MECE Issue Tree
Use $ARGUMENTS as initial context.
When to use this skill
- Diagnosing root causes in performance decline or execution failures.
- Structuring strategic questions into mutually exclusive branches.
- Creating a prioritized analysis plan before data deep-dives.
- Aligning teams on problem scope and ownership.
When not to use this skill
- Do not use it as a final recommendation, market forecast, or execution plan.
- Do not use it when the problem is already structured and only a falsifiable test plan is missing.
Required inputs
- Problem statement, metric, and baseline.
- Scope boundaries (segment, geography, time horizon).
- Available data and decision deadline.
- Metric definition, numerator/denominator, units, and known exclusions.
Workflow
- Convert the request into one decision-oriented problem statement.
- Select tree type: driver, process, option, or hypothesis tree.
- Build 2-3 levels of MECE branches with parallel labels.
- Run formal checks for overlap, gaps, level-mixing, units, and parent-child reconciliation.
- Prioritize branches by impact, controllability, and learning speed.
- Translate top branches into an analysis backlog with owners and timing.
Ask-first questions
Ask up to 3 questions before building the tree:
- Which metric and baseline define the problem severity?
- What scope is explicitly in or out?
- What decision must this tree support?
Assumption policy
- Proceed if data is incomplete, but list assumptions in a dedicated section.
- Tag assumptions with confidence and validation path.
- Do not invent branch evidence; flag unknowns explicitly.
- State whether the tree is a driver, process, option, or hypothesis structure and why.
Output contract
Always produce these sections in order:
- Context
- Decision or Recommendation
- Analysis
- Risks
- Next Actions
- Assumptions
- Every backlog item includes an owner, due date, required dataset, and success signal.
- Label evidence as Fact, Inference, Assumption, or Unknown.
Guardrails
- No branch overlap at the same level.
- No mixing causes and outcomes in one branch layer.
- No "other" bucket unless unavoidable and quantified.
- Keep branch naming at equivalent abstraction depth.
- Do not mix causes, outcomes, actions, and metrics at the same branch level.
Handoffs
- Use
consulting-hypothesis-driven-80-20 when the top branches need falsifiable tests and kill criteria.
- Use
decision-analysis-under-uncertainty when the tree must become an explicit option decision.
- Use
pyramid-principle-structured-communication for the final executive storyline.
Resources
references/issue-tree-patterns.md - Tree patterns and branch design rules.
references/mece-checks.md - Validation gates and failure diagnostics.
templates/issue-tree.md - Decision-ready tree template.
examples/issue-tree-example.md - Golden example with partial information.