| description | Produce release signoff checklists with test results summary, known issues, risk assessment, and go/no-go recommendation. Document release readiness for stakeholder approval. TRIGGER when: user says /release-signoff, "release signoff", "release approval", "go no-go", or "release readiness".
|
| argument-hint | [release version or feature] |
| user-invocable | true |
Release Signoff
You are a QA lead preparing a release signoff report. Evaluate test results, catalog known issues, assess release risk, and deliver a clear go/no-go recommendation with supporting evidence for stakeholder approval.
Process
Step 1: Release Overview
Capture the release context:
| Field | Details |
|---|
| Release version | Version number or release identifier |
| Release date | Target release date and time window |
| Release type | Major / Minor / Patch / Hotfix |
| Scope summary | Features, fixes, and changes included |
| Environments validated | Dev, staging, pre-prod, canary, production |
| Deployment method | Blue-green, canary, rolling, big-bang |
| Rollback plan | How to revert if issues arise post-deploy |
| Release owner | Person accountable for the release |
Step 2: Test Results Summary
Aggregate testing outcomes across all test types:
| Test Type | Total | Passed | Failed | Blocked | Skipped | Pass Rate |
|---|
| Unit tests | — | — | — | — | — | — % |
| Integration tests | — | — | — | — | — | — % |
| E2E tests | — | — | — | — | — | — % |
| Regression tests | — | — | — | — | — | — % |
| Performance tests | — | — | — | — | — | — % |
| Security scans | — | — | — | — | — | — % |
| Accessibility tests | — | — | — | — | — | — % |
| Total | — | — | — | — | — | — % |
Flag any test types that were not executed and explain why.
Step 3: Known Issues Catalog
Document all open issues going into the release:
| ID | Severity | Summary | Impact | Workaround | Decision |
|---|
| ticket | Critical/High/Med/Low | description | who and what is affected | available workaround or none | Ship / Block / Defer |
Severity definitions for release context:
- Critical -- data loss, security vulnerability, or complete feature failure; blocks release
- High -- major functionality degraded, no workaround; should block release
- Medium -- functionality impaired but workaround exists; can ship with acknowledgment
- Low -- cosmetic or minor; acceptable to ship
Step 4: Risk Assessment
Evaluate release risk across these dimensions:
| Risk Area | Status | Notes |
|---|
| Test coverage adequacy | Green / Yellow / Red | Are critical paths fully tested? |
| Regression confidence | Green / Yellow / Red | Any regressions detected? |
| Performance baseline | Green / Yellow / Red | Performance within acceptable thresholds? |
| Security posture | Green / Yellow / Red | Scans clean? Vulnerabilities addressed? |
| Data migration safety | Green / Yellow / Red | Migration tested? Rollback verified? |
| Dependency readiness | Green / Yellow / Red | Third-party services, APIs, and infra ready? |
| Rollback viability | Green / Yellow / Red | Rollback tested and documented? |
| Monitoring readiness | Green / Yellow / Red | Alerts, dashboards, and runbooks in place? |
Step 5: Go/No-Go Recommendation
Provide a clear recommendation with rationale:
| Recommendation | Criteria |
|---|
| GO | All critical and high severity tests pass, no blocking issues, risk areas green or yellow with mitigations |
| CONDITIONAL GO | Minor gaps exist, compensating measures in place, specific conditions must be met before deploy |
| NO-GO | Blocking issues remain, critical test failures, unacceptable risk in one or more areas |
Step 6: Stakeholder Signoff Matrix
| Role | Name | Decision | Date | Comments |
|---|
| QA Lead | — | Go / No-Go | — | — |
| Engineering Lead | — | Go / No-Go | — | — |
| Product Owner | — | Go / No-Go | — | — |
| Security | — | Go / No-Go | — | — |
| Operations / SRE | — | Go / No-Go | — | — |
Output Format
Present the signoff as a structured report:
- Executive Summary -- release version, recommendation (GO/NO-GO), and 3-5 key points
- Release Overview -- scope, timeline, and deployment approach
- Test Results -- summary table with pass rates by test type
- Known Issues -- cataloged issues with severity and ship/block decisions
- Risk Assessment -- dimension-by-dimension status with notes
- Recommendation -- go/no-go with detailed rationale
- Stakeholder Signoff -- signoff matrix for approval tracking
- Post-Release Plan -- monitoring priorities, validation steps, and escalation contacts for the first 24 hours
Quality Checklist
Edge Cases
- Hotfix releases: Streamline the process -- focus on the fix validation and regression around the affected area; skip full regression if time-constrained
- Feature flag releases: Document flag state; signoff may cover the flag-off state with a separate signoff for flag-on activation
- Multi-service releases with dependencies: Document deployment order, verify inter-service compatibility, and define rollback sequence
- Releases with data migrations: Require separate migration dry-run results and rollback validation
- Weekend or off-hours releases: Ensure on-call coverage is confirmed and escalation paths are staffed