| name | division-07-thermal-moisture-protection-bid-scope |
| description | Whole-division starter rules for CSI Division 07 - Thermal and Moisture Protection. Use when starting, triaging, validating, or packaging a commercial roofing, waterproofing, insulation, firestopping, or sealants bid. |
Division 07 - Thermal and Moisture Protection Bid Scope
Company: Your Company
CSI division(s): 07
Spec section hints: 07 00 00, 07 10 00, 07 21 00, 07 24 00, 07 27 00, 07 50 00, 07 60 00, 07 84 00, 07 90 00
Scope Rule
Base bid is limited to CSI Division 07 - Thermal and Moisture Protection work specifically assigned to the bidder: waterproofing, insulation, air barriers, roofing, flashing, sheet metal, firestopping, joint protection, and sealants. Structural deck, framing, roof drains, interior finishes, and MEP penetrations must be explicitly included, excluded, or flagged before pricing.
Base Scope
- below-grade waterproofing when assigned
- thermal insulation
- air and vapor barriers
- roofing assemblies
- flashing and sheet metal
- firestopping
- joint sealants and expansion joints
Terms That Usually Identify This Scope
- roofing
- waterproofing
- insulation
- air barrier
- vapor barrier
- flashing
- sheet metal
- firestopping
- sealant
- 07 00
Adjacent Scope To Exclude By Default
- structural deck
- roof drain plumbing
- metal framing
- interior painting
Adjacent Scope To Flag Before Pricing
- wood blocking
- roof drain
- curb
- penetration
- warranty
Bid Package Workflow
- Put source PDFs, spreadsheets, and addenda in
bid-docs/.
- Run
contractor-bid triage <project> --profile division-07-thermal-moisture-protection.
- Review
bid-package-working/takeoff/candidate-pages.md (candidate pages plus scope signals).
- Fill
takeoff/scope-pages-sources.json, then run contractor-bid build-packets <project>.
- Fill the takeoff JSON, then run
contractor-bid build-workbook <project>.
- Run
contractor-bid check <project> --profile division-07-thermal-moisture-protection before sending anything out.
- Record user corrections with
contractor-bid learn and update this skill/profile when the correction should become a durable rule.
Guardrail
Do not silently price excluded or flagged adjacent scopes. Carry the scope boundary through the summary, workbook, proposal letter, alerts, and sendoff package.