Module: Agent-Led Project Planning, Scoping, and Execution Structuring
1. Module Metadata
- Module ID:
agent.module.project-planning-scoping
- Version:
1.0.0
- Maturity:
production
- Scope: End-to-end agent-guided strategic planning, risk-aware work decomposition, dependency mapping, and execution phase structuring for any project type (full-stack systems, features, refactors, data pipelines, etc.)
- Primary outcomes:
- Shared understanding between agent and human on problem, constraints, and scope
- Risk inventory and assumption mapping before execution
- Deterministic execution plan organized by skill modules and dependency ordering
- Clear phase boundaries with exit criteria and validation gates
- Early escalation of scope creep or risk changes
2. Mission and Applicability
Use this module when an agent is tasked with planning any project, whether it's a new feature, full-stack system, refactor, migration, or incident response.
Apply when:
- Agent needs to partner with a human to lock down strategy before execution
- Work is complex enough to have multiple phases, dependencies, or risk vectors
- Clarity on scope, constraints, and success is needed before diving into implementation
- Work will consume multiple skill modules (database, testing, observability, etc.)
Do not apply directly when:
- Task is single-function, single-file, or trivial (< 30 mins of work)
- Scope and approach are already locked in writing (pre-approved spec exists)
- Human is asking only for code review or small edits (use focused skills instead)
3. Agent-Planning Architecture Pattern
Pattern: Collaborative Discovery → Risk-Aware Execution Planning → Monitored Checkpoint Delivery
Core design rules:
- Agent and human co-author the strategy; neither owns planning alone
- All assumptions are made explicit and documented before work starts
- Work is decomposed into phases; each phase has clear exit criteria and validation gates
- Phases are organized by skill-module dependencies (e.g., input validation before database design)
- Highest-risk/highest-uncertainty work is de-risked first, within dependency constraints
- Parallelizable work is identified and visualized; sequential bottlenecks are flagged
- Each phase conclusion includes a rollback/abort plan in case risks materialize
Three-Stage Planning Flow:
Stage 1: Collaborative Discovery (Human + Agent)
├─ Problem Definition
├─ Constraints & Trade-offs
└─ Scope Boundary
↓
Stage 2: Execution Planning (Agent-Driven)
├─ Risk Inventory & Ranking
├─ Dependency Graph Analysis
└─ Skill-Module Phase Organization
↓
Stage 3: Execution with Checkpoints (Agent-Monitored)
├─ Phase Execution (with monitoring)
├─ Exit Criteria Validation
├─ Risk Escalation (if new risks emerge)
└─ Checkpoint Review & Rollback Plan
4. Implementation Workflow
Phase A: Collaborative Discovery (Problem → Constraints → Scope)
Sub-phase A1: Problem Definition
- Agent asks: What problem are we solving? (open-ended, let human narrate)
- Agent clarifies: Who are the primary users/stakeholders affected by this?
- Agent probes: What does success look like? How will we measure it? (gather 3–5 measurable criteria)
- Agent documents: Narrative problem statement + stakeholders + success metrics
- Agent confirms: Have I understood the core problem correctly?
Exit criteria:
- Problem statement is one paragraph, jargon-free, and actionable
- Primary users/stakeholders are named with their goals
- Success metrics are quantifiable (e.g., "latency < 200ms", "adoption > 50%", "error rate < 0.1%")
- Agent and human agree on what "done" means
Sub-phase A2: Constraints & Trade-offs
- Agent asks: What are your hard constraints? (timeline, budget, team size, tech stack, compliance, regulatory)
- Agent asks: What trade-offs matter most to you? (quality vs. speed, scope vs. polish, cost vs. capability, risk vs. simplicity)
- Agent maps trade-offs: If timeline is tight, we prioritize core features over edge cases; if budget is constrained, we use open-source over managed services
- Agent documents: Constraint table + trade-off priority order
- Agent confirms: If we're forced to choose between these, should we prioritize X over Y?
Exit criteria:
- All hard constraints (timeline, budget, team, tech) are documented and quantified
- Trade-off hierarchy is explicit (what matters most when conflicts arise)
- Team composition and availability is mapped (who is working on this, when)
- Regulatory/compliance constraints are explicitly listed
Sub-phase A3: Scope Boundary
- Agent proposes: Based on problem, constraints, and success criteria, here's what I think is in-scope vs. out-of-scope (provide concrete lists)
- Human adjusts: I need to add X, remove Y, reprioritize Z
- Agent identifies: These items could expand scope or create new dependencies: (risk flags)
- Agent documents: Feature list (in-scope + out-of-scope) + scope assumptions + scope-creep risks
- Agent confirms: Are we aligned on what's in the box and what's out?
Exit criteria:
- In-scope features are named and briefly described
- Out-of-scope items are explicitly listed (clarifies what won't be done)
- Scope assumptions are documented (what could change this boundary?)
- Scope-creep risk flags are identified (e.g., "stakeholder X might ask for Y mid-project")
Deliverable: Discovery Document
# Project Discovery: [Project Name]
## Problem Definition
[One paragraph problem statement]
**Primary Stakeholders:**
- [Name/Role]: [Goal/Need]
**Success Metrics:**
- [Metric 1]: [Target]
- [Metric 2]: [Target]
## Constraints & Trade-offs
| Constraint | Value | Impact |
|---|---|---|
| Timeline | [Date] | [What gets cut if slipped] |
| Budget | [Amount] | [Scope implications] |
| Team | [Size/Availability] | [Parallelization limits] |
**Trade-off Priority:** [If forced to choose, we prioritize...]
## Scope Boundary
**In-Scope:** [Feature 1, Feature 2, Feature 3]
**Out-of-Scope:** [Feature A, Feature B, Feature C]
**Assumptions:** [What could change this boundary?]
Phase B: Execution Planning (Risk-Aware Dependency Structuring)
Sub-phase B1: Risk Inventory & Ranking
- Agent identifies: Based on the problem and constraints, what are the highest-risk areas?
- Technical risks (unproven approaches, new tech, integration complexity)
- Resource risks (team availability, skill gaps, external dependencies)
- Schedule risks (tight timeline, parallel work, handoff complexity)
- Scope risks (unclear requirements, scope creep, stakeholder misalignment)
- Agent ranks: Risk matrix (likelihood × impact)
- Agent flags: These are our biggest unknowns; we should de-risk these first
Exit criteria:
- Risk inventory has 5–10 ranked items with concrete mitigation
- De-risk strategy is explicit (e.g., "spike on auth architecture before building BFF")
- Escalation triggers are defined (e.g., "if timeline slips by 1 week, we cut feature X")
Sub-phase B2: Dependency Graph Analysis
- Agent maps: All major work items as nodes; dependencies as edges (A must complete before B)
- Agent identifies: Parallelizable clusters (independent work that can run concurrently)
- Agent identifies: Critical path (longest dependent chain; this determines minimum project duration)
- Agent visualizes: ASCII or text dependency tree (shows what's parallel vs. sequential)
Exit criteria:
- Dependency graph is documented (text or diagram)
- Critical path is identified and highlighted
- Parallelizable work is clustered
Sub-phase B3: Skill-Module Phase Organization
- Agent assigns: Each major work chunk to a SKILLS module (e.g., Input Validation, RAG System, Testing Strategy, Error Handling)
- Agent orders: Phases follow dependency ordering + skill prerequisites
- Agent creates: Execution phase structure with explicit handoffs
Example structure:
Phase 1 (De-Risk & Foundation)
├─ Spike: Architecture + tech decisions
├─ Skill: Input Validation Standard (define contracts)
└─ Exit: API contracts are locked, team aligned on tech stack
Phase 2 (Core Backend)
├─ Skill: Django + PostgreSQL Standard
├─ Skill: Error Taxonomy & Handling
└─ Exit: Core API endpoints tested, error handling consistent
Phase 3 (Frontend & BFF)
├─ Skill: Frontend UI (Shadcn + Magic UI)
├─ Skill: Full-Stack AI Platform (if AI involved)
└─ Exit: UI implemented, BFF routes authenticated
Phase 4 (Observability & Hardening)
├─ Skill: Observability & Instrumentation
├─ Skill: Testing Strategy & Coverage
└─ Exit: Logging/metrics in place, test coverage > 80%
Phase 5 (Launch Readiness)
├─ Deploy to staging
├─ Run validation suite
├─ Execute runbooks
└─ Exit: Production-ready, rollback plan in place
Exit criteria:
- Each phase is assigned 1–2 relevant SKILLS modules
- Phases respect dependency order
- Parallelizable phases are grouped
- Each phase has clear exit criteria
Deliverable: Execution Plan
# Execution Plan: [Project Name]
## Risk Inventory (Ranked by Impact × Likelihood)
| Risk | Likelihood | Impact | Mitigation |
|---|---|---|---|
| [Risk 1] | High | High | [Spike, proto, expert review] |
## Dependency Graph
[ASCII or narrative: what depends on what]
## Critical Path
[Longest chain; this determines project duration]
## Execution Phases
### Phase 1: [Name]
**Skills Applied:** [Module 1, Module 2]
**Dependencies:** [What must be done first]
**Deliverables:** [Concrete outputs]
**Exit Criteria:** [Definition of done for this phase]
**Rollback Plan:** [If this phase fails, what do we do?]
[Repeat for each phase]
## Checkpoint Gates
- **After Phase 1:** Risk review + stakeholder alignment
- **After Phase 2:** Architecture validation + security audit
- **[etc.]**
Phase C: Execution with Checkpoints (Monitoring & Risk Escalation)
During execution, agent monitors:
- Phase Progress: Are we meeting exit criteria?
- New Risk Emergence: Are unexpected blockers appearing?
- Scope Creep: Are new requirements sneaking in?
- Timeline Health: Are we on track against critical path?
At each phase boundary:
- Agent validates: All exit criteria met?
- Agent assesses: Have risks changed? New risks emerged?
- Agent escalates: If risk status changed, notify human immediately
- Agent documents: What we learned, what changed, rollback triggers
Exit criteria:
- All phase exit criteria are met before advancing
- New risks are flagged and triaged before moving forward
- Rollback triggers are documented and monitored
5. Decision Framework
| Decision Area | Preferred Option | Alternative | Selection Rule |
|---|
| Planning depth | Collaborative (both voices) | Agent-only or human-only | Both perspectives prevent blind spots and build buy-in. |
| Risk ranking method | Impact × Likelihood matrix | Gut feel / intuition | Matrix is repeatable and helps prioritize mitigation. |
| Work decomposition | Skill-module aligned + dependency ordering | Linear sequential phases | Skill alignment reuses existing guidance; dependency ordering enables parallelization. |
| Execution monitoring | Checkpoint gates after each phase | Continuous free-form | Gates create decision moments; prevent silent scope creep. |
| Scope change process | Explicit re-plan (risk/timeline impact) | Ad-hoc "just add it" | Explicit process clarifies trade-offs and prevents chaos. |
6. Validation Strategy
Discovery Validation
Planning Validation
Execution Validation
Failure-Mode Validation
7. Benchmarks and SLO Targets
| Metric | Target | Rationale |
|---|
| Discovery completion | < 1 week for most projects | Prevents analysis paralysis; lock strategy early |
| Planning completion | < 3 days after discovery | Execution plan should be ready before first line of code |
| Phase duration | 1–2 weeks per phase (typical) | Longer phases are risky; shorter checkpoints catch issues faster |
| Risk escalation time | < 24 hours of discovery | New risks should surface quickly; silent problems are worst |
| Scope change decision time | < 48 hours of request | Delays create chaos; explicit yes/no/defer is better than indecision |
| Phase success rate | >= 90% phases meet exit criteria on first attempt | If lower, planning accuracy is poor; re-examine up-front work |
| Rollback execution time | <= 4 hours per phase | Rollback should be faster than continuing with broken work |
8. Risks and Controls
| Risk | Likelihood | Impact | Control |
|---|
| Analysis paralysis (discovery too long) | High | Medium | Set hard deadline for discovery (1 week max); use discovery doc template to keep focused |
| Scope creep (new features sneak in mid-project) | High | High | Explicit scope boundary in Phase A; checkpoint gates that require scope-change triage; escalate immediately |
| Hidden dependencies (phases blocked on undiscovered work) | Medium | High | Dependency graph must be explicit; agent asks "what could block this" for each phase |
| Risk blindness (risks not identified upfront) | Medium | High | Risk inventory should have 5–10 items; if fewer, agent probes deeper; escalate if major risk appears mid-project |
| Timeline slip (constant pushing of deadlines) | High | Medium | Critical path is explicit; escalation triggers are pre-agreed (if slip > 1 week, scope is cut); human is consulted before adjustment |
| Misalignment (agent and human disagree on plan) | Medium | Medium | Collaborative discovery (both voices); explicit sign-off on discovery doc; checkpoint reviews before advancing |
9. Agent Execution Checklist
Discovery Phase
Planning Phase
Execution Phase
10. Reuse Notes
This module is foundational for all projects. Adapt:
- Discovery depth — Simple features may skip sub-phase A3 (scope is obvious); complex systems should expand each sub-phase
- Risk inventory size — Small projects: 3–5 risks; large projects: 10–15 risks
- Phase duration — Adjust based on project size (1-week phases for small projects, 2–4 week phases for large systems)
- Checkpoint frequency — Weekly for high-risk projects; bi-weekly for stable projects
- SKILLS module assignments — Substitute domain-specific modules based on the actual work (this template shows examples; your project will have different modules)
Do NOT adapt:
- The three-stage structure (Discovery → Planning → Execution)
- The requirement for explicit scope boundary and trade-off hierarchy
- Checkpoint gates at phase boundaries
- Risk escalation within 24 hours
- Explicit rollback plans for each phase
These are non-negotiable patterns that prevent silent failures and scope chaos.