Skip to main content

sap-mm

This skill handles SAP MM (Materials Management) including purchase requisitions, purchase orders, goods receipts, invoice verification, inventory management, GR/IR clearing, material master, vendor evaluation, and period-end closing. Use when user mentions MM, purchasing, procurement, MIGO, MIRO, ME21N, ME23N, MB52, MR11, GR/IR, material master, inventory, stock, MRP, info record, outline agreement, MMPV, account determination, OBYC, movement type, physical inventory, batch management, valuation class.

Datos de origen

Repositorio
BoxLogoDev/sapstack
Última actividad en el origen
19 de agosto de 2026 a las 13:23
Idioma detectado de SKILL.md
inglés
Estrellas
20
Forks
6

Opciones de instalación

De forma predeterminada está seleccionado el prompt que primero revisa el origen. Puedes cambiar a un comando directo o descargar una copia local.

Revisa los archivos de origen

Lee SKILL.md y los archivos complementarios que muestra SkillsMP antes de decidir si quieres instalarlo.

Explorador de archivos
16 archivos

Mostrando SKILL.md

SKILL.md
Instrucciones de origen · Vista previa de solo lectura
name
sap-mm
description
This skill handles SAP MM (Materials Management) including purchase requisitions, purchase orders, goods receipts, invoice verification, inventory management, GR/IR clearing, material master, vendor evaluation, and period-end closing. Use when user mentions MM, purchasing, procurement, MIGO, MIRO, ME21N, ME23N, MB52, MR11, GR/IR, material master, inventory, stock, MRP, info record, outline agreement, MMPV, account determination, OBYC, movement type, physical inventory, batch management, valuation class.
allowed-tools
Read, Grep
# SAP Materials Management (MM) Skill ## 0. Environment Intake and Safety Contract Before diagnosing or recommending an MM action, collect: - **Release**: ECC 6.0 EhP or S/4HANA release year - **Deployment**: On-Premise, RISE/Private Cloud, or Public Cloud - **Industry/process**: manufacturing, retail, project procurement, services, or regulated industry - **Scope keys**: user-provided purchasing organization, plant, storage location, PO, and material - **Evidence**: exact message class/number, T-code or Fiori app, timestamp, last normal document - **Control state**: posting period, approval status, GR-based IV flag, and whether QM/batch/serial control applies Never invent company codes, G/L accounts, cost centers, plants, purchasing organizations, or tolerance values. If environment context is missing, ask up to four grouped questions and still provide clearly labelled provisional read-only checks. Configuration changes require a Transport Request (TR), a representative test in DEV/QA, UAT evidence, and a rollback plan. Never edit production tables with `SE16N`. ## 1. Procurement Cycle ``` PR (ME51N) → RFQ (ME41) → Quotation (ME47) → PO (ME21N) → GR (MIGO 101) → IV (MIRO) → Payment (F110) ``` Shortcut flows: - Without RFQ: PR → PO (ME58 — auto-convert PR to PO) - Consignment: PO item cat K → GR → settlement (MRKO) - Subcontracting: PO item cat L → GI components → GR finished --- ## 2. Purchase Order Issues **Account assignment errors** - Category K (cost center): cost center must exist and be active - Category A (asset): asset master must exist, depreciation area active - Category F (internal order): order must be in Released status - Category P (project/WBS): WBS element must be open for costs **Tolerance check (MIRO)** - OMR6 → tolerance keys: BD (amount) / VP (moving avg price variance) / PP (price) - Tolerance = percentage + absolute amount — both must be within limits **GR-based invoice verification** - PO item → Invoice tab → GR-Based IV flag = X - With flag: MIRO only possible after GR; invoice quantity = GR quantity --- ## 3. Goods Receipt (MIGO) ### Key Movement Types | MVT | Description | Notes | |-----|-------------|-------| | 101 | GR for purchase order | Standard GR | | 102 | Reversal of 101 GR | Reference the original GR document | | 122 | Return delivery to vendor | With return PO | | 161 | GR for return PO | For returns with credit | | 201 | GI to cost center | Free goods issue | | 261 | GI for production order | Component consumption | | 301 | Transfer plant to plant (1 step) | Same company code | | 311 | Transfer storage location to storage location | Same plant | | 551 | Scrapping | Write-off to loss account | ### Account Determination (OBYC) - Transaction key BSX: inventory posting (stock G/L account) - Transaction key WRX: GR/IR clearing account - Transaction key PRD: price difference account (standard price) - Transaction key GBB: goods issue / offsetting accounts - Valuation class (material master → Accounting 1) links material to G/L accounts --- ## 4. Invoice Verification (MIRO) **Blocking reasons** | Code | Reason | Release T-code | |------|--------|----------------| | R | Manual block | MR02 / MRBR | | A | Amount exceeds tolerance | MRBR (automatic) | | D | Date issue | MRBR | | Q | Quantity variance | MRBR | | P | Price variance | MRBR | **Parked invoices**: `MIR7`에서 park/complete 상태를 구분하고 `MIR4`에서 문서와 후속 상태를 조회한다. Blocked invoice release는 parked invoice 처리와 섞지 말고 `MRBR`의 blocking reason 기준으로 별도 진단한다. **Credit memos**: MIRO → transaction = Credit Memo → reverses original invoice logic --- ## 5. Inventory Management **Physical inventory process** 1. MI01: create physical inventory document → print count sheet 2. MI04: enter count results (MI09 is a separate count-without-document process) 3. MI07: post inventory differences → generates MM document + FI document 4. MI20: list of inventory differences for review **Key reports** | T-code | Report | |--------|--------| | MMBE | Stock overview (all stock types) | | MB52 | Warehouse stocks of material | | MB53 | Plant stock availability | | MB5B | Stocks for posting date | | MB51 | Material document list | --- ## 6. Material Master Key Views | View | Key Fields | |------|-----------| | MRP 1 | MRP type, MRP controller, lot size procedure | | MRP 2 | Planned delivery time, safety stock | | MRP 3 | Strategy group (make-to-stock vs make-to-order) | | MRP 4 | BOM explosion, individual/collective requirements | | Accounting 1 | Valuation class, price control (S/V), standard/moving avg price | | Purchasing | Purchasing group, info update, GR processing time | | Plant Data/Stor.1 | Storage conditions, shelf life, batch management | Extend to new plant: MM01 → select org levels → plant / storage location --- ## 7. MM Period Close - **MMPV**: close MM posting period — FI 오픈 기간과 인터페이스 cut-off를 대조하고 회사의 승인된 마감 순서에 맞춰 실행 - **MMRV**: allow posting to previous MM period (emergency use only — document reason) - Check open GR/IR before closing: MB5S → identify items needing MR11 --- ## 8. S/4HANA MM Differences | Topic | ECC | S/4HANA | |-------|-----|---------| | Material document persistence | MKPF / MSEG | MATDOC; compatibility access depends on release | | Read model | Classic tables/reports | Released CDS views and Fiori analytics preferred for extensions | | Supplier master | Vendor master transactions and LFA* data | Business Partner with CVI; validate conversion status | | Material Ledger | Optional by valuation area | Mandatory foundation; Actual Costing remains optional | | MRP run | MD01/classic MRP | MD01N MRP Live plus supported classic functions | | Purchase order history | EKBE | EKBE remains relevant; released CDS/API is preferred for clean-core extensions | --- ## 9. Operator Action Map — T-code + Menu Path Every recommendation must pair the executable surface with its menu path. Fiori-only actions must say `T-code: none` rather than inventing a GUI code. | Action | T-code / app | Menu path | |---|---|---| | Display PO and history | `ME23N` | SAP Easy Access > Logistics > Materials Management > Purchasing > Purchase Order > Display | | Change PO after approval | `ME22N` | SAP Easy Access > Logistics > Materials Management > Purchasing > Purchase Order > Change | | List POs by document | `ME2N` | SAP Easy Access > Logistics > Materials Management > Purchasing > Purchase Order > List Displays > By PO Number | | Post or reverse goods movement | `MIGO` | SAP Easy Access > Logistics > Materials Management > Inventory Management > Goods Movement > Goods Movement | | Enter logistics invoice | `MIRO` | SAP Easy Access > Logistics > Materials Management > Logistics Invoice Verification > Document Entry > Enter Invoice | | Display logistics invoice | `MIR4` | SAP Easy Access > Logistics > Materials Management > Logistics Invoice Verification > Further Processing > Display Invoice Document | | Review blocked invoices | `MRBR` | SAP Easy Access > Logistics > Materials Management > Logistics Invoice Verification > Further Processing > Release Blocked Invoices | | Display material master | `MM03` | SAP Easy Access > Logistics > Materials Management > Material Master > Material > Display > Display Current | | Maintain purchasing info record | `ME11` | SAP Easy Access > Logistics > Materials Management > Purchasing > Master Data > Info Record > Create | | Display material documents | `MB51` | SAP Easy Access > Logistics > Materials Management > Inventory Management > Environment > List Displays > Material Documents | | Display stock overview | `MMBE` | SAP Easy Access > Logistics > Materials Management > Inventory Management > Environment > Stock > Stock Overview | | Create physical inventory document | `MI01` | SAP Easy Access > Logistics > Materials Management > Physical Inventory > Physical Inventory Document > Create | | Enter physical count | `MI04` | SAP Easy Access > Logistics > Materials Management > Physical Inventory > Count > Enter | | Review count differences | `MI20` | SAP Easy Access > Logistics > Materials Management > Physical Inventory > Difference > Difference List | | Post count differences | `MI07` | SAP Easy Access > Logistics > Materials Management > Physical Inventory > Difference > Post | | Review GR/IR candidates | `MR11` | SAP Easy Access > Logistics > Materials Management > Logistics Invoice Verification > GR/IR Account Maintenance > Maintain | | Close MM period | `MMPV` | SAP Easy Access > Logistics > Materials Management > Material Master > Other > Close Period | For S/4HANA Cloud Public Edition, verify the released Fiori app and business role in the user's tenant. Classic T-code availability must not be assumed. --- ## 10. PO → GR → IR Evidence Chain Treat the document flow as four independent gates. A green upstream status does not prove that the next gate completed. ```text Gate A: PR/source/master data → Gate B: PO creation and approval → Gate C: GR and material/FI documents → Gate D: IR, three-way match, payment block ``` ### 10.1 Gate A — PR, Source, and Master Data Start with read-only master data checks: 1. `[T-code: ME53N | menu: Logistics > Materials Management > Purchasing > Purchase Requisition > Display]` — confirm requested quantity, delivery date, account assignment, source assignment, and processing status. 2. `[T-code: MM03 | menu: Logistics > Materials Management > Material Master > Material > Display > Display Current]` — confirm base UoM, purchasing/MRP views, plant extension, valuation class, batch and serial controls. 3. `[T-code: ME23N | menu: Logistics > Materials Management > Purchasing > Purchase Order > Display]` — verify which source and master attributes were copied to the created PO. Use the following evidence fields; do not modify them directly: | Object | Table.Field | Diagnostic meaning | |---|---|---| | PR | `EBAN-BANFN`, `EBAN-BNFPO` | PR identity | | PR | `EBAN-MATNR`, `EBAN-WERKS`, `EBAN-MENGE` | Material, plant, requested quantity | | Material | `MARA-MTART`, `MARA-MEINS` | Material type and base UoM | | Plant data | `MARC-WERKS`, `MARC-EKGRP`, `MARC-DISMM` | Plant extension, purchasing group, MRP type | | Valuation | `MBEW-BKLAS`, `MBEW-VPRSV` | Valuation class and price control | | UoM conversion | `MARM-UMREZ`, `MARM-UMREN` | Alternative/base UoM conversion | | Info record | `EINA-MATNR`, `EINA-LIFNR`, `EINE-EKORG` | Supplier-material and purchasing-org segment | | Source list | `EORD-MATNR`, `EORD-WERKS`, `EORD-VDATU`, `EORD-BDATU` | Source validity interval | **Hypothesis A1 — source is invalid for the requested date.** - Supporting evidence: no valid `EORD` interval, or the PO source differs from the approved source. - Falsification: a valid fixed/allowed source covers the requested date and the same source is copied to the PO. - Fix: correct source master data through the approved master-data workflow, then recreate or deliberately update the affected document in DEV/QA first. - Rollback: restore the previous source validity record and document selection using the approved change log; do not delete source records from tables. **Hypothesis A2 — UoM conversion causes an apparent quantity mismatch.** - Supporting evidence: PO order unit differs from `MARA-MEINS`, and `MARM` conversion does not match the supplier pack. - Falsification: order/base quantities reconcile exactly with `MARM-UMREZ/UMREN`. - Fix: correct the governed UoM master or the document order unit after impact review. - Rollback: revert the master/document change and re-run the same quantity comparison. ### 10.2 Gate B — PO Content and Approval At `[T-code: ME23N | menu: Logistics > Materials Management > Purchasing > Purchase Order > Display]`, inspect header, item, schedule line, account assignment, conditions, confirmations, and PO history. | Object | Table.Field | Check | |---|---|---| | Header | `EKKO-BSART`, `EKKO-LIFNR`, `EKKO-EKORG`, `EKKO-BUKRS` | Document type, supplier, org assignments | | Item | `EKPO-MATNR`, `EKPO-WERKS`, `EKPO-MENGE`, `EKPO-NETPR` | Material, plant, quantity, PO price | | Invoice controls | `EKPO-WEBRE`, `EKPO-EREKZ` | GR-based IV and final-invoice indicator | | Delivery control | `EKPO-ELIKZ` | Delivery-completed indicator | | Schedule | `EKET-EINDT`, `EKET-MENGE`, `EKET-WEMNG` | Due date, scheduled and GR quantities | | Classic release | `EKKO-FRGGR`, `EKKO-FRGSX`, `EKKO-FRGKE` | ECC/classic strategy state | #### ECC classic release Use `ME23N` read-only status and release-strategy fields to determine whether the strategy was determined, which release remains, and whether a value/characteristic change reset the status. Do not bypass the strategy by changing classification or document value in production. #### S/4HANA flexible workflow Use `[T-code: none | menu: Fiori Launchpad > My Inbox]` for the approver work item and `[T-code: none | menu: Fiori Launchpad > Manage Workflows for Purchase Orders]` for workflow definition. Compare start-condition evaluation, recipient determination, work-item status, and document status. Workflow configuration changes require a governed transport and test workflow with a non-production PO. **Hypothesis B1 — PO is blocked by approval, not by GR processing.** - Supporting evidence: `ME23N` shows incomplete release or My Inbox has an open/failed work item. - Falsification: the PO is fully released and no active workflow item remains. - Fix: correct agent/recipient or release configuration in DEV, transport to QA, test approve/reject paths, and then let the authorized approver decide the production work item. - Rollback: restore the prior workflow/rule version and verify that new test POs route as before. **Hypothesis B2 — delivery or final-invoice completion was set prematurely.** - Supporting evidence: `EKPO-ELIKZ` or `EKPO-EREKZ` is set while open business quantity remains. - Falsification: completion indicators are blank or justified and PO history fully reconciles. - Fix: have the document owner correct the indicator through `ME22N` after PO-history review. - Rollback: restore the captured original indicator and revalidate open quantity; never change `EKPO` directly. ### 10.3 Gate C — MIGO Goods Receipt Before posting, use the check function in `[T-code: MIGO | menu: Logistics > Materials Management > Inventory Management > Goods Movement > Goods Movement]`. Validate reference document, movement type, posting/document dates, quantity/UoM, plant/storage location, stock type, batch/serial, and item OK status. Evidence sequence: 1. `ME23N` PO History — identify the exact GR and any reversal. 2. `MB51` — compare material document number, year, movement type, quantity, posting date, and user. 3. `MMBE` or `MB52` — confirm current stock category and location after posting. 4. FI document display, when generated, must be reviewed with the FI consultant; MM document success alone does not prove correct account determination. #### ECC evidence - Header: `MKPF-MBLNR`, `MKPF-MJAHR`, `MKPF-BUDAT`, `MKPF-CPUDT` - Item: `MSEG-MATNR`, `MSEG-WERKS`, `MSEG-LGORT`, `MSEG-BWART`, `MSEG-MENGE` #### S/4HANA evidence - Primary persistence: `MATDOC-MBLNR`, `MATDOC-MJAHR`, `MATDOC-MATNR`, `MATDOC-WERKS`, `MATDOC-LGORT`, `MATDOC-BWART`, `MATDOC-MENGE`, `MATDOC-BUDAT_MKPF` - Use released CDS/API surfaces for custom extensions; do not build a new direct-update process on `MATDOC`. **Hypothesis C1 — no eligible open PO quantity exists.** - Supporting evidence: schedule/PO history shows full GR, reversal chain changes the net quantity, or `EKPO-ELIKZ` is set. - Falsification: open PO quantity is positive, the item is released, and no completion block applies. - Fix: correct the business document or reference the correct PO item; do not post an unreferenced GR to mask it. - Rollback: reverse only the identified incorrect material document via `MIGO` with reference after warehouse/FI approval. **Hypothesis C2 — account determination blocks posting.** - Supporting evidence: message identifies transaction key/valuation class and `MBEW-BKLAS` has no matching governed `OBYC` entry. - Falsification: valuation class and all required transaction-key mappings exist for the valuation area. - Fix: `[T-code: OBYC | menu: SPRO > Materials Management > Valuation and Account Assignment > Account Determination > Configure Automatic Postings]`; configure in DEV, attach TR, test `MIGO` Check, and validate the generated FI document in QA. - Rollback: transport the captured previous mapping back through the landscape and repeat the posting simulation. **Hypothesis C3 — technical update or authorization failed after user input.** - Check `[T-code: SM13 | menu: SAP Easy Access > Tools > Administration > Monitor > Update]` for update failure. - Check `[T-code: ST22 | menu: SAP Easy Access > Tools > ABAP Workbench > Test > Dump Analysis]` for a dump. - Check `[T-code: SU53 | menu: SAP GUI > System > Utilities > Display Authorization Check]` immediately after an authorization error. - Falsification: no matching update record/dump exists and the failed authorization object is not reproduced. - Fix/Rollback: delegate code defects to ABAP/BASIS and role changes to security; test the narrowest correction in QA and retain the prior transport/version for rollback. ### 10.4 Gate D — MIRO Invoice and Three-Way Match At `[T-code: MIRO | menu: Logistics > Materials Management > Logistics Invoice Verification > Document Entry > Enter Invoice]`, use Simulate before Post. Compare PO price/quantity, eligible GR,
Ver en GitHub
Este SKILL.md es muy grande, por eso SkillsMP muestra aqui solo la primera seccion. Ver en GitHub