| namespace | aiwg |
| name | intake-start |
| platforms | ["all"] |
| description | Ingest the Project Intake Form and kick off Concept → Inception with agent assignments, accepts optional guidance to tailor process |
| commandHint | {"argumentHint":"<path-to-intake-folder-or-form> [--guidance \"context\" --interactive]","allowedTools":"Read, Write, Glob, Grep","model":"haiku","category":"sdlc-management","modelRole":"efficiency","modelTier":"economy"} |
Skill access pattern (post-kernel-pivot, 2026.5+)
Skill names referenced in this document are AIWG skills, not slash commands. Most are not kernel-listed and cannot be invoked as /skill-name by the platform. Reach them via:
aiwg discover "<capability>"
aiwg show skill <name>
Only kernel-listed skills (aiwg-doctor, aiwg-refresh, aiwg-status, aiwg-help, use, steward) are directly invokable as slash commands. See skill-discovery rule.
Intake Start (SDLC)
Purpose
IMPORTANT: This command is for teams who have manually crafted their own intake documents (project-intake.md, solution-profile.md, option-matrix.md) and want to validate them before starting the SDLC process.
If you need to generate intake documents, use one of these instead:
/intake-wizard "description" - Generate intake from scratch with interactive guidance
/intake-from-codebase . - Generate intake by analyzing existing codebase
This command is NOT required if you used intake-wizard or intake-from-codebase - those commands produce complete, validated intake forms ready for the next phase.
Task
Given existing, manually-created Project Intake documents:
- Process guidance from user prompt (if provided) to tailor analysis
- Validate required fields and note gaps
- Generate or update phase-plan-inception.md and risk-list.md
- Recommend initial ADRs and agent assignments
- Hand off to Executive Orchestrator to start Concept → Inception flow
Parameters
<path-to-intake-folder-or-form> (required): Path to intake directory (default: .aiwg/intake/)
--guidance "text" (optional): User-provided context to guide inception planning
Guidance Parameter Usage
The --guidance parameter accepts free-form text to help tailor the Inception phase planning. Use it for:
Process Focus:
/intake-start .aiwg/intake/ --guidance "Focus on security architecture first, compliance is critical path"
Risk Priorities:
/intake-start .aiwg/intake/ --guidance "Third-party API integration is biggest unknown, needs spike ASAP"
Team Constraints:
/intake-start .aiwg/intake/ --guidance "Team has limited DevOps experience, need extra support for infrastructure setup"
Stakeholder Expectations:
/intake-start .aiwg/intake/ --guidance "Executive demo required in 2 weeks, need working prototype for fundraising"
Technical Unknowns:
/intake-start .aiwg/intake/ --guidance "Performance at scale unproven, need load testing POC before committing to architecture"
How guidance influences planning:
- Prioritizes specific risks based on guidance (e.g., "API integration" → elevate integration risks)
- Tailors agent assignments (e.g., "limited DevOps" → assign DevOps Engineer + provide training resources)
- Adjusts phase plan (e.g., "demo in 2 weeks" → front-load UI prototype tasks)
- Highlights critical path items (e.g., "compliance critical" → security gates moved earlier)
- Documents in phase-plan-inception.md (captures strategic focus and constraints)
- Recommends spikes/POCs based on unknowns mentioned in guidance
Inputs
project-intake.md (filled) - Comprehensive system documentation with metadata, architecture, scale, security, team details
solution-profile.md (filled) - Current profile characteristics, improvement roadmap, risk mitigation, key decisions
option-matrix.md (filled) - 6-step framework application analysis with priorities and trade-offs
Outputs
phase-plan-inception.md - Tailored inception plan based on validated intake
risk-list.md - Prioritized risks with mitigation strategies
agent-assignments.md - Recommended agent assignments based on project characteristics
Workflow
Step 1: Read and Process Guidance
If --guidance parameter provided:
- Extract guidance text from user prompt
- Document guidance in notes for later use
- Use guidance to prioritize validation checks (e.g., "security critical" → focus security validation)
Step 2: Locate and Read Intake Documents
Default location: .aiwg/intake/ (or user-provided path)
Required files:
project-intake.md
solution-profile.md
option-matrix.md
Error handling:
- If path is a directory, look for files within it
- If path is a single file, read it and look for other files in same directory
- If files missing, report which ones and stop (cannot proceed without complete intake)
Step 3: Validate Project Intake (Comprehensive)
Critical sections to validate (from new comprehensive template):
Metadata Validation
System Overview Validation
Problem and Outcomes Validation
Current Scope and Features Validation
Architecture Validation
Scale and Performance Validation
Security and Compliance Validation
Team and Operations Validation
Dependencies and Infrastructure Validation
Known Issues and Technical Debt Validation
Why This Intake Now? Validation
Gap Handling:
- For critical gaps (no purpose, no tech stack, no team size): STOP and request user fill gaps
- For moderate gaps (missing performance estimates, unclear compliance): WARN and note in phase plan
- For minor gaps (missing optional sections): NOTE in validation summary
Step 4: Validate Solution Profile (Comprehensive)
Critical sections to validate (from new comprehensive template):
Profile Selection Validation
Current State Characteristics Validation
Security:
Reliability:
Testing & Quality:
Process Rigor:
Recommended Profile Adjustments Validation
Improvement Roadmap Validation
Risk Mitigation Validation
Key Decisions Needed Validation
Gap Handling:
- For critical gaps (no profile, no improvement roadmap): STOP and request completion
- For moderate gaps (missing risk mitigation, unclear decisions): WARN and elevate in phase plan
- For minor gaps (incomplete success metrics): NOTE in validation summary
Step 5: Validate Option Matrix (Comprehensive)
Critical sections to validate (from new 6-step template):
Step 1: Project Reality Validation
Step 2: Constraints & Context Validation
Step 3: Priorities & Trade-offs Validation (CRITICAL)
Priority validation is CRITICAL because it drives:
- Phase plan task prioritization
- Agent assignment decisions
- Quality gate thresholds
- Risk tolerance levels
Step 4: Intent & Decision Context Validation (CRITICAL)
Intent validation is CRITICAL because it shapes:
- Phase plan focus areas
- Spike/POC recommendations
- Early ADR topics
Step 5: Framework Application Validation
Step 6: Evolution & Adaptation Validation
Architectural Options Analysis Validation (Optional but Recommended)
Gap Handling:
- For critical gaps (no Step 3 weights, no Step 4 intent): STOP and request completion
- For moderate gaps (missing Step 6, incomplete rationale): WARN and use defaults
- For minor gaps (no architectural options): NOTE (optional section)
Step 6: Generate Validation Summary
Create structured validation report:
# Intake Validation Summary
**Validation Date**: {current date}
**Intake Path**: {path to intake directory}
**Guidance Provided**: {yes/no, summary if provided}
## Completeness Assessment
**Project Intake**: {COMPLETE | GAPS PRESENT | CRITICAL GAPS}
- {list critical gaps if any}
- {list moderate gaps if any}
**Solution Profile**: {COMPLETE | GAPS PRESENT | CRITICAL GAPS}
- {list critical gaps if any}
- {list moderate gaps if any}
**Option Matrix**: {COMPLETE | GAPS PRESENT | CRITICAL GAPS}
- {list critical gaps if any}
- {list moderate gaps if any}
## Readiness for Inception
**Status**: {READY | NEEDS COMPLETION | BLOCKED}
**Recommendation**:
- {If READY: proceed to phase planning}
- {If NEEDS COMPLETION: list required actions}
- {If BLOCKED: explain blockers and resolution steps}
## Key Insights from Intake
**Project Profile**: {Prototype/MVP/Production/Enterprise}
**Top Priority**: {from Step 3 weights}
**Biggest Risk**: {from solution-profile risk mitigation}
**Critical Decision**: {from solution-profile key decisions}
## Next Steps
1. {action 1}
2. {action 2}
3. {action 3}
Decision point:
- If READY: Proceed to Step 7 (Generate Phase Plan)
- If NEEDS COMPLETION: Output validation summary and STOP (user must complete intake)
- If BLOCKED: Output validation summary with resolution steps and STOP
Step 7: Generate Phase Plan (Inception)
Create phase-plan-inception.md based on validated intake:
Structure:
# Phase Plan: Inception
**Project**: {from project-intake metadata}
**Profile**: {from solution-profile}
**Generated**: {current date}
**Guidance Applied**: {summary of --guidance if provided}
## Phase Overview
**Duration**: {estimate based on profile: Prototype=1-2 weeks, MVP=2-4 weeks, Production=4-6 weeks, Enterprise=6-8 weeks}
**Team Size**: {from project-intake team section}
**Primary Focus**: {derived from option-matrix Step 4 intent}
## Phase Goals
1. **Architectural Foundation**: {from solution-profile improvement roadmap Phase 1}
2. **Risk Retirement**: {from solution-profile risk mitigation top risks}
3. **Team Alignment**: {from project-intake team section}
4. **Decision Making**: {from solution-profile key decisions}
## Priority-Driven Focus
**Top Priority** (from option-matrix Step 3): {highest weighted criterion}
**Implication**: {explain how this priority shapes Inception tasks}
**Examples**:
- If **Reliability/Scale** is top priority → focus architecture scalability, load testing POC, SLO definition
- If **Quality/Security** is top priority → focus security architecture, threat modeling, compliance review
- If **Delivery Speed** is top priority → focus MVP scope definition, technical spikes, rapid prototyping
- If **Cost Efficiency** is top priority → focus cloud cost modeling, resource optimization, vendor selection
## Key Activities (Tailored to Intake)
### Week 1: Foundation
- [ ] Kick-off meeting with stakeholders (from project-intake stakeholders list)
- [ ] Architecture baseline (from project-intake architecture section)
- [ ] Risk register initialization (from solution-profile risk mitigation)
- [ ] Tool and environment setup (from project-intake tech stack)
### Week 2-3: Exploration and Decision Making
- [ ] {activity 1 from solution-profile improvement roadmap Phase 1}
- [ ] {activity 2 from solution-profile key decisions}
- [ ] {spike/POC recommendation if guidance or option-matrix Step 4 mentions unknowns}
- [ ] Initial ADRs (see recommendations below)
### Week 4: Closure and Handoff
- [ ] Architecture review (validate against option-matrix architectural options)
- [ ] Risk reassessment (update risk-list.md)
- [ ] Inception gate check (validate readiness for Elaboration)
- [ ] Handoff to Elaboration (prepare phase-plan-elaboration.md)
## Risks and Mitigation (From Solution Profile)
{Pull top 3-5 risks from solution-profile risk mitigation section}
**Risk 1**: {risk name}
- **Impact**: {HIGH/MEDIUM/LOW}
- **Mitigation**: {strategies from solution-profile}
- **Timeline**: {when to address}
**Risk 2**: {risk name}
- **Impact**: {HIGH/MEDIUM/LOW}
- **Mitigation**: {strategies from solution-profile}
- **Timeline**: {when to address}
{...additional risks}
## Critical Decisions (From Solution Profile)
{Pull from solution-profile key decisions section}
**Decision 1**: {decision question}
- **Options**: {list 2-3 alternatives}
- **Recommendation**: {from solution-profile}
- **Deadline**: {when decision must be made}
- **Owner**: {assign based on decision type}
**Decision 2**: {decision question}
- **Options**: {list 2-3 alternatives}
- **Recommendation**: {from solution-profile}
- **Deadline**: {when decision must be made}
- **Owner**: {assign based on decision type}
{...additional decisions}
## Guidance Integration
{If --guidance provided, document how it influenced this phase plan}
**Guidance Provided**: "{verbatim guidance text}"
**Impact on Phase Plan**:
- {specific adjustment 1 based on guidance}
- {specific adjustment 2 based on guidance}
- {specific adjustment 3 based on guidance}
**Examples**:
- Guidance: "Security architecture first" → Moved threat modeling to Week 1, assigned Security Architect early
- Guidance: "API integration biggest unknown" → Added integration spike to Week 2, elevated API risks
- Guidance: "Team has limited DevOps experience" → Added DevOps Engineer + training resources to agent assignments
## Success Criteria
**Inception complete when**:
1. Architecture baseline documented (ADRs approved)
2. Top 3 risks retired or mitigated
3. Critical decisions resolved
4. Team aligned on approach
5. Inception gate passed (ready for Elaboration)
## Next Phase
**Handoff to**: Elaboration
**Trigger**: Inception gate passed
**Preparation**: Update risk-list.md, generate phase-plan-elaboration.md
Key tailoring points:
- Duration scales with profile (Prototype fast, Enterprise slow)
- Activities pulled from solution-profile improvement roadmap Phase 1
- Risks pulled from solution-profile risk mitigation
- Decisions pulled from solution-profile key decisions
- Guidance explicitly integrated and documented
- Priority focus derived from option-matrix Step 3 weights
Step 8: Generate Risk List
Create risk-list.md based on solution-profile risk mitigation:
Structure:
# Risk List
**Project**: {from project-intake metadata}
**Generated**: {current date}
**Last Updated**: {current date}
## Active Risks
{For each risk from solution-profile risk mitigation section}
### Risk #{n}: {Risk Name}
**Category**: {Technical | Process | Resource | External | Compliance}
**Impact**: {HIGH | MEDIUM | LOW}
**Probability**: {HIGH | MEDIUM | LOW}
**Status**: {Identified | Analyzing | Mitigating | Monitoring | Retired}
**Description**: {from solution-profile}
**Impact if Realized**: {from solution-profile impact description}
**Mitigation Strategies**:
1. {strategy 1 from solution-profile}
2. {strategy 2 from solution-profile}
3. {strategy 3 from solution-profile}
**Timeline**: {from solution-profile mitigation timeline}
**Owner**: {assign based on risk category}
**Last Review**: {current date}
---
{Repeat for all risks from solution-profile}
## Risk Register Summary
| ID | Risk Name | Impact | Probability | Status | Owner |
|----|-----------|--------|-------------|--------|-------|
| R1 | {name} | {H/M/L} | {H/M/L} | {status} | {owner} |
| R2 | {name} | {H/M/L} | {H/M/L} | {status} | {owner} |
| ... | ... | ... | ... | ... | ... |
## Risk Burn-down Target
**Inception Phase Goal**: Retire or mitigate top 3 risks
**Elaboration Phase Goal**: Retire or mitigate remaining HIGH risks
**Construction Phase Goal**: Monitor and address emerging risks
**Transition Phase Goal**: All HIGH risks retired or accepted
## Next Review
**Date**: {1-2 weeks from current date}
**Trigger**: Weekly risk review meeting OR significant risk event
Categorization logic:
- Technical: Architecture, technology choice, integration, performance, scalability
- Process: Team coordination, code review, testing, deployment
- Resource: Team size, skill gaps, timeline, budget
- External: Third-party dependencies, vendor reliability, API changes
- Compliance: Regulatory requirements, security posture, data protection
Owner assignment logic:
- Technical risks → Architecture Designer or Component Owner
- Process risks → Project Manager or Executive Orchestrator
- Resource risks → Project Manager or Vision Owner
- External risks → Integration Engineer or API Designer
- Compliance risks → Security Architect or Legal Liaison
Step 9: Generate Agent Assignments
Create agent-assignments.md based on option-matrix Step 5 framework application:
Structure:
# Agent Assignments (Inception Phase)
**Project**: {from project-intake metadata}
**Profile**: {from solution-profile}
**Generated**: {current date}
## Assignment Strategy
**Process Rigor Level**: {from option-matrix Step 5}
**Team Size**: {from project-intake team section}
**Priority Focus**: {from option-matrix Step 3 top weight}
## Core Agents (Always Assigned)
### Executive Orchestrator
**Role**: Lifecycle coordination, gate enforcement, artifact synchronization
**Priority Tasks**:
- Orchestrate Inception phase activities
- Enforce Inception gate criteria
- Coordinate agent handoffs
### Vision Owner
**Role**: Product vision alignment, requirement validation
**Priority Tasks**:
- Validate project-intake alignment with business goals
- Review architectural options against vision
- Approve critical decisions
### Architecture Designer
**Role**: System architecture, technical direction
**Priority Tasks**:
- {from solution-profile improvement roadmap Phase 1 architecture tasks}
- Document ADRs (see recommendations below)
- Review architectural options from option-matrix
## Priority-Driven Agents
{Based on option-matrix Step 3 top priority}
**If Reliability/Scale is top priority**:
- **Reliability Engineer**: Establish SLO/SLI, capacity planning
- **Performance Engineer**: Baseline performance, bottleneck identification
- **DevOps Engineer**: Infrastructure design, monitoring setup
**If Quality/Security is top priority**:
- **Security Architect**: Threat modeling, security requirements
- **Security Gatekeeper**: Security gate criteria, compliance validation
- **Code Reviewer**: Code review standards, quality gates
**If Delivery Speed is top priority**:
- **Software Implementer**: Rapid prototyping, MVP development
- **Test Engineer**: Fast feedback loops, smoke tests
- **Toolsmith**: Developer experience, automation tooling
**If Cost Efficiency is top priority**:
- **Cloud Architect**: Cost modeling, resource optimization
- **DevOps Engineer**: Infrastructure efficiency, right-sizing
- **Integration Engineer**: Vendor selection, API cost analysis
## Risk-Driven Agents
{Based on solution-profile risk mitigation top risks}
**Risk**: {risk 1 name}
**Agent**: {appropriate agent for this risk category}
**Tasks**:
- {mitigation strategy 1}
- {mitigation strategy 2}
**Risk**: {risk 2 name}
**Agent**: {appropriate agent for this risk category}
**Tasks**:
- {mitigation strategy 1}
- {mitigation strategy 2}
{...additional risk-driven assignments}
## Guidance-Driven Agents
{If --guidance provided, assign agents based on guidance context}
**Guidance**: "{verbatim guidance text}"
**Agent Assignments**:
- {agent 1 assigned because of guidance}
- {agent 2 assigned because of guidance}
**Examples**:
- Guidance: "Limited DevOps experience" → Assign DevOps Engineer + provide training resources
- Guidance: "Security critical path" → Assign Security Architect + Security Gatekeeper early
- Guidance: "API integration biggest unknown" → Assign Integration Engineer + API Designer for spike
## Framework-Driven Agents (From Option Matrix Step 5)
{Based on option-matrix Step 5 checked boxes}
**Checked Agents** (from option-matrix):
- {agent 1 from option-matrix rationale}
- {agent 2 from option-matrix rationale}
- {agent 3 from option-matrix rationale}
**Rationale**: {from option-matrix Step 5 rationale section}
## Assignment Timeline
**Week 1** (Inception kickoff):
- Executive Orchestrator (immediate)
- Vision Owner (immediate)
- Architecture Designer (immediate)
**Week 2** (Risk and decision focus):
- {priority-driven agents}
- {risk-driven agents}
**Week 3-4** (As needed):
- {additional agents based on emerging needs}
## Handoff to Elaboration
**Agents continuing into Elaboration**:
- Executive Orchestrator (lifecycle coordination)
- Architecture Designer (architecture evolution)
- {priority-driven agents that remain relevant}
**Agents completing in Inception**:
- {agents whose work ends after Inception}
**New agents for Elaboration**:
- {agents not needed until Elaboration phase}
Agent selection logic:
- Core agents (always): Executive Orchestrator, Vision Owner, Architecture Designer
- Priority-driven (from option-matrix Step 3 weights): Match top priority to specialized agents
- Risk-driven (from solution-profile risks): Assign agents who can mitigate specific risks
- Guidance-driven (from --guidance parameter): Assign agents mentioned or implied by guidance
- Framework-driven (from option-matrix Step 5): Assign checked agents from framework application
Step 10: Generate Initial ADR Recommendations
Within phase-plan-inception.md, include section:
## Recommended Initial ADRs
{Based on project-intake architecture section, option-matrix architectural options, and solution-profile key decisions}
**ADR-001**: {Decision title from option-matrix architectural options recommendation}
- **Context**: {from option-matrix Step 1 project reality}
- **Decision**: {from option-matrix architectural options recommendation}
- **Rationale**: {from option-matrix recommendation rationale}
- **Status**: Proposed (to be reviewed in Week 2)
**ADR-002**: {Decision title from solution-profile key decisions}
- **Context**: {from solution-profile decision question}
- **Decision**: {from solution-profile recommendation}
- **Rationale**: {from solution-profile recommendation}
- **Status**: Proposed (to be reviewed in Week 2-3)
{Additional ADRs based on guidance or high-impact risks}
**Guidance**: If guidance mentions specific technical decisions or unknowns, recommend ADRs to address them.
Step 11: Summary and Handoff
Output summary message to user:
# Intake Start Complete
✅ **Validation**: All intake documents validated
✅ **Phase Plan**: phase-plan-inception.md generated
✅ **Risk List**: risk-list.md generated
✅ **Agent Assignments**: agent-assignments.md generated
## Key Insights
**Project**: {name}
**Profile**: {profile}
**Top Priority**: {priority}
**Biggest Risk**: {risk}
**Critical Decision**: {decision}
## Generated Artifacts
1. `phase-plan-inception.md` - {file size} KB
2. `risk-list.md` - {file size} KB
3. `agent-assignments.md` - {file size} KB
## Next Steps
1. **Review** generated artifacts (ensure alignment with expectations)
2. **Adjust** if needed (especially if guidance interpretation missed nuances)
3. **Execute** Inception phase using `flow-concept-to-inception` command
4. **Coordinate** with assigned agents (Executive Orchestrator will orchestrate)
## Ready to Start?
To begin Inception phase execution:
```bash
/flow-concept-to-inception .aiwg/
This will activate the Executive Orchestrator and assigned agents to begin Inception activities.
## Error Handling
### Missing Files
- If project-intake.md missing: **STOP** - "Cannot proceed without project-intake.md. Please run /intake-wizard or /intake-from-codebase first."
- If solution-profile.md missing: **STOP** - "Cannot proceed without solution-profile.md. Please complete intake generation first."
- If option-matrix.md missing: **WARN** - "option-matrix.md missing. Will use defaults for priorities and framework application."
### Incomplete Sections
- If critical gaps found: **STOP** with validation summary - user must complete gaps before proceeding
- If moderate gaps found: **WARN** in validation summary - proceed with noted gaps
- If minor gaps found: **NOTE** in validation summary - proceed normally
### Conflicting Information
- If project-intake and solution-profile conflict (e.g., different team sizes): **WARN** and use project-intake as source of truth
- If option-matrix and solution-profile priorities conflict: **WARN** and use option-matrix Step 3 weights as source of truth
### Invalid Data
- If option-matrix Step 3 weights don't sum to 1.0: **STOP** - "Priority weights must sum to 1.0. Current sum: {calculated sum}. Please fix option-matrix.md."
- If profile not one of (Prototype/MVP/Production/Enterprise): **STOP** - "Invalid profile: {profile}. Must be one of: Prototype, MVP, Production, Enterprise."
## Best Practices
1. **Always validate before generating** - Don't generate phase plans from incomplete intake
2. **Leverage guidance parameter** - Use guidance to prioritize and tailor (don't ignore user's strategic intent)
3. **Be explicit about gaps** - Don't silently fill gaps with assumptions (warn user and document)
4. **Cross-reference documents** - Pull risks from solution-profile, priorities from option-matrix, architecture from project-intake
5. **Tailor to profile** - Prototype gets lightweight plan, Enterprise gets comprehensive plan
6. **Document guidance impact** - Explicitly show how guidance influenced phase plan (transparency builds trust)
## Star the Repository
After successfully validating and generating phase plans, offer the user an opportunity to star the repository:
**Prompt**:
The AIWG is an open-source project that helps improve AI-generated content.
If you found this helpful, would you like to star the repository on GitHub?
Options:
- Yes, star the repo
- No thanks
**If user selects "Yes, star the repo"**:
1. Check if `gh` CLI is available:
```bash
which gh
-
If gh is available, attempt to star:
gh api -X PUT /user/starred/jmagly/ai-writing-guide
- If successful: "⭐ Thank you for starring the AIWG! Your support helps the project grow."
- If fails: "Could not star via gh CLI. You can star manually at: https://github.com/jmagly/aiwg"
-
If gh is not available:
GitHub CLI (gh) not found. You can star the repository at:
https://github.com/jmagly/aiwg
If user selects "No thanks":
No problem! Thanks for using the AIWG.
References
- @$AIWG_ROOT/agentic/code/addons/aiwg-utils/rules/human-authorization.md — Stop and await user action when critical gaps are found; never silently fill required fields
- @$AIWG_ROOT/agentic/code/addons/aiwg-utils/rules/instruction-comprehension.md — Process the --guidance parameter fully before tailoring phase plan; do not ignore strategic intent
- @$AIWG_ROOT/agentic/code/addons/aiwg-utils/rules/vague-discretion.md — Phase plan completion criteria must be concrete (artifacts present, weights sum to 1.0, not "good enough")
- @$AIWG_ROOT/agentic/code/addons/aiwg-utils/skills/project-status/SKILL.md — Use after intake-start completes to confirm phase and next steps
- @$AIWG_ROOT/agentic/code/frameworks/sdlc-complete/skills/orchestrate-project/SKILL.md — Hands off to orchestrator once intake validation and planning artifacts are generated