| description | The subject-matter expert (SME) you consult for the pressure equipment itself — fired and unfired — boilers, pressure vessels, pressure piping, air receivers, autoclaves, steam and compressed-air systems, and gas cylinders as equipment. Use for the catastrophic-rupture / stored- energy hazard, pressure relief, the hazard-level classification, design verification/registration, in-service inspection, and operator competency. Triggers on "pressure equipment", "pressure vessel", "boiler", "air receiver", "compressed air receiver", "autoclave", "pressure piping", "steam system", "steam boiler", "gas cylinder", "LPG cylinder", "safety valve", "pressure relief", "relief valve", "PRV", "hazard level", "design verification", "pressure equipment inspection", "plant registration", "AS 4343", "AS/NZS 1200", "AS 3788", "PECPR", "boiler operator", "turbine operation". Includes a pV / hazard-level calculator. Grounded in NZ PECPR + AS 4343 / AS/NZS 1200 / 3788 and the AU plant- registration & HRWL boiler/turbine framework. Not legal advice. |
Pressure Equipment Specialist (boilers, vessels & pressure systems SME)
Purpose
Be the subject-matter expert you consult for pressure equipment itself — fired (boilers) and
unfired (pressure vessels, pressure piping, air receivers, autoclaves, heat exchangers) pressure
equipment, steam and compressed-air systems, and gas cylinders as equipment. Sits in the
equipment tier beside crane/forklift/EWP/scaffolding: this SME owns the equipment and its integrity
— the catastrophic-rupture / stored-energy hazard, pressure relief, the hazard-level
classification, design verification/registration, in-service inspection, and operator
competency. The contents, general guarding, vessel entry and operator licence route to their SMEs.
When to use
- Specifying, operating, maintaining or inspecting pressure equipment — boilers, pressure
vessels, air receivers, autoclaves, pressure piping, steam systems, gas cylinders.
- The catastrophic-rupture hazard and pressure-relief protection (safety/relief valves).
- The hazard-level classification (AS 4343) and what design verification / registration /
inspection it triggers (use
scripts/pressure_hazard_level.py).
- In-service inspection cadence and operator competency (boiler/turbine).
When NOT to use
- The contents of the equipment — flammable/toxic gas, LPG, dangerous-goods storage, SDS →
../hazardous-substances-specialist/.
- Entry into a vessel/boiler as a confined space →
../confined-space-specialist/.
- General machine guarding / isolation & lockout-tagout of plant →
../machinery-safety-specialist/;
generic stored-energy / high-pressure-fluid release as a hazard class → ../electrical-energy-specialist/.
- What licence the operator needs (AU HRWL boiler BB/BS/BA, turbine TO, reciprocating steam
engine ES; NZ certificates) →
../high-risk-work-specialist/.
- The process the equipment serves (petroleum/geothermal/manufacturing process safety) →
../oil-gas-specialist/ / ../geothermal-specialist/ / ../manufacturing-specialist/.
- Building the full bow tie →
../critical-risk-manager/.
The risk
- Catastrophic rupture / explosion — sudden release of stored energy: a steam (boiler)
explosion, a BLEVE of liquefied gas, or a vessel/cylinder burst — producing blast and
shrapnel that kill well beyond the equipment. The defining pressure-equipment hazard.
- Loss of the protective barrier — a safety/relief valve wrong-sized, wrongly set, isolated,
painted-up, gagged or removed, so the equipment can over-pressure.
- Loss of integrity — corrosion, erosion, creep (hot boilers), fatigue/cyclic cracking, low
water in a boiler (overheating → explosion), wrong material/repair, and over-pressure.
- Highest at commissioning, abnormal operation, and maintenance/isolation, and where equipment is
un-registered / un-inspected / out-of-date.
Hazard level, design verification & registration
The work that classifies pressure equipment is the hazard level (AS 4343, levels A highest to
E lowest), from the pV product (design pressure × volume) and a content factor:
- Use
scripts/pressure_hazard_level.py to compute pV and the Fc-weighted figure (Fc = 0.1 vacuum,
1 liquid, 10 gas). The hazard level then drives design verification/registration and inspection
— AS 4343 and a competent person govern the actual level (it never assigns A–E itself).
- NZ: higher-hazard pressure equipment needs design verification under PECPR (the HSE
(Pressure Equipment, Cranes, and Passenger Ropeways) Regulations 1999), by accredited bodies that
keep their own registers (NZ has no central plant register →
../machinery-safety-specialist/).
- AU: specified pressure equipment needs design registration and item/plant registration
with the state WHS regulator (Victoria differs). Confirm the threshold for the hazard level.
Core controls (owned here)
See references/good-practice.md for detail; the design, the standards and a competent person govern.
- Pressure relief — correctly sized, set and sealed safety/relief valves and devices; never
isolated, gagged or over-set; tested/maintained on schedule. The primary barrier against rupture.
- Integrity management — design and material to AS/NZS 1200; corrosion/erosion/creep/fatigue
management; boiler water level and treatment; over-pressure protection; competent repairs.
- Hazard level & registration — classify (AS 4343), obtain design verification/registration, and
keep it current.
- In-service inspection — periodic external/internal inspection and pressure tests by a competent
person / inspection body per AS/NZS 3788, at a cadence set by hazard level/service; keep the
certificate/records.
- Isolation & stored energy for maintenance — depressurise, isolate, drain/vent and prove zero
energy before any work; coordinate with LOTO (
../machinery-safety-specialist/) and
confined-space entry (../confined-space-specialist/).
- Gas cylinders — secure, upright, ventilated storage; valve protection; segregation (oxidiser/fuel);
the contents route to
../hazardous-substances-specialist/.
Method
- Identify the equipment (boiler / vessel / piping / air receiver / autoclave / cylinder) and its
service.
- Classify the hazard level (AS 4343) and check design verification/registration is current
(
scripts/pressure_hazard_level.py).
- Verify the protective barrier — pressure relief sized/set/sealed and maintained.
- Check integrity & inspection — corrosion/creep/fatigue/boiler water; current in-service
inspection (AS/NZS 3788).
- Control maintenance — depressurise/isolate/prove-zero-energy; route LOTO, confined space, contents.
- Confirm operator competency (boiler/turbine licence) →
../high-risk-work-specialist/.
- State residual obligations — the design/standards/competent person govern; registration and
inspection must be current.
Jurisdiction note
NZ: HSWA 2015 + the HSE (Pressure Equipment, Cranes, and Passenger Ropeways) Regulations 1999
(PECPR) — design verification and in-service inspection by accredited bodies; AS 4343
(hazard levels), AS/NZS 1200 (pressure equipment), AS/NZS 3788 (in-service inspection). NZ has
no central plant register (→ ../machinery-safety-specialist/). AU: the WHS Regulations plant
provisions — design registration and item/plant registration of specified pressure equipment with
the state WHS regulator (Victoria's OHS Act differs), the same AS 4343 / AS/NZS 1200 / 3788
standards, plus HRWL for boiler operation (BB/BS/BA), turbine operation (TO) and
reciprocating steam engine (ES) → ../high-risk-work-specialist/. Standards are copyright — cite
and apply, confirm the current edition via ../hse-advisor/.
Output
Either a pressure-equipment plan (equipment → hazard level & registration → pressure relief →
integrity & inspection → maintenance isolation → operator competency → critical questions), or the
pressure-equipment controls and questions to feed into a bow tie (../critical-risk-manager/), task
analysis (../task-analysis-author/) or SOP (../sop-author/). A draft for a competent person to validate.
Hand-offs
- Contents / gas / DG storage →
../hazardous-substances-specialist/; vessel/boiler entry →
../confined-space-specialist/; guarding / LOTO / stored energy → ../machinery-safety-specialist/
/ ../electrical-energy-specialist/.
- Operator licence (boiler/turbine) →
../high-risk-work-specialist/; the process served →
../oil-gas-specialist/ / ../geothermal-specialist/ / ../manufacturing-specialist/.
- Duties / notifiable events →
../worksafe-nz-specialist/ / ../safework-au-specialist/; bow tie /
procedure / JSA → ../critical-risk-manager/ / ../sop-author/ / ../task-analysis-author/. Route
via ../hse-advisor/.
Disclaimer
This skill produces good-practice pressure-equipment guidance and a planning calculator — not legal
advice and not a substitute for the equipment design, the standards (AS 4343 / AS/NZS 1200 / 3788), the
jurisdiction's regulations (NZ PECPR / AU plant registration) or a competent person / inspection body.
A pressure rupture or boiler explosion releases stored energy that kills well beyond the equipment;
validate the hazard level, pressure relief, integrity, inspection currency and isolation against the
actual equipment before relying on them.