Skip to main content

neqsim-plant-layout-study

Orchestrate onshore and offshore physical plant-layout screening from explicit equipment envelopes and NeqSim process data to checked alternatives, drawings, CAD and a report. USE WHEN: plot plans, topsides/deck arrangements, plant layouts or a layout study report are requested.

Informations de source

Dépôt
equinor/neqsim
Dernière activité de la source
30 octobre 2026 à 17:47
Langue détectée de SKILL.md
anglais
Étoiles
161
Forks
77

Options d'installation

Le prompt qui vérifie d'abord la source est sélectionné par défaut. Vous pouvez passer à une commande directe ou télécharger une copie locale.

Vérifiez les fichiers source

Lisez SKILL.md et les fichiers associés affichés par SkillsMP avant de décider de l'installer.

Affichage de SKILL.md

SKILL.md
Instructions source · Aperçu en lecture seule
name
neqsim-plant-layout-study
version
1.0.0
description
Orchestrate onshore and offshore physical plant-layout screening from explicit equipment envelopes and NeqSim process data to checked alternatives, drawings, CAD and a report. USE WHEN: plot plans, topsides/deck arrangements, plant layouts or a layout study report are requested.
last_verified
2026-10-25
# Plant layout study Use `neqsim layout-study` through `@plant-layout-study`. Companions are `neqsim-plant-layout-geometry` and `neqsim-plant-layout-delivery`. Read [the implementation guide](../../../docs/development/PLANT_LAYOUT_STUDY.md). The workflow owns physical layout; process simulation stays with existing process agents and the process-report dataset. ## Scope and inputs Create or resume the task folder. Read the decision, jurisdiction, facility type, maturity, coordinate frame/datum, plot/decks, equipment schedule, topology, existing geometry, vendor/sizing evidence, maintenance/materials handling, escape reservations, standards register and acceptance criteria. Ask only for missing information that changes the result. Keep unanswered items in `data_gaps`; assumptions are explicit and traceable. The `plant_layout_study.v1` model uses metres and kilograms. Equipment requires dimensions and their source, allowed decks, orientations, optional locked positions and separate envelopes. Process import preserves stream identities and connectivity; it never invents package dimensions or interprets a schematic symbol as a scaled footprint. Reuse `ProcessDiagramGraphAdapter` and `EngineeringGraph` for semantic identities where available, and numeric `SystemMechanicalDesign` / `MechanicalDesign` summaries for explicitly preliminary dimensions. Check `SystemMechanicalDesignResult` completeness and per-equipment outcomes before accepting calculated geometry. ## Execute - Initialize a task-local specification with `neqsim layout-study --init DIR`. - Generate and inspect synthetic examples using `--demo onshore` or `--demo offshore`, with explicit `--out DIR`. - Run the specification with `neqsim layout-study study.yaml --out DIR`; use `--strict` when complete required evidence is an acceptance gate. Read command help for supported stages and process-data input. - Preserve dataset fingerprints and source snapshots. A stale stage cache must be regenerated before use. - Reconcile process tags, coordinates and connection metrics. A centre-to-centre length proxy is not installed piping MTO. - Review checks, CAD adapter availability/losses, drawings and report before handoff to `@plant-layout-review`. ## Standards and maturity **Flow-diagram gate:** accompanying flow/connection diagrams pass `neqsim pfd-check` (skill `neqsim-pfd-layout-review`) before use; plot/deck drawings follow the geometry and delivery checks. Establish applicability and the adopted edition. Candidate sources include Havtil regulations where in scope; NORSOK S-001, S-002, L-002, P-002 and relevant C/R standards; ISO 13702/17776 for applicable offshore installations; IEC 60079-10-1 for its hazardous-area scope; API RP 752/753/756 for applicable onshore buildings/tents. Add LNG, storage, flare, electrical, structural and marine/class sources where relevant. Use `neqsim-standards-lookup` and inspected authorized text. Public metadata cannot establish a spacing requirement. Mandatory law prevails over project decisions; no project deviation can waive statutory obligations. Software checks return PASS, FAIL, NOT_EVALUATED or NOT_APPLICABLE with evidence. An alternative is INFEASIBLE on required failure and INCOMPLETE on missing required evidence. FEASIBLE means feasible against the supplied modeled criteria only; it is not design approval or a statement of full standard compliance. Demonstrations remain SCREENING and synthetic. ## Handoffs and failure behavior Invalid geometry/units/tags stop input processing. Failed geometric alternatives stay visible. Missing required hazard, structural, vendor or marine evidence remains unassessed; do not relabel it PASS to make strict mode succeed. Use process/mechanical/safety/standards specialists and optional community/enterprise overlays through current catalogs. Do not commit project reports, plant data or licensed standards to public repositories.
Voir sur GitHub