Bash, Read, Write, Edit, Task, Grep, Glob |
Execute Phase 5 verification pipeline. Runs three-stage verification
(module → top → final) covering 9 verification categories with module
graduation gates and compliance review.
This is a legacy bundled bridge while teams transition to split P5A/P5B.
<Use_When>
- Phase 4 RTL implementation is complete with lint passing
- User says "verify", "verification", "Phase 5", "run all checks"
- Need comprehensive verification: lint, formal, CDC, functional, coverage, synthesis
- Need one legacy-style Phase-5 command that bundles functional + silicon-oriented checks
- Need migration bridge while adopting split flows (
rtl-p5a-functional-closure + rtl-p5b-silicon-validation)
- Team workflow intentionally keeps the combined legacy Phase-5 interface
</Use_When>
<Do_Not_Use_When>
- RTL modules don't exist yet (run
rtl-p4-rapid-impl or rtl-p4-implement first)
- Only need functional regression (use rtl-p5s-func-verify)
- Only need a specific verification category (use the category-specific skill)
- Want strict separation of functional closure and silicon validation
(use
rtl-p5a-functional-closure first, then rtl-p5b-silicon-validation)
- Starting a new verification flow with explicit two-stage closure
(default to split
rtl-p5a-functional-closure + rtl-p5b-silicon-validation)
</Do_Not_Use_When>
Prerequisites
Phase 4 completion required:
rtl/**/*.sv files must exist
- One of the following completion proofs must exist:
reviews/phase-4-rtl/lint-report.md (full rtl-p4-implement path)
.rat/state/p4-state.json with gates.p4_exit.verdict = pass (rapid rtl-p4-rapid-impl path)
If prerequisites are missing: WARNING — recommend running /rtl-agent-team:rtl-p4-rapid-impl
or /rtl-agent-team:rtl-p4-implement. Proceed with available artifacts — orchestrator will adapt scope.
Execution
Task(subagent_type="rtl-agent-team:p5-verify-orchestrator",
prompt="Execute Phase 5 verification. User input: $ARGUMENTS")
Do not perform any work directly.
The orchestrator agent manages all stages, module graduation,
parallel agent spawning, and compliance review.
Compliance Notes
- Verification must confirm all iron requirement
acceptance_criteria are met.
When structured acceptance_criteria (with ac_id) exist from P3, verification
tracks compliance at the individual criterion level (ac_id granularity).
When acceptance_criteria is in string-array format (P1/P2), verification
operates at REQ level.
- Final compliance check compares test results against P1+P2+P3
acceptance_criteria
- Phase 5 PASS requires zero unmet iron requirements across all verification categories
Output
reviews/phase-5-verify/ — 9 category verification reports (lint, formal, CDC, protocol, functional, coverage, performance, synthesis, code review)
reviews/phase-5-verify/final-compliance.md — overall PASS/FAIL verdict with requirement traceability