| name | kicad-manufacture |
| description | Manufacturing and fabrication workflow for KiCAD projects via MCP tools. Triggers on: "send to fab",
"order boards", "gerbers", "JLCPCB", "manufacturing", "export for production", "pick and place",
"assembly files", "generate fabrication outputs", "BOM for fab", "production files", "fab house".
|
| argument-hint | [fab house or export task] |
KiCAD Manufacturing & Fabrication Workflow
Prepare manufacturing outputs through Konnect MCP tools. Treat each tool result
as evidence with a named scope: a successful request is not by itself proof of a
complete, current, upload-ready package. A required check or artifact that cannot
be established makes the manufacturing verdict INCOMPLETE.
Toolset loading
Load the required toolsets:
load_toolset('pcb_export') # Gerber, drill, BOM, position, 3D, and direct DRC evidence
load_toolset('manufacturing') # Package export, manufacturing preflight, and rough cost estimate
Load additional toolsets only for the branch that needs them:
load_toolset('sch_analysis') # schematic inventory and footprint assignment
load_toolset('integration') # local JLCPCB catalogue and alternatives
Call get_active_toolsets() before loading more.
References by manufacturing branch
- Read
references/gerber-layers.md when
selecting plot layers or accepting a generated artifact inventory.
- Read
references/jlcpcb-rules.md only when
JLCPCB is the selected fabricator or assembler. It defines how to capture the
current order contract without caching volatile limits, prices, categories,
or field names in this skill.
1. Capture the order contract
Before checking or exporting, record the selected fabricator, service tier,
stackup, copper weight, finish, assembly sides, stencil requirement, quantity,
and any controlled-impedance service. Record the source and retrieval date for
every vendor-controlled requirement. Project rules and output acceptance are
judged against that record.
Completion criterion: every applicable fabrication and assembly constraint has
one current authority, and no decision rests on an undated table in this skill.
2. Establish direct design evidence
Run direct KiCad DRC against the saved target board and resolve every error or
record a deliberate, reviewable waiver. Then run:
validate_for_manufacturing(board, fab_house?)
The current handler checks only:
- presence of at least one
Edge.Cuts item;
- presence of footprints;
- the configured minimum trace width against its built-in fab profile;
- the coarse case where several nets exist but no routed tracks exist; and
- direct
kicad-cli DRC evidence, which must be available and complete for a
READY verdict.
Read verdict, issues, and drc together. A null or incomplete drc, a
NOT READY verdict, or an unadjudicated issue blocks release.
This preflight does not prove outline closure, copper on every pad, drill-size
acceptance, silkscreen clearance, stackup compatibility, or assembly readiness.
Establish those separately with direct DRC, the selected fabricator's current
contract, Gerber/drill inspection, BOM/CPL review, and the order preview.
Completion criterion: direct DRC is complete, every reported issue is resolved
or waived, and every check outside the handler's stated scope has named evidence.
3. Export into a fresh destination
Prefer a new, empty output directory for each invocation. This makes stale files
structurally unable to impersonate output from the current invocation.
For a package attempt:
export_manufacturing_package(board, output_dir, fab_house?, schematic?)
Pass schematic when assembly output requires a BOM. The tool attempts Gerber,
drill, position, and BOM exports according to the request; individual failures
can still leave a partial directory.
Artifact acceptance gate
- Inspect
warnings and files_generated. Any warning or missing requested
artifact type keeps the result INCOMPLETE.
- Reconcile the requested copper, mask, silkscreen, paste, and
Edge.Cuts
layers against the actual files in the fresh output directory.
- Confirm every required artifact is a regular, non-empty file produced by the
current invocation. A directory entry, reported path, or zero exit status is
not enough.
- Confirm the required plated and non-plated drill outputs for the actual board
hole inventory. Absence is acceptable only when the design proves that output
is inapplicable.
- Open the Gerbers and drills in a viewer. Inspect layer registration, outline,
apertures, holes/slots, mask, paste, and silkscreen.
- For assembly, inspect BOM contents, DNP handling, designator coverage, CPL
side/units/origin/rotation, and the fabricator's export preview.
The current files field is a directory listing and can include pre-existing
entries; files_generated records successful export calls but does not prove
that every reported output is fresh and non-empty. If a later tool response
provides an explicit verified artifact manifest, accept that stronger evidence
only for the artifacts and postconditions it names. Preserve the viewer and
order-preview checks.
Completion criterion: an accepted manifest accounts for every required output,
every accepted path is fresh and non-empty, and visual/order previews agree with
the saved design.
4. Use manual exports when control is required
Use the individual tools when a package needs explicit layer, BOM, side, unit,
or filename choices:
export_gerber(board, output_dir, layers?, drill_file?)
export_bom(schematic, output, format?, fields?, group_by?, labels?, exclude_dnp?)
export_position_file(board, output, format?, side?, units?)
Apply the same fresh-destination and artifact acceptance gate. A manual sequence
does not lower the evidence requirement.
5. Treat cost output as a heuristic
estimate_cost(board, quantity?, layers?, fab_house?)
estimate_cost is an indicative heuristic built from fixed assumptions and
rough average component costs. Use it only for coarse comparisons. It is not a
vendor quote and does not know the selected finish, service, complete BOM,
shipping, taxes, coupons, or current pricing. Budget and purchasing decisions
require a current quote from the selected fabricator.
6. Record manufacturing acceptance
The final report must include:
- saved design revision or hash;
- direct DRC status and any explicit waivers;
validate_for_manufacturing verdict, issues, and DRC coverage;
- selected fabricator/order contract with source and retrieval date;
- accepted artifact manifest with file type, path, and non-empty evidence;
- Gerber/drill viewer result;
- BOM/CPL and order-preview result when assembly is in scope;
- 3D/enclosure inspection status when mechanically relevant; and
- final
READY, NOT READY, or INCOMPLETE verdict.
Only READY permits upload. Preserve the accepted manifest rather than telling
the user to upload every entry found in a reused directory.