| name | division-22-plumbing-bid-scope |
| description | Whole-division starter rules for CSI Division 22 - Plumbing. Use when starting, triaging, validating, or packaging a commercial plumbing bid. |
Division 22 - Plumbing Bid Scope
Company: Your Company
CSI division(s): 22
Spec section hints: 22 00 00, 22 05 00, 22 07 00, 22 11 00, 22 13 00, 22 14 00, 22 40 00
Scope Rule
Base bid is limited to CSI Division 22 - Plumbing work specifically assigned to the bidder: domestic water, sanitary waste and vent, storm drainage, fixtures, equipment, insulation, and plumbing specialties. Site utilities, fire suppression, HVAC piping, electrical power, controls, and owner-furnished equipment must be explicitly included, excluded, or flagged before pricing.
Base Scope
- domestic water piping
- sanitary waste and vent piping
- storm drainage piping when assigned
- plumbing fixtures and trim
- water heaters and plumbing equipment
- plumbing insulation when assigned
- floor drains, cleanouts, and specialties
Terms That Usually Identify This Scope
- plumbing
- domestic water
- sanitary
- waste and vent
- fixture
- water heater
- floor drain
- cleanout
- 22 00
Adjacent Scope To Exclude By Default
- fire sprinkler
- HVAC piping
- electrical wiring
- site water utility
Adjacent Scope To Flag Before Pricing
- site utility
- gas piping
- grease interceptor
- storm drainage
- fixture by owner
Bid Package Workflow
- Put source PDFs, spreadsheets, and addenda in
bid-docs/.
- Run
contractor-bid triage <project> --profile division-22-plumbing.
- Review
bid-package-working/takeoff/candidate-pages.md (candidate pages plus scope signals).
- Fill
takeoff/scope-pages-sources.json, then run contractor-bid build-packets <project>.
- Fill the takeoff JSON, then run
contractor-bid build-workbook <project>.
- Run
contractor-bid check <project> --profile division-22-plumbing before sending anything out.
- Record user corrections with
contractor-bid learn and update this skill/profile when the correction should become a durable rule.
Guardrail
Do not silently price excluded or flagged adjacent scopes. Carry the scope boundary through the summary, workbook, proposal letter, alerts, and sendoff package.