| description | Use when sizing or estimating a task, issue, or ticket, or when checking an estimate someone else set. Defines the T-shirt scale (XS, S, M, L, XL) and what the work at each size looks like, plus the rules for spikes, parent tracking issues, and splitting oversized work. Use even if the user only says 'how big is this', 'what should the estimate be', 'story points', or names a size. |
Sizing
One definition of the T-shirt scale. Size on what the work looks like, never on how long it might take.
The scale
| Size | Points | What it looks like |
|---|
| XS | 1 | Trivial and self-evident. A config change, a docs fix, a small bug fix, a single-file edit. No design decision. |
| S | 2 | One focused slice, fully bounded. A standalone bug fix or feature slice with its own tests. Stays inside one module. |
| M | 3 | The workhorse. Clear scope, one owner, several files in one subsystem, with tests and docs. |
| L | 5 | The largest single unit. A new component, or a cross-cutting interface change with a settled design. |
| XL | 8 | Personal projects only. Never on work: split into a parent plus children. |
Rules
- Index on what the work looks like, never on elapsed time. Do not estimate in days or weeks.
- Unresolved design is not a size, it is a spike. File the spike at XS or S, then size the real work once the design is settled.
- Parent tracking issues carry no estimate. The children carry the size.
- Work stops at L. Personal projects may use XL, but splitting is still the better move.
- Confirm the scale against the live workspace before assigning. The values above are what this workspace uses today, not a fixed truth.
Telling the workspaces apart
The WW team, Wimpy's World, is personal. The FUL team, Fulfillment Automation, is work.
Sprint loading
A human sanity check, not an agent input. A two-week sprint holds 8 XS, or 4 S, or 2 M, or 1 L.