Skip to main content

deployment-strategy

Deploy with rollback plans, staged rollouts, and feature flags

Zur Installation springen

Quellinformationen

Repository
vignesh2027/AI-AGENT-SKILLS
Letzte Quellaktivität
13. Mai 2026 um 19:03
Erkannte Sprache von SKILL.md
Englisch
Sterne
1
Forks
0

Installationsoptionen

Standardmäßig ist der Prompt ausgewählt, der zuerst die Quelle prüft. Sie können zu einem direkten Befehl wechseln oder eine lokale Kopie herunterladen.

Quelldateien prüfen

Lesen Sie SKILL.md und alle von SkillsMP angezeigten Begleitdateien, bevor Sie sich für eine Installation entscheiden.

SKILL.md wird angezeigt

SKILL.md
Quellanweisungen · Schreibgeschützte Vorschau
name
deployment-strategy
description
Deploy with rollback plans, staged rollouts, and feature flags
difficulty
senior
domains
["general"]
## Overview Deployments fail. The question is not whether, but whether you can recover quickly. This skill makes deployments reversible, observable, and gradual. ## When to Use - Before every production deployment - When designing a deployment pipeline - When a deployment caused a production incident - As part of the `/ship` workflow ## Process ### Step 1: Write the rollback procedure first Before deploying, document how to roll back. If you can't write the rollback procedure, you're not ready to deploy. ### Step 2: Define the rollout stages 1% → 10% → 50% → 100% for high-risk changes. 10% → 100% for low-risk changes. Never: 0% → 100% for anything that touches user-visible behavior. ### Step 3: Choose a deployment strategy - **Blue/green**: spin up new environment, switch traffic, keep old environment warm for rollback - **Canary**: route a percentage of traffic to new version, measure, expand - **Feature flags**: deploy code dark, flip flag to enable for users - **Rolling**: replace instances one by one, abort if errors spike Choose based on: how reversible is the change? How quickly can you detect problems? ### Step 4: Define the deployment success criteria Before deploying: what metrics must hold for the deployment to be considered successful? - Error rate stays below X% - p99 latency stays below Y ms - No new error types in logs - Key business metric (signups, orders) not regressing ### Step 5: Bake time After deploying to a stage: wait before expanding. Minimum bake time: - 1% stage: 15 minutes - 10% stage: 1 hour - 50% stage: 4 hours High-risk changes need longer bake times. ### Step 6: Database migrations - Migrations must be backward compatible (old code + new schema must work) - Deploy migration before new code; keep old code running - Never delete a column in the same release that stops using it - Test rollback of the migration ### Step 7: Automate the deployment gate Success criteria from Step 4 must be checked automatically. If they fail, the deployment halts. Not: "someone watches the dashboard." Automatic. ### Step 8: Post-deployment monitoring After a deployment: watch the golden signals for 24 hours. Document any anomalies. ## Anti-Rationalizations **"It's a small change — we can deploy to 100%"** "Small" changes cause production incidents. All production changes go through staged rollout. **"We can roll back if there's a problem"** "Can roll back" means the rollback procedure is written, tested, and can be executed in under 5 minutes. Otherwise, you don't have a rollback plan; you have a hope. ## Verification Requirements - [ ] Rollback procedure written before deployment starts - [ ] Deployment stages defined (not 0% → 100%) - [ ] Success criteria defined and automated - [ ] Bake time defined at each stage - [ ] Database migrations are backward compatible - [ ] Post-deployment monitoring planned
Auf GitHub ansehen