Skip to main content

sap-mm

This skill handles SAP MM (Materials Management) including purchase requisitions, purchase orders, goods receipts, invoice verification, inventory management, GR/IR clearing, material master, vendor evaluation, and period-end closing. Use when user mentions MM, purchasing, procurement, MIGO, MIRO, ME21N, ME23N, MB52, MR11, GR/IR, material master, inventory, stock, MRP, info record, outline agreement, MMPV, account determination, OBYC, movement type, physical inventory, batch management, valuation class.

소스 정보

저장소
BoxLogoDev/sapstack
최근 소스 활동
2026년 8월 19일 13:23
감지된 SKILL.md 언어
영어
스타
20
포크
6

설치 방법

기본적으로 소스를 먼저 확인하는 Prompt가 선택됩니다. 직접 명령으로 전환하거나 로컬 사본을 다운로드할 수도 있습니다.

소스 파일 검토

설치 여부를 결정하기 전에 SKILL.md와 SkillsMP에 표시된 보조 파일을 읽어 보세요.

파일 탐색기
16 개 파일

SKILL.md 표시 중

SKILL.md
소스 지침 · 읽기 전용 미리보기
name
sap-mm
description
This skill handles SAP MM (Materials Management) including purchase requisitions, purchase orders, goods receipts, invoice verification, inventory management, GR/IR clearing, material master, vendor evaluation, and period-end closing. Use when user mentions MM, purchasing, procurement, MIGO, MIRO, ME21N, ME23N, MB52, MR11, GR/IR, material master, inventory, stock, MRP, info record, outline agreement, MMPV, account determination, OBYC, movement type, physical inventory, batch management, valuation class.
allowed-tools
Read, Grep
# SAP Materials Management (MM) Skill ## 0. Environment Intake and Safety Contract Before diagnosing or recommending an MM action, collect: - **Release**: ECC 6.0 EhP or S/4HANA release year - **Deployment**: On-Premise, RISE/Private Cloud, or Public Cloud - **Industry/process**: manufacturing, retail, project procurement, services, or regulated industry - **Scope keys**: user-provided purchasing organization, plant, storage location, PO, and material - **Evidence**: exact message class/number, T-code or Fiori app, timestamp, last normal document - **Control state**: posting period, approval status, GR-based IV flag, and whether QM/batch/serial control applies Never invent company codes, G/L accounts, cost centers, plants, purchasing organizations, or tolerance values. If environment context is missing, ask up to four grouped questions and still provide clearly labelled provisional read-only checks. Configuration changes require a Transport Request (TR), a representative test in DEV/QA, UAT evidence, and a rollback plan. Never edit production tables with `SE16N`. ## 1. Procurement Cycle ``` PR (ME51N) → RFQ (ME41) → Quotation (ME47) → PO (ME21N) → GR (MIGO 101) → IV (MIRO) → Payment (F110) ``` Shortcut flows: - Without RFQ: PR → PO (ME58 — auto-convert PR to PO) - Consignment: PO item cat K → GR → settlement (MRKO) - Subcontracting: PO item cat L → GI components → GR finished --- ## 2. Purchase Order Issues **Account assignment errors** - Category K (cost center): cost center must exist and be active - Category A (asset): asset master must exist, depreciation area active - Category F (internal order): order must be in Released status - Category P (project/WBS): WBS element must be open for costs **Tolerance check (MIRO)** - OMR6 → tolerance keys: BD (amount) / VP (moving avg price variance) / PP (price) - Tolerance = percentage + absolute amount — both must be within limits **GR-based invoice verification** - PO item → Invoice tab → GR-Based IV flag = X - With flag: MIRO only possible after GR; invoice quantity = GR quantity --- ## 3. Goods Receipt (MIGO) ### Key Movement Types | MVT | Description | Notes | |-----|-------------|-------| | 101 | GR for purchase order | Standard GR | | 102 | Reversal of 101 GR | Reference the original GR document | | 122 | Return delivery to vendor | With return PO | | 161 | GR for return PO | For returns with credit | | 201 | GI to cost center | Free goods issue | | 261 | GI for production order | Component consumption | | 301 | Transfer plant to plant (1 step) | Same company code | | 311 | Transfer storage location to storage location | Same plant | | 551 | Scrapping | Write-off to loss account | ### Account Determination (OBYC) - Transaction key BSX: inventory posting (stock G/L account) - Transaction key WRX: GR/IR clearing account - Transaction key PRD: price difference account (standard price) - Transaction key GBB: goods issue / offsetting accounts - Valuation class (material master → Accounting 1) links material to G/L accounts --- ## 4. Invoice Verification (MIRO) **Blocking reasons** | Code | Reason | Release T-code | |------|--------|----------------| | R | Manual block | MR02 / MRBR | | A | Amount exceeds tolerance | MRBR (automatic) | | D | Date issue | MRBR | | Q | Quantity variance | MRBR | | P | Price variance | MRBR | **Parked invoices**: `MIR7`에서 park/complete 상태를 구분하고 `MIR4`에서 문서와 후속 상태를 조회한다. Blocked invoice release는 parked invoice 처리와 섞지 말고 `MRBR`의 blocking reason 기준으로 별도 진단한다. **Credit memos**: MIRO → transaction = Credit Memo → reverses original invoice logic --- ## 5. Inventory Management **Physical inventory process** 1. MI01: create physical inventory document → print count sheet 2. MI04: enter count results (MI09 is a separate count-without-document process) 3. MI07: post inventory differences → generates MM document + FI document 4. MI20: list of inventory differences for review **Key reports** | T-code | Report | |--------|--------| | MMBE | Stock overview (all stock types) | | MB52 | Warehouse stocks of material | | MB53 | Plant stock availability | | MB5B | Stocks for posting date | | MB51 | Material document list | --- ## 6. Material Master Key Views | View | Key Fields | |------|-----------| | MRP 1 | MRP type, MRP controller, lot size procedure | | MRP 2 | Planned delivery time, safety stock | | MRP 3 | Strategy group (make-to-stock vs make-to-order) | | MRP 4 | BOM explosion, individual/collective requirements | | Accounting 1 | Valuation class, price control (S/V), standard/moving avg price | | Purchasing | Purchasing group, info update, GR processing time | | Plant Data/Stor.1 | Storage conditions, shelf life, batch management | Extend to new plant: MM01 → select org levels → plant / storage location --- ## 7. MM Period Close - **MMPV**: close MM posting period — FI 오픈 기간과 인터페이스 cut-off를 대조하고 회사의 승인된 마감 순서에 맞춰 실행 - **MMRV**: allow posting to previous MM period (emergency use only — document reason) - Check open GR/IR before closing: MB5S → identify items needing MR11 --- ## 8. S/4HANA MM Differences | Topic | ECC | S/4HANA | |-------|-----|---------| | Material document persistence | MKPF / MSEG | MATDOC; compatibility access depends on release | | Read model | Classic tables/reports | Released CDS views and Fiori analytics preferred for extensions | | Supplier master | Vendor master transactions and LFA* data | Business Partner with CVI; validate conversion status | | Material Ledger | Optional by valuation area | Mandatory foundation; Actual Costing remains optional | | MRP run | MD01/classic MRP | MD01N MRP Live plus supported classic functions | | Purchase order history | EKBE | EKBE remains relevant; released CDS/API is preferred for clean-core extensions | --- ## 9. Operator Action Map — T-code + Menu Path Every recommendation must pair the executable surface with its menu path. Fiori-only actions must say `T-code: none` rather than inventing a GUI code. | Action | T-code / app | Menu path | |---|---|---| | Display PO and history | `ME23N` | SAP Easy Access > Logistics > Materials Management > Purchasing > Purchase Order > Display | | Change PO after approval | `ME22N` | SAP Easy Access > Logistics > Materials Management > Purchasing > Purchase Order > Change | | List POs by document | `ME2N` | SAP Easy Access > Logistics > Materials Management > Purchasing > Purchase Order > List Displays > By PO Number | | Post or reverse goods movement | `MIGO` | SAP Easy Access > Logistics > Materials Management > Inventory Management > Goods Movement > Goods Movement | | Enter logistics invoice | `MIRO` | SAP Easy Access > Logistics > Materials Management > Logistics Invoice Verification > Document Entry > Enter Invoice | | Display logistics invoice | `MIR4` | SAP Easy Access > Logistics > Materials Management > Logistics Invoice Verification > Further Processing > Display Invoice Document | | Review blocked invoices | `MRBR` | SAP Easy Access > Logistics > Materials Management > Logistics Invoice Verification > Further Processing > Release Blocked Invoices | | Display material master | `MM03` | SAP Easy Access > Logistics > Materials Management > Material Master > Material > Display > Display Current | | Maintain purchasing info record | `ME11` | SAP Easy Access > Logistics > Materials Management > Purchasing > Master Data > Info Record > Create | | Display material documents | `MB51` | SAP Easy Access > Logistics > Materials Management > Inventory Management > Environment > List Displays > Material Documents | | Display stock overview | `MMBE` | SAP Easy Access > Logistics > Materials Management > Inventory Management > Environment > Stock > Stock Overview | | Create physical inventory document | `MI01` | SAP Easy Access > Logistics > Materials Management > Physical Inventory > Physical Inventory Document > Create | | Enter physical count | `MI04` | SAP Easy Access > Logistics > Materials Management > Physical Inventory > Count > Enter | | Review count differences | `MI20` | SAP Easy Access > Logistics > Materials Management > Physical Inventory > Difference > Difference List | | Post count differences | `MI07` | SAP Easy Access > Logistics > Materials Management > Physical Inventory > Difference > Post | | Review GR/IR candidates | `MR11` | SAP Easy Access > Logistics > Materials Management > Logistics Invoice Verification > GR/IR Account Maintenance > Maintain | | Close MM period | `MMPV` | SAP Easy Access > Logistics > Materials Management > Material Master > Other > Close Period | For S/4HANA Cloud Public Edition, verify the released Fiori app and business role in the user's tenant. Classic T-code availability must not be assumed. --- ## 10. PO → GR → IR Evidence Chain Treat the document flow as four independent gates. A green upstream status does not prove that the next gate completed. ```text Gate A: PR/source/master data → Gate B: PO creation and approval → Gate C: GR and material/FI documents → Gate D: IR, three-way match, payment block ``` ### 10.1 Gate A — PR, Source, and Master Data Start with read-only master data checks: 1. `[T-code: ME53N | menu: Logistics > Materials Management > Purchasing > Purchase Requisition > Display]` — confirm requested quantity, delivery date, account assignment, source assignment, and processing status. 2. `[T-code: MM03 | menu: Logistics > Materials Management > Material Master > Material > Display > Display Current]` — confirm base UoM, purchasing/MRP views, plant extension, valuation class, batch and serial controls. 3. `[T-code: ME23N | menu: Logistics > Materials Management > Purchasing > Purchase Order > Display]` — verify which source and master attributes were copied to the created PO. Use the following evidence fields; do not modify them directly: | Object | Table.Field | Diagnostic meaning | |---|---|---| | PR | `EBAN-BANFN`, `EBAN-BNFPO` | PR identity | | PR | `EBAN-MATNR`, `EBAN-WERKS`, `EBAN-MENGE` | Material, plant, requested quantity | | Material | `MARA-MTART`, `MARA-MEINS` | Material type and base UoM | | Plant data | `MARC-WERKS`, `MARC-EKGRP`, `MARC-DISMM` | Plant extension, purchasing group, MRP type | | Valuation | `MBEW-BKLAS`, `MBEW-VPRSV` | Valuation class and price control | | UoM conversion | `MARM-UMREZ`, `MARM-UMREN` | Alternative/base UoM conversion | | Info record | `EINA-MATNR`, `EINA-LIFNR`, `EINE-EKORG` | Supplier-material and purchasing-org segment | | Source list | `EORD-MATNR`, `EORD-WERKS`, `EORD-VDATU`, `EORD-BDATU` | Source validity interval | **Hypothesis A1 — source is invalid for the requested date.** - Supporting evidence: no valid `EORD` interval, or the PO source differs from the approved source. - Falsification: a valid fixed/allowed source covers the requested date and the same source is copied to the PO. - Fix: correct source master data through the approved master-data workflow, then recreate or deliberately update the affected document in DEV/QA first. - Rollback: restore the previous source validity record and document selection using the approved change log; do not delete source records from tables. **Hypothesis A2 — UoM conversion causes an apparent quantity mismatch.** - Supporting evidence: PO order unit differs from `MARA-MEINS`, and `MARM` conversion does not match the supplier pack. - Falsification: order/base quantities reconcile exactly with `MARM-UMREZ/UMREN`. - Fix: correct the governed UoM master or the document order unit after impact review. - Rollback: revert the master/document change and re-run the same quantity comparison. ### 10.2 Gate B — PO Content and Approval At `[T-code: ME23N | menu: Logistics > Materials Management > Purchasing > Purchase Order > Display]`, inspect header, item, schedule line, account assignment, conditions, confirmations, and PO history. | Object | Table.Field | Check | |---|---|---| | Header | `EKKO-BSART`, `EKKO-LIFNR`, `EKKO-EKORG`, `EKKO-BUKRS` | Document type, supplier, org assignments | | Item | `EKPO-MATNR`, `EKPO-WERKS`, `EKPO-MENGE`, `EKPO-NETPR` | Material, plant, quantity, PO price | | Invoice controls | `EKPO-WEBRE`, `EKPO-EREKZ` | GR-based IV and final-invoice indicator | | Delivery control | `EKPO-ELIKZ` | Delivery-completed indicator | | Schedule | `EKET-EINDT`, `EKET-MENGE`, `EKET-WEMNG` | Due date, scheduled and GR quantities | | Classic release | `EKKO-FRGGR`, `EKKO-FRGSX`, `EKKO-FRGKE` | ECC/classic strategy state | #### ECC classic release Use `ME23N` read-only status and release-strategy fields to determine whether the strategy was determined, which release remains, and whether a value/characteristic change reset the status. Do not bypass the strategy by changing classification or document value in production. #### S/4HANA flexible workflow Use `[T-code: none | menu: Fiori Launchpad > My Inbox]` for the approver work item and `[T-code: none | menu: Fiori Launchpad > Manage Workflows for Purchase Orders]` for workflow definition. Compare start-condition evaluation, recipient determination, work-item status, and document status. Workflow configuration changes require a governed transport and test workflow with a non-production PO. **Hypothesis B1 — PO is blocked by approval, not by GR processing.** - Supporting evidence: `ME23N` shows incomplete release or My Inbox has an open/failed work item. - Falsification: the PO is fully released and no active workflow item remains. - Fix: correct agent/recipient or release configuration in DEV, transport to QA, test approve/reject paths, and then let the authorized approver decide the production work item. - Rollback: restore the prior workflow/rule version and verify that new test POs route as before. **Hypothesis B2 — delivery or final-invoice completion was set prematurely.** - Supporting evidence: `EKPO-ELIKZ` or `EKPO-EREKZ` is set while open business quantity remains. - Falsification: completion indicators are blank or justified and PO history fully reconciles. - Fix: have the document owner correct the indicator through `ME22N` after PO-history review. - Rollback: restore the captured original indicator and revalidate open quantity; never change `EKPO` directly. ### 10.3 Gate C — MIGO Goods Receipt Before posting, use the check function in `[T-code: MIGO | menu: Logistics > Materials Management > Inventory Management > Goods Movement > Goods Movement]`. Validate reference document, movement type, posting/document dates, quantity/UoM, plant/storage location, stock type, batch/serial, and item OK status. Evidence sequence: 1. `ME23N` PO History — identify the exact GR and any reversal. 2. `MB51` — compare material document number, year, movement type, quantity, posting date, and user. 3. `MMBE` or `MB52` — confirm current stock category and location after posting. 4. FI document display, when generated, must be reviewed with the FI consultant; MM document success alone does not prove correct account determination. #### ECC evidence - Header: `MKPF-MBLNR`, `MKPF-MJAHR`, `MKPF-BUDAT`, `MKPF-CPUDT` - Item: `MSEG-MATNR`, `MSEG-WERKS`, `MSEG-LGORT`, `MSEG-BWART`, `MSEG-MENGE` #### S/4HANA evidence - Primary persistence: `MATDOC-MBLNR`, `MATDOC-MJAHR`, `MATDOC-MATNR`, `MATDOC-WERKS`, `MATDOC-LGORT`, `MATDOC-BWART`, `MATDOC-MENGE`, `MATDOC-BUDAT_MKPF` - Use released CDS/API surfaces for custom extensions; do not build a new direct-update process on `MATDOC`. **Hypothesis C1 — no eligible open PO quantity exists.** - Supporting evidence: schedule/PO history shows full GR, reversal chain changes the net quantity, or `EKPO-ELIKZ` is set. - Falsification: open PO quantity is positive, the item is released, and no completion block applies. - Fix: correct the business document or reference the correct PO item; do not post an unreferenced GR to mask it. - Rollback: reverse only the identified incorrect material document via `MIGO` with reference after warehouse/FI approval. **Hypothesis C2 — account determination blocks posting.** - Supporting evidence: message identifies transaction key/valuation class and `MBEW-BKLAS` has no matching governed `OBYC` entry. - Falsification: valuation class and all required transaction-key mappings exist for the valuation area. - Fix: `[T-code: OBYC | menu: SPRO > Materials Management > Valuation and Account Assignment > Account Determination > Configure Automatic Postings]`; configure in DEV, attach TR, test `MIGO` Check, and validate the generated FI document in QA. - Rollback: transport the captured previous mapping back through the landscape and repeat the posting simulation. **Hypothesis C3 — technical update or authorization failed after user input.** - Check `[T-code: SM13 | menu: SAP Easy Access > Tools > Administration > Monitor > Update]` for update failure. - Check `[T-code: ST22 | menu: SAP Easy Access > Tools > ABAP Workbench > Test > Dump Analysis]` for a dump. - Check `[T-code: SU53 | menu: SAP GUI > System > Utilities > Display Authorization Check]` immediately after an authorization error. - Falsification: no matching update record/dump exists and the failed authorization object is not reproduced. - Fix/Rollback: delegate code defects to ABAP/BASIS and role changes to security; test the narrowest correction in QA and retain the prior transport/version for rollback. ### 10.4 Gate D — MIRO Invoice and Three-Way Match At `[T-code: MIRO | menu: Logistics > Materials Management > Logistics Invoice Verification > Document Entry > Enter Invoice]`, use Simulate before Post. Compare PO price/quantity, eligible GR,
GitHub에서 보기
이 SKILL.md는 매우 커서 SkillsMP가 여기에는 첫 섹션만 미리 보여줍니다. GitHub에서 보기