| name | division-03-concrete-bid-scope |
| description | Whole-division starter rules for CSI Division 03 - Concrete. Use when starting, triaging, validating, or packaging a commercial concrete bid. |
Division 03 - Concrete Bid Scope
Company: Your Company
CSI division(s): 03
Spec section hints: 03 00 00, 03 10 00, 03 20 00, 03 30 00, 03 35 00, 03 40 00, 03 60 00
Scope Rule
Base bid is limited to CSI Division 03 - Concrete work specifically assigned to the bidder: forming, reinforcing, cast-in-place, precast, finishes, and concrete repair. Earthwork, asphalt paving, utilities, landscaping, structural steel, waterproofing, and delegated design must be explicitly included, excluded, or flagged before pricing.
Base Scope
- concrete formwork
- reinforcing steel and accessories
- cast-in-place concrete
- concrete slabs and pads
- concrete finishing and curing
- precast concrete when assigned
- concrete repair and patching when assigned
Terms That Usually Identify This Scope
- concrete
- cast-in-place
- precast
- rebar
- reinforcing
- formwork
- slab
- footing
- curb
- 03 00
Adjacent Scope To Exclude By Default
- asphalt
- striping
- landscaping
- irrigation
- site utility
Adjacent Scope To Flag Before Pricing
- sawcut
- demolition
- excavation
- vapor barrier
- waterproofing
Bid Package Workflow
- Put source PDFs, spreadsheets, and addenda in
bid-docs/.
- Run
contractor-bid triage <project> --profile division-03-concrete.
- Review
bid-package-working/takeoff/candidate-pages.md (candidate pages plus scope signals).
- Fill
takeoff/scope-pages-sources.json, then run contractor-bid build-packets <project>.
- Fill the takeoff JSON, then run
contractor-bid build-workbook <project>.
- Run
contractor-bid check <project> --profile division-03-concrete before sending anything out.
- Record user corrections with
contractor-bid learn and update this skill/profile when the correction should become a durable rule.
Guardrail
Do not silently price excluded or flagged adjacent scopes. Carry the scope boundary through the summary, workbook, proposal letter, alerts, and sendoff package.