| name | Capital Project Intake and Prioritization |
| slug | capital_project_intake_and_prioritization |
| version | 0.1.0 |
| status | draft |
| category | residential_multifamily |
| subsystem | residential_multifamily |
| pack_type | workflow |
| targets | ["claude_code"] |
| stale_data | Capex line-item libraries, labor rates, escalation assumptions, and replacement cost
benchmarks drift. Prioritization rubric weights live in overlays. Life-safety
classifications come from jurisdiction overlays.
|
| applies_to | {"segment":["middle_market"],"form_factor":["garden","walk_up","wrap","suburban_mid_rise","urban_mid_rise"],"lifecycle":["stabilized","renovation","recap_support"],"management_mode":["self_managed","third_party_managed","owner_oversight"],"role":["property_manager","regional_manager","asset_manager","construction_manager","estimator_preconstruction_lead"],"output_types":["memo","checklist","estimate","kpi_review"],"decision_severity_max":"action_requires_approval"} |
| references | {"reads":["reference/normalized/capex_line_items__{scope}.csv","reference/normalized/labor_rates__{market}.csv","reference/normalized/material_costs__{region}_residential.csv","reference/normalized/capex_priority_rubric__{org}.yaml","reference/normalized/approval_threshold_defaults.csv"],"writes":[]} |
| metrics_used | ["capex_spend_vs_plan","renovation_yield_on_cost","repeat_work_order_rate","controllable_opex_per_unit"] |
| escalation_paths | [{"kind":"life_safety_prioritization","to":"maintenance_supervisor + property_manager + regional_manager -> approval_request(row 4)"},{"kind":"bid_award","to":"construction_manager + asset_manager -> approval_request(row 9)"},{"kind":"capex_program_change","to":"asset_manager + portfolio_manager -> approval_request(rows 8-11 per dollar)"}] |
| approvals_required | ["capex_program_change","life_safety_prioritization"] |
| description | Intake for capital project ideas from any source (PM, regional, AM, engineering, capex
plan cycle). Scores each project against the overlay's priority rubric (life safety,
deferred maintenance, renovation yield, risk mitigation, regulatory). Produces the
prioritized backlog and flags gated decisions.
|