references/equipment-selection-guide.md | Excavators, dozers, cranes, loaders, compactors, pumps, generators, lifts — sizing rules, selection decision trees, rental specs, mobilization, production rate tables, hauling capacity, fleet balancing | Superintendent asks about equipment sizing, crane capacity, production rates, truck fleet sizing, or what machine to use for a task |
references/concrete-field-operations.md | Slump ranges, air entrainment, cold/hot weather protocols, cylinder testing, pour cards, ACI 301/318 field requirements, common defects | Any concrete-related question: placement, testing, weather protection, mix design interpretation |
references/advanced-concrete-guide.md | Post-tensioning, tilt-up, precast, mass concrete, architectural concrete, self-consolidating concrete, fiber-reinforced, underwater placement | Advanced concrete operations beyond standard CIP: specialty pours, PT stressing, tilt-up erection, precast connections |
references/structural-steel-field-guide.md | Bolt torque (A325/A490), installation methods, erection tolerances, connections, weld inspection, piece mark tracking | Steel erection, bolt-up, inspection, connection type identification |
references/earthwork-compaction-guide.md | Compaction standards by location, Proctor tests, moisture control, proof rolling, nuclear gauge, soil classification, swell/shrinkage | Earthwork operations, fill placement, subgrade prep, compaction testing |
references/bmp-field-guide.md | Silt fence specs, inlet protection, stabilized entrance, concrete washout, erosion control by slope, SWPPP compliance, maintenance | Stormwater management, erosion control, SWPPP inspections, BMP installation/maintenance |
references/mep-coordination-guide.md | Ceiling cavity depths, pipe sleeves, fire-stopping, electrical clearances, plumbing slopes, HVAC duct sizing, trade sequencing, ductwork/piping/electrical installation standards | MEP rough-in coordination, trade sequencing, above-ceiling work, code clearances, system installation verification |
references/fire-protection-field-guide.md | Sprinkler spacing/coverage, fire-rated assemblies, penetration fire-stopping, standpipes, fire alarm systems, smoke control, emergency power integration, fire pump testing | Fire protection installation verification, fire-rated wall inspections, device spacing checks, alarm system commissioning |
references/building-envelope-guide.md | Foundation waterproofing, roofing systems (TPO/EPDM/built-up/metal), flashing, rough openings, air/vapor barriers | Waterproofing, roofing, window/door installation, building envelope continuity |
references/site-logistics-guide.md | Crane placement, material staging, temporary power, dewatering, dust control, traffic control, temporary fencing | Site setup, logistics planning, temporary facilities, environmental controls |
references/formwork-shoring-guide.md | ACI 347 formwork design, formwork types (plywood, aluminum, engineered), shoring loads, reshoring, stripping times, inspection checklists | Formwork selection, shoring design verification, stripping time determination, multi-story reshoring |
references/scaffolding-guide.md | Frame, system, tube-and-clamp, mast climbing, suspended scaffolds — load capacity, OSHA 1926.450-454, erection/inspection, tag system | Scaffold erection oversight, daily inspections, load capacity verification, competent person duties |
references/masonry-field-guide.md | CMU types/sizes/grades, mortar types (M/S/N/O), bond patterns, grouting, rebar placement, brick veneer, stone anchoring, cold/hot weather masonry | Masonry installation, mortar selection, grouting operations, veneer systems, weather protection |
references/waterproofing-systems-guide.md | Below-grade systems (bentonite, spray, sheet, crystalline), traffic coatings, plaza decks, joint sealants, air/vapor barriers, water testing | Waterproofing system selection, installation verification, leak testing, sealant selection |
references/underground-utilities-guide.md | Water, sanitary, storm, gas, electric, telecom — trench specs, bedding/backfill (ASTM D2321), pipe materials, pressure testing, crossings | Utility installation, trench excavation, pipe bedding, pressure testing, utility crossings and separations |
references/paving-flatwork-guide.md | Asphalt (HMA types, lift thickness, temperature, compaction), concrete flatwork (finishing, joints, FF/FL), ADA accessibility, curb/gutter | Paving operations, concrete flatwork finishing, joint layout, ADA compliance, seasonal restrictions |
references/crane-lift-planning-guide.md | Lift Director responsibilities, critical lift criteria, pre-lift planning, rigging hardware/capacity, signal person requirements, crane inspections, multi-crane lifts | Lift planning, critical lift documentation, rigging selection, crane inspection verification, signal person coordination |
references/construction-surveying-guide.md | Benchmark establishment, control networks, layout procedures (total station, GPS/RTK), staking, elevation verification, as-built surveys | Survey layout verification, benchmark checks, cut/fill calculations, as-built documentation, survey error resolution |
references/temporary-facilities-guide.md | Temporary power (load calc, distribution, GFCI), temp water, heating/cooling, winter protection, dewatering systems, temporary enclosures | Temporary facility planning, winter protection, temp power sizing, dewatering selection, enclosure requirements |
references/multi-story-coordination-guide.md | Floor-by-floor sequencing, vertical transportation, tower crane logistics, material hoisting, concrete pumping for high-rise, multi-trade stacking | Multi-story building coordination, vertical logistics, floor cycle planning, high-rise operations |
references/cross-trade-coordination-guide.md | Pre-installation meetings, above-ceiling coordination, slab penetration management, sequence of operations, trade stacking rules, conflict resolution | Trade coordination meetings, above-ceiling rough-in sequencing, penetration layout, trade conflict resolution |