Orchestrate onshore and offshore physical plant-layout screening from explicit equipment envelopes and NeqSim process data to checked alternatives, drawings, CAD and a report. USE WHEN: plot plans, topsides/deck arrangements, plant layouts or a layout study report are requested.

Source facts

Repository
equinor/neqsim
Last source activity
October 30, 2026 at 17:47
Detected SKILL.md language
English
Stars
161
Forks
77

Install options

The review-first prompt is selected by default. You can switch to a direct command or download a local copy.

Review the source files

Read SKILL.md and any companion files shown by SkillsMP before deciding whether to install.

Showing SKILL.md

SKILL.md
Source instructions · Read-only preview
name
neqsim-plant-layout-study
version
1.0.0
description
Orchestrate onshore and offshore physical plant-layout screening from explicit equipment envelopes and NeqSim process data to checked alternatives, drawings, CAD and a report. USE WHEN: plot plans, topsides/deck arrangements, plant layouts or a layout study report are requested.
last_verified
2026-10-25
# Plant layout study Use `neqsim layout-study` through `@plant-layout-study`. Companions are `neqsim-plant-layout-geometry` and `neqsim-plant-layout-delivery`. Read [the implementation guide](../../../docs/development/PLANT_LAYOUT_STUDY.md). The workflow owns physical layout; process simulation stays with existing process agents and the process-report dataset. ## Scope and inputs Create or resume the task folder. Read the decision, jurisdiction, facility type, maturity, coordinate frame/datum, plot/decks, equipment schedule, topology, existing geometry, vendor/sizing evidence, maintenance/materials handling, escape reservations, standards register and acceptance criteria. Ask only for missing information that changes the result. Keep unanswered items in `data_gaps`; assumptions are explicit and traceable. The `plant_layout_study.v1` model uses metres and kilograms. Equipment requires dimensions and their source, allowed decks, orientations, optional locked positions and separate envelopes. Process import preserves stream identities and connectivity; it never invents package dimensions or interprets a schematic symbol as a scaled footprint. Reuse `ProcessDiagramGraphAdapter` and `EngineeringGraph` for semantic identities where available, and numeric `SystemMechanicalDesign` / `MechanicalDesign` summaries for explicitly preliminary dimensions. Check `SystemMechanicalDesignResult` completeness and per-equipment outcomes before accepting calculated geometry. ## Execute - Initialize a task-local specification with `neqsim layout-study --init DIR`. - Generate and inspect synthetic examples using `--demo onshore` or `--demo offshore`, with explicit `--out DIR`. - Run the specification with `neqsim layout-study study.yaml --out DIR`; use `--strict` when complete required evidence is an acceptance gate. Read command help for supported stages and process-data input. - Preserve dataset fingerprints and source snapshots. A stale stage cache must be regenerated before use. - Reconcile process tags, coordinates and connection metrics. A centre-to-centre length proxy is not installed piping MTO. - Review checks, CAD adapter availability/losses, drawings and report before handoff to `@plant-layout-review`. ## Standards and maturity **Flow-diagram gate:** accompanying flow/connection diagrams pass `neqsim pfd-check` (skill `neqsim-pfd-layout-review`) before use; plot/deck drawings follow the geometry and delivery checks. Establish applicability and the adopted edition. Candidate sources include Havtil regulations where in scope; NORSOK S-001, S-002, L-002, P-002 and relevant C/R standards; ISO 13702/17776 for applicable offshore installations; IEC 60079-10-1 for its hazardous-area scope; API RP 752/753/756 for applicable onshore buildings/tents. Add LNG, storage, flare, electrical, structural and marine/class sources where relevant. Use `neqsim-standards-lookup` and inspected authorized text. Public metadata cannot establish a spacing requirement. Mandatory law prevails over project decisions; no project deviation can waive statutory obligations. Software checks return PASS, FAIL, NOT_EVALUATED or NOT_APPLICABLE with evidence. An alternative is INFEASIBLE on required failure and INCOMPLETE on missing required evidence. FEASIBLE means feasible against the supplied modeled criteria only; it is not design approval or a statement of full standard compliance. Demonstrations remain SCREENING and synthetic. ## Handoffs and failure behavior Invalid geometry/units/tags stop input processing. Failed geometric alternatives stay visible. Missing required hazard, structural, vendor or marine evidence remains unassessed; do not relabel it PASS to make strict mode succeed. Use process/mechanical/safety/standards specialists and optional community/enterprise overlays through current catalogs. Do not commit project reports, plant data or licensed standards to public repositories.