When to Use This Skill
Use when provisioning a new Fabric capacity, when a capacity is throttling and the cause is unclear, or when planning a multi-workload isolation strategy.
1. Fabric CU Model Refresher
Fabric capacity is measured in Capacity Units (CUs). Each operation consumes CUs; the system smooths consumption over a rolling window (10-second bursts, 24-hour background smoothing). A workload can burst above its SKU's baseline as long as the smoothed average stays under the limit.
| SKU | CUs | Monthly cost (approx, East US) | Typical use |
|---|
| F2 | 2 | ~$262 | Small dev/test |
| F4 | 4 | ~$524 | Single team POC |
| F8 | 8 | ~$1,048 | Small prod workload |
| F16 | 16 | ~$2,097 | Medium team |
| F32 | 32 | ~$4,194 | Multi-team or mixed workloads |
| F64 | 64 | ~$8,389 | Large analytics platform |
[Verify prices at build — Fabric pricing changes frequently.]
2. Sizing Decision
Step 1 — Estimate average concurrent CU demand (not peak):
CU estimate = SUM(workload_avg_CU) across all concurrent workloads
Fabric smooths over a 24-hour window for background jobs — size to average + 20% headroom, not to the peak of a single large pipeline run.
Step 2 — Select the next SKU tier above your estimate.
Step 3 — Enable surge protection (Overload protection in the Admin portal) to prevent a single runaway job from exhausting the capacity.
Step 4 — Monitor for 2 weeks. Check the Fabric Capacity Metrics app for actual utilization; rightsize if P90 utilization is consistently < 40% (downsize) or > 80% (upsize or isolate).
3. Workload Isolation Strategy
| Isolation reason | Pattern |
|---|
| Dev vs prod | Separate capacities (different F SKUs; dev can be smaller) |
| Noisy ETL vs interactive queries | Separate capacities or workspace assignment with different capacities |
| Tenant isolation (ISV) | Separate capacity per tenant (billing boundary, security boundary) |
| One heavy batch job starving dashboards | Move the batch job to a dedicated workspace on a separate capacity |
Capacity A (F8) — prod interactive workloads (semantic models, dashboards)
Capacity B (F4) — prod batch/pipeline workloads (Data Factory pipelines, Spark)
Capacity C (F2) — dev/test (all teams share)
4. Diagnosing Throttling
Throttling surfaces as slow queries, pipeline failures, or "Capacity exceeded" errors.
Admin portal → Capacity Metrics app → select capacity → "Throttling" tab
Key metrics to check:
| Metric | Throttling if |
|---|
| Background CU utilization | Smoothed 24h average > 100% |
| Interactive CU utilization | 10s burst > SKU interactive limit |
| Rejected requests | > 0 on interactive tier |
Common causes:
- A single large Spark notebook consuming all background CUs — move to a separate capacity or schedule off-peak
- Direct Lake semantic model refresh coinciding with pipeline run — stagger schedules
- Too many concurrent dataflow Gen2 refreshes — reduce parallelism or upgrade SKU
- V-Order not enabled on gold tables — queries consume more CUs than necessary
5. Capacity Metrics App Queries (KQL)
// Top 5 artifacts by CU consumption — last 24h
FabricCapacityMetrics
| where TimeGenerated > ago(24h)
| summarize TotalCU = sum(CUSeconds) by ArtifactName, ArtifactKind
| top 5 by TotalCU desc
[Metric names and schema are Fabric-version dependent — verify at build.]
6. Reservation and Cost Optimization
| Strategy | Discount | Commitment |
|---|
| Pay-as-you-go | 0% | None |
| 1-year reservation | ~37% | 1 year, upfront or monthly |
| 3-year reservation | ~53% | 3 years, upfront |
| Pause capacity (non-prod) | ~40-60% | None — pause nights/weekends |
For dev/test capacities, configure an auto-pause schedule (pause at 7pm, resume at 8am) — reduces cost by ~55% on an F2.
7. Checklist Before Go-Live
Pitfalls
- Sizing for the peak of a single large Spark job — Fabric smooths over 24 hours; this leads to over-provisioning
- Running all workloads on one capacity — one heavy pipeline starves interactive reports
- Not enabling surge protection — a runaway job can exhaust the capacity and throttle all other workloads
- Forgetting that mirroring is free to replicate but billed to query — a Mirroring-heavy workspace inflates CU consumption on reads