Skip to main content

division-07-thermal-moisture-protection-bid-scope

Whole-division starter rules for CSI Division 07 - Thermal and Moisture Protection. Use when starting, triaging, validating, or packaging a commercial roofing, waterproofing, insulation, firestopping, or sealants bid.

Jump to install

Source facts

Repository
ContractorKeith/contractor-bid
Last source activity
July 1, 2026 at 22:41
Detected SKILL.md language
English
Stars
5
Forks
1

Install options

The review-first prompt is selected by default. You can switch to a direct command or download a local copy.

Review the source files

Read SKILL.md and any companion files shown by SkillsMP before deciding whether to install.

Showing SKILL.md

SKILL.md
Source instructions · Read-only preview
name
division-07-thermal-moisture-protection-bid-scope
description
Whole-division starter rules for CSI Division 07 - Thermal and Moisture Protection. Use when starting, triaging, validating, or packaging a commercial roofing, waterproofing, insulation, firestopping, or sealants bid.
# Division 07 - Thermal and Moisture Protection Bid Scope Company: Your Company CSI division(s): 07 Spec section hints: 07 00 00, 07 10 00, 07 21 00, 07 24 00, 07 27 00, 07 50 00, 07 60 00, 07 84 00, 07 90 00 ## Scope Rule Base bid is limited to CSI Division 07 - Thermal and Moisture Protection work specifically assigned to the bidder: waterproofing, insulation, air barriers, roofing, flashing, sheet metal, firestopping, joint protection, and sealants. Structural deck, framing, roof drains, interior finishes, and MEP penetrations must be explicitly included, excluded, or flagged before pricing. ## Base Scope - below-grade waterproofing when assigned - thermal insulation - air and vapor barriers - roofing assemblies - flashing and sheet metal - firestopping - joint sealants and expansion joints ## Terms That Usually Identify This Scope - roofing - waterproofing - insulation - air barrier - vapor barrier - flashing - sheet metal - firestopping - sealant - 07 00 ## Adjacent Scope To Exclude By Default - structural deck - roof drain plumbing - metal framing - interior painting ## Adjacent Scope To Flag Before Pricing - wood blocking - roof drain - curb - penetration - warranty ## Bid Package Workflow 1. Put source PDFs, spreadsheets, and addenda in `bid-docs/`. 2. Run `contractor-bid triage <project> --profile division-07-thermal-moisture-protection`. 3. Review `bid-package-working/takeoff/candidate-pages.md` (candidate pages plus scope signals). 4. Fill `takeoff/scope-pages-sources.json`, then run `contractor-bid build-packets <project>`. 5. Fill the takeoff JSON, then run `contractor-bid build-workbook <project>`. 6. Run `contractor-bid check <project> --profile division-07-thermal-moisture-protection` before sending anything out. 7. Record user corrections with `contractor-bid learn` and update this skill/profile when the correction should become a durable rule. ## Guardrail Do not silently price excluded or flagged adjacent scopes. Carry the scope boundary through the summary, workbook, proposal letter, alerts, and sendoff package.
View on GitHub