| name | omh-physical-device-readiness |
| description | ["omh"] |
| Physical device readiness - gate robots, 3D printers, IoT relays, sensors, and lab hardware before trials; use external-connector-readiness for provider or connector adoption and toolbelt-readiness for missing control tools. Use when the user says | physical-device-readiness, physical device readiness, device safety readiness, physical device safety, hardware safety gate, 3d printer readiness, 3D printer safety, snapmaker printer safety. |
| metadata | {"hermes":{"tags":["workflow","oh-my-hermes","operations"],"category":"operations","phase":"device-readiness","role":"operator","quality_tier":"workflow-surface-gated"}} |
Physical Device Readiness
This is a Hermes-native physical-device-readiness workflow skill.
Why This Exists
physical-device-readiness exists so Hermes users can ask for this workflow in chat and receive a structured, evidence-bounded OMH operating surface instead of ad hoc narration.
Do Not Use When
- The request is already handled by a narrower explicit skill with stronger evidence.
- The user asks OMH to secretly run external platforms, connectors, schedulers, file exports, or runtime agents.
- The only safe answer is to ask for missing authority, credentials, target, or observed evidence first.
Examples
Good example:
- Prompt: physical-device-readiness check Snapmaker printer safety with camera gate, slicer dry-run, heat command approval, and emergency-stop evidence before printing.
- Expected behavior: Produce
prepare_physical_device_readiness with required context, wrapper actions, and not-evidence boundaries.
- Why: The prompt names a real workflow surface that Hermes can orchestrate without hiding execution.
Bad example:
- Prompt: physical-device-readiness start the printer, heat the bed, flip relays, and claim the robot is safe without observed operator approval or device telemetry.
- Expected behavior: Report the missing observed evidence or authority instead of claiming the external step happened.
- Why: Prepared OMH guidance is not platform, runtime, connector, file, memory, or delivery evidence.
Completion Checklist
- Device scope, actuator and hazard classes, sensor/camera gates, operator approval, dry-run policy, emergency stop, and stop condition are explicit.
- Physical actions, heat commands, relay toggles, robot movement, print starts, camera inspections, and telemetry readings are marked observed, missing, risky, or not_observed.
- Route external APIs or provider setup to external-connector-readiness, terminal commands to command-operator, safety concerns to security-safety-review, visual/camera checks to visual-qa, and missing tools to toolbelt-readiness.
- Do not claim device movement, heat, print, relay, robot, camera, sensor, or emergency-stop success without observed device-trial evidence.
Recovery Notes
- If the device, workspace, actuator, or authority is unclear, keep readiness blocked until the missing safety context is named.
- If the user asks to execute commands, move hardware, heat a bed/nozzle, flip a relay, or start a print, route to command-operator or connector-operator and require observed operator approval before any execution claim.
- If camera or telemetry evidence is required but unavailable, route to visual-qa or toolbelt-readiness and keep the physical device readiness card prepared_not_observed.
Workflow Lane
- Current lane: Automation and status (
achievements, workspace-audit, production-audit, automation-blueprint, github-event-ops, buzz, agent-board, gateway-intent-card, +34 more) - schedules, status, health, and ops review.
- If intent belongs to another lane, hand back to
oh-my-hermes or name the adjacent workflow.
- Shared product, routing, compatibility, and evidence rules:
omh-routing/references/skill-common-rail.md.
Use When
Use before preparing or adopting a workflow that could move, heat, print, actuate, unlock, or otherwise affect physical devices so safety envelope, sensor/camera gates, dry-run policy, operator approval, emergency stop, and observation requirements are explicit.
Strong routing signals: `physical-device-readiness`, `physical device readiness`, `device safety readiness`, `physical device safety`, `hardware safety gate`, `3d printer readiness`, `3D printer safety`, `snapmaker printer safety`, `snapmaker readiness`, `moonraker klipper safety`, `camera-gated print start`, `camera gate`, `heat command approval`, `iot relay safety`, `sensor relay safety`, `robotics safety`, `robot control readiness`, `vla robot readiness`, `mushroom cultivation relay safety`, `raspberry pi relay safety`, `물리 장비 안전`, `하드웨어 안전`, `3d 프린터 안전`, `프린터 안전`, `로봇 제어 준비`, `iot 릴레이 안전`, `센서 릴레이 안전`
Catalog Metadata
Category: operations
Phase: device-readiness
Hermes role: operator
Quality tier: workflow-surface-gated
Reasoning demand: light
Quality bar:
- Name the user-facing workflow objective, required context, next action, and stop condition.
- Separate prepared guidance from observed platform, runtime, connector, file, memory, or delivery evidence.
- Expose missing tools, credentials, targets, or observations as user-visible gaps.
Handoff policy:
Keep this as Hermes-facing orchestration guidance first. Prepare executor, connector, gateway, or host-runtime handoff only when the user accepts that next step and observed evidence can be recorded.
Required inputs:
- user request
- target context
- delivery or status expectation
- known missing evidence
Expected outputs:
- physical_device_readiness_card/v1
- device_safety_envelope/v1
- hazard_and_actuator_inventory/v1
- sensor_camera_gate_policy/v1
- operator_approval_policy/v1
- dry_run_and_simulation_policy/v1
- emergency_stop_and_rollback_plan/v1
- device_trial_manifest/v1 when observed
- next action
- prepared-vs-observed boundary
Artifact expectations:
- physical_device_readiness_card/v1 metadata-only wrapper card when prepared
- device_safety_envelope/v1 with device, workspace, hazards, actuator classes, human/property risk, owner, authority, and stop condition
- hazard_and_actuator_inventory/v1 separating motion, heat, pressure, electrical, relay, network, credential, and environmental risks
- sensor_camera_gate_policy/v1 for camera/OCR, sensor telemetry, stale readings, manual inspection, and blocked/no-camera fallback
- operator_approval_policy/v1 with explicit human authority, confirmation moment, disallowed autonomous actions, and emergency contact or stop owner
- dry_run_and_simulation_policy/v1 for slicer/G-code dry-runs, command previews, mock relays, simulated robot paths, and no-hardware trial mode
- emergency_stop_and_rollback_plan/v1 with stop command, power/network isolation, recovery boundary, and abort condition
- device_trial_manifest/v1 only when real telemetry, camera capture id, dry-run output, command transcript, operator confirmation, or hardware observation is recorded
Safety rules:
- A physical device readiness card is not device discovery, network pairing, credential validation, slicer output, G-code safety, camera inspection, sensor reading, relay actuation, robot movement, heat command, print start, emergency stop test, or successful hardware trial evidence unless observed device-trial evidence records it.
- Do not claim connector, gateway, runtime, file generation, memory mutation, or host automation evidence from prepared guidance.
Runtime Evidence
Preferred harness for this skill: physical-device-readiness.
omh runtime record --skill physical-device-readiness --harness physical-device-readiness --status started
Record observed delegation results; otherwise return not_available or not_observed.
Prepared OMH routing is not execution, review, CI, merge-readiness, or merge evidence.
- Treat wrapper memory/context summaries as advisory local context, not proof of opaque Hermes memory reads or changes.
Preserve workflow intent and stop conditions; verify before claiming completion.
Use Hermes-native subagent/delegation features when available: native subagents -> Hermes delegation when available, otherwise sequential lanes.
Shared product, compatibility, topology, memory, harness, and execution rules: omh-routing/references/skill-common-rail.md. Load it when applicable; otherwise name an unavailable capability.