| name | risk-assessment |
| description | Conduct a risk assessment — identify, analyse, and evaluate risks with quantified likelihood, impact, and treatment plans. |
| argument-hint | [system, project, initiative, or change to assess] |
| user-invocable | true |
| allowed-tools | Read, Write, Edit, Glob, Grep |
Conduct a risk assessment for $ARGUMENTS.
Process (sequential — do not skip steps)
Step 1: Scope Definition
Define what is being assessed. A risk assessment without boundaries is a worry list.
- Subject — what system, project, initiative, or change?
- Boundaries — what is included? (components, data, processes, teams)
- Exclusions — what is explicitly out of scope?
- Time horizon — when do these risks materialise? (immediate, 3 months, 12 months)
- Stakeholders — who is affected if these risks materialise?
Step 2: Risk Identification
Systematically identify risks across ALL categories. Do not skip a category because you think it does not apply — document "no identified risks" with reasoning.
| Category | What to look for |
|---|
| Regulatory | Non-compliance with GDPR, Privacy Act, SOC 2, ISO 27001, industry-specific regulations |
| Operational | Process failures, key person dependency, system outages, supply chain disruption |
| AI/ML | Bias, hallucination, privacy leakage, prompt injection, model dependency, cost spikes |
| Data | Breach, loss, corruption, unauthorised access, inadequate retention/deletion |
| Financial | Budget overruns, vendor lock-in, uncontrolled AI spend, licensing costs |
| Reputational | Customer trust, public incidents, regulatory action, negative media |
| Vendor/Third-party | Provider outage, security posture, contract terms, data residency |
For each risk identified, assign a unique ID (e.g., R-001).
Step 3: Risk Analysis
Quantify every risk. "There is a data breach risk" is not useful. "Likelihood: Medium (25%), Impact: Critical" enables decisions.
Likelihood:
| Level | Probability | Description |
|---|
| Low | < 10% | Unlikely under current conditions |
| Medium | 10–40% | Plausible given known conditions |
| High | 40–70% | Probable given current trends or known weaknesses |
| Very High | > 70% | Expected to occur without intervention |
Impact:
| Level | Description |
|---|
| Low | Minimal disruption, no data exposure, cosmetic or informational |
| Medium | Limited data exposure, feature degradation, contained impact |
| High | Significant data exposure, major feature compromise, reputational damage, regulatory scrutiny |
| Critical | Data breach, financial loss, complete service compromise, regulatory violation, legal action |
Risk matrix:
| Low Impact | Medium Impact | High Impact | Critical Impact |
|---|
| Very High likelihood | Medium | High | Critical | Critical |
| High likelihood | Low | Medium | High | Critical |
| Medium likelihood | Low | Medium | Medium | High |
| Low likelihood | Low | Low | Medium | Medium |
Step 4: Existing Controls Assessment
For each risk, document what mitigations are already in place:
| Question | Evidence to check |
|---|
| What controls exist? | Grep for auth middleware, encryption config, access controls, monitoring, CI gates |
| Are controls automated or manual? | Automated controls are reliable. Manual controls are aspirational until audited |
| When were controls last verified? | A control that was verified 2 years ago is a control that might not work |
| Are controls documented? | Undocumented controls are invisible to new team members |
Step 5: Residual Risk Calculation
Residual risk = inherent risk after existing controls are applied.
For each risk:
- Start with the inherent risk score (Step 3)
- Assess control effectiveness: Full (reduces risk by 2 levels), Partial (reduces by 1 level), None (no reduction)
- Calculate residual risk score
If residual risk is still High or Critical, the risk needs additional treatment.
Step 6: Risk Treatment
Every risk needs a treatment decision. "We'll deal with it later" is not a treatment.
| Treatment | When to use | Requirements |
|---|
| Accept | Residual risk is Low or Medium AND cost of mitigation exceeds impact | Owner, justification, review date (maximum 6 months), conditions for re-evaluation |
| Mitigate | Controls can reduce risk to acceptable level | Action plan with owner, timeline, success criteria, verification method |
| Transfer | Risk can be shifted to a third party | Insurance, contractual indemnity, or SLA with penalties. Verify the transfer is real |
| Avoid | Risk is unacceptable and no mitigation is sufficient | Change plans to eliminate the risk source entirely |
Acceptance rules:
- Every accepted risk has an owner (a person, not a team)
- Every accepted risk has an expiry date (maximum 6 months)
- Critical risks cannot be accepted without coordinator approval
- Acceptance is documented with reasoning — "low priority" is not a justification
Step 7: Risk Register Compilation
Compile all findings into the risk register format.
Anti-Patterns (NEVER do these)
- Risks without quantification — "there is a risk" without likelihood and impact is a worry, not a risk assessment
- Accepted risks without owner or expiry — unowned risks are orphaned risks. Risks without review dates are permanently ignored risks
- Missing residual risk — reporting inherent risk without accounting for existing controls overstates the risk posture
- Controls without verification — "we have encryption" without evidence it is configured correctly is a false control
- One-time assessment — risk assessments are living documents. If the system changes, the risks change. Define review triggers
- Treating all risks equally — the risk matrix exists to prioritise. Critical risks get immediate action, low risks get monitoring
Output Format
# Risk Assessment: [subject]
## Scope
- **Subject:** [what is being assessed]
- **Boundaries:** [what is included]
- **Exclusions:** [what is out of scope]
- **Time horizon:** [when risks materialise]
- **Assessment date:** [date]
- **Assessor:** [who performed this assessment]
## Risk Register
### R-001: [descriptive name]
- **Category:** [Regulatory / Operational / AI / Data / Financial / Reputational / Vendor]
- **Description:** [what could happen — specific, not generic]
- **Likelihood:** [Low / Medium / High / Very High] ([percentage estimate])
- **Impact:** [Low / Medium / High / Critical]
- **Inherent risk:** [Low / Medium / High / Critical] (from matrix)
- **Current controls:** [what mitigations exist today]
- **Control effectiveness:** [Full / Partial / None]
- **Residual risk:** [Low / Medium / High / Critical]
- **Treatment:** [Accept / Mitigate / Transfer / Avoid]
- **Treatment detail:** [specific action or justification]
- **Owner:** [person accountable]
- **Review date:** [when to reassess — maximum 6 months]
## Risk Summary
| Risk | Category | Inherent | Residual | Treatment | Owner |
|---|---|---|---|---|---|
| R-001 | [cat] | [level] | [level] | [action] | [person] |
## Prioritised Actions
[Critical/High residual risks — immediate action required]
[Medium residual risks — planned mitigation]
[Accepted risks — monitoring schedule]
[date]
[system changes, incidents, regulatory updates, 6-month maximum]