ワンクリックで
roofing-bid-scope
Bid-project scope rules for roofing. Use when starting, triaging, validating, or packaging a commercial roofing bid.
Codex または Claude でインストール この Prompt をコピーして Codex、Claude、または他のアシスタントに貼り付けると、Skill ページを確認してインストールできます。
メニュー
Bid-project scope rules for roofing. Use when starting, triaging, validating, or packaging a commercial roofing bid.
Codex または Claude でインストール この Prompt をコピーして Codex、Claude、または他のアシスタントに貼り付けると、Skill ページを確認してインストールできます。
SOC 職業分類に基づく
Bid-project scope rules for concrete flatwork. Use when starting, triaging, validating, or packaging a commercial concrete flatwork bid.
Whole-division starter rules for CSI Division 03 - Concrete. Use when starting, triaging, validating, or packaging a commercial concrete bid.
Whole-division starter rules for CSI Division 04 - Masonry. Use when starting, triaging, validating, or packaging a commercial masonry bid.
Whole-division starter rules for CSI Division 05 - Metals. Use when starting, triaging, validating, or packaging a commercial metals bid.
Whole-division starter rules for CSI Division 06 - Wood, Plastics, and Composites. Use when starting, triaging, validating, or packaging a commercial carpentry or millwork bid.
Whole-division starter rules for CSI Division 07 - Thermal and Moisture Protection. Use when starting, triaging, validating, or packaging a commercial roofing, waterproofing, insulation, firestopping, or sealants bid.
| name | roofing-bid-scope |
| description | Bid-project scope rules for roofing. Use when starting, triaging, validating, or packaging a commercial roofing bid. |
Company: Your Company CSI division(s): 07 Spec section hints: 07 22 00, 07 54 00, 07 52 00, 07 62 00
Base bid is limited to roofing systems defined by the profile: membrane or steep-slope roofing, roof insulation, cover board, flashing, and roof-related sheet metal. Wood blocking and nailers, structural decking, roof drains, and below-grade waterproofing must be explicitly included, excluded, or flagged before pricing.
bid-docs/.contractor-bid triage <project> --profile roofing.bid-package-working/takeoff/candidate-pages.md (candidate pages plus scope signals).takeoff/scope-pages-sources.json, then run contractor-bid build-packets <project>.contractor-bid build-workbook <project>.contractor-bid check <project> --profile roofing before sending anything out.contractor-bid learn and update this skill/profile when the correction should become a durable rule.Do not silently price excluded or flagged adjacent scopes. Carry the scope boundary through the summary, workbook, proposal letter, alerts, and sendoff package.