Skip to main content

division-05-metals-bid-scope

Whole-division starter rules for CSI Division 05 - Metals. Use when starting, triaging, validating, or packaging a commercial metals bid.

Informations de source

Dépôt
ContractorKeith/contractor-bid
Dernière activité de la source
1 juillet 2026 à 22:41
Langue détectée de SKILL.md
anglais
Étoiles
5
Forks
1

Options d'installation

Le prompt qui vérifie d'abord la source est sélectionné par défaut. Vous pouvez passer à une commande directe ou télécharger une copie locale.

Vérifiez les fichiers source

Lisez SKILL.md et les fichiers associés affichés par SkillsMP avant de décider de l'installer.

Affichage de SKILL.md

SKILL.md
Instructions source · Aperçu en lecture seule
name
division-05-metals-bid-scope
description
Whole-division starter rules for CSI Division 05 - Metals. Use when starting, triaging, validating, or packaging a commercial metals bid.
# Division 05 - Metals Bid Scope Company: Your Company CSI division(s): 05 Spec section hints: 05 00 00, 05 05 00, 05 12 00, 05 21 00, 05 31 00, 05 40 00, 05 50 00, 05 70 00 ## Scope Rule Base bid is limited to CSI Division 05 - Metals work specifically assigned to the bidder: structural steel, joists, metal deck, cold-formed metal framing, metal fabrications, stairs, railings, and ornamental metals. Concrete, fireproofing, painting, doors/hardware, and delegated engineering must be explicitly included, excluded, or flagged before pricing. ## Base Scope - structural steel framing when assigned - steel joists and metal deck when assigned - cold-formed metal framing when assigned - metal fabrications - metal stairs and ladders - handrails and guardrails - ornamental metals when assigned ## Terms That Usually Identify This Scope - metals - structural steel - steel joist - metal deck - cold-formed - fabrication - stair - railing - 05 00 ## Adjacent Scope To Exclude By Default - concrete - fireproofing - painting - door hardware - glazing ## Adjacent Scope To Flag Before Pricing - shop drawings - delegated design - embed - anchor bolt - galvanizing ## Bid Package Workflow 1. Put source PDFs, spreadsheets, and addenda in `bid-docs/`. 2. Run `contractor-bid triage <project> --profile division-05-metals`. 3. Review `bid-package-working/takeoff/candidate-pages.md` (candidate pages plus scope signals). 4. Fill `takeoff/scope-pages-sources.json`, then run `contractor-bid build-packets <project>`. 5. Fill the takeoff JSON, then run `contractor-bid build-workbook <project>`. 6. Run `contractor-bid check <project> --profile division-05-metals` before sending anything out. 7. Record user corrections with `contractor-bid learn` and update this skill/profile when the correction should become a durable rule. ## Guardrail Do not silently price excluded or flagged adjacent scopes. Carry the scope boundary through the summary, workbook, proposal letter, alerts, and sendoff package.
Voir sur GitHub