Skip to main content

division-11-equipment-bid-scope

Whole-division starter rules for CSI Division 11 - Equipment. Use when starting, triaging, validating, or packaging a commercial equipment bid.

Source facts

Repository
ContractorKeith/contractor-bid
Last source activity
July 1, 2026 at 22:41
Detected SKILL.md language
English
Stars
5
Forks
1

Install options

The review-first prompt is selected by default. You can switch to a direct command or download a local copy.

Review the source files

Read SKILL.md and any companion files shown by SkillsMP before deciding whether to install.

Showing SKILL.md

SKILL.md
Source instructions · Read-only preview
name
division-11-equipment-bid-scope
description
Whole-division starter rules for CSI Division 11 - Equipment. Use when starting, triaging, validating, or packaging a commercial equipment bid.
# Division 11 - Equipment Bid Scope Company: Your Company CSI division(s): 11 Spec section hints: 11 00 00, 11 10 00, 11 30 00, 11 40 00, 11 52 00, 11 53 00, 11 70 00 ## Scope Rule Base bid is limited to CSI Division 11 - Equipment work specifically assigned to the bidder: commercial, foodservice, loading dock, laboratory, athletic, and other facility equipment. Utility rough-ins, structural supports, controls, owner-furnished equipment, and commissioning must be explicitly included, excluded, or flagged before pricing. ## Base Scope - commercial equipment when assigned - foodservice equipment when assigned - loading dock equipment when assigned - laboratory equipment when assigned - athletic and recreational equipment when assigned - equipment anchorage when assigned - startup assistance when assigned ## Terms That Usually Identify This Scope - equipment - foodservice - appliance - dock leveler - laboratory equipment - athletic equipment - washer - dryer - 11 00 ## Adjacent Scope To Exclude By Default - electrical wiring - plumbing piping - gas piping - structural steel ## Adjacent Scope To Flag Before Pricing - owner furnished - rough-in - startup - warranty - anchorage ## Bid Package Workflow 1. Put source PDFs, spreadsheets, and addenda in `bid-docs/`. 2. Run `contractor-bid triage <project> --profile division-11-equipment`. 3. Review `bid-package-working/takeoff/candidate-pages.md` (candidate pages plus scope signals). 4. Fill `takeoff/scope-pages-sources.json`, then run `contractor-bid build-packets <project>`. 5. Fill the takeoff JSON, then run `contractor-bid build-workbook <project>`. 6. Run `contractor-bid check <project> --profile division-11-equipment` before sending anything out. 7. Record user corrections with `contractor-bid learn` and update this skill/profile when the correction should become a durable rule. ## Guardrail Do not silently price excluded or flagged adjacent scopes. Carry the scope boundary through the summary, workbook, proposal letter, alerts, and sendoff package.
View on GitHub