Skip to main content

roofing-bid-scope

Bid-project scope rules for roofing. Use when starting, triaging, validating, or packaging a commercial roofing bid.

Jump to install

Source facts

Repository
ContractorKeith/contractor-bid
Last source activity
July 1, 2026 at 22:41
Detected SKILL.md language
English
Stars
5
Forks
1

Install options

The review-first prompt is selected by default. You can switch to a direct command or download a local copy.

Review the source files

Read SKILL.md and any companion files shown by SkillsMP before deciding whether to install.

Showing SKILL.md

SKILL.md
Source instructions · Read-only preview
name
roofing-bid-scope
description
Bid-project scope rules for roofing. Use when starting, triaging, validating, or packaging a commercial roofing bid.
# Roofing Bid Scope Company: Your Company CSI division(s): 07 Spec section hints: 07 22 00, 07 54 00, 07 52 00, 07 62 00 ## Scope Rule Base bid is limited to roofing systems defined by the profile: membrane or steep-slope roofing, roof insulation, cover board, flashing, and roof-related sheet metal. Wood blocking and nailers, structural decking, roof drains, and below-grade waterproofing must be explicitly included, excluded, or flagged before pricing. ## Base Scope - membrane roofing - roof insulation - cover board - base and counter flashing - coping and edge metal - roof curb flashing - pipe boots - walkway pads ## Terms That Usually Identify This Scope - roofing - membrane - TPO - EPDM - modified bitumen - roof insulation - flashing - coping - 07 22 - 07 54 ## Adjacent Scope To Exclude By Default - structural deck - metal deck - below grade waterproofing - firestopping - gutters and downspouts ## Adjacent Scope To Flag Before Pricing - wood blocking - nailer - roof drain - overflow - skylight - expansion joint - lightning protection - fall protection ## Bid Package Workflow 1. Put source PDFs, spreadsheets, and addenda in `bid-docs/`. 2. Run `contractor-bid triage <project> --profile roofing`. 3. Review `bid-package-working/takeoff/candidate-pages.md` (candidate pages plus scope signals). 4. Fill `takeoff/scope-pages-sources.json`, then run `contractor-bid build-packets <project>`. 5. Fill the takeoff JSON, then run `contractor-bid build-workbook <project>`. 6. Run `contractor-bid check <project> --profile roofing` before sending anything out. 7. Record user corrections with `contractor-bid learn` and update this skill/profile when the correction should become a durable rule. ## Guardrail Do not silently price excluded or flagged adjacent scopes. Carry the scope boundary through the summary, workbook, proposal letter, alerts, and sendoff package.
View on GitHub