ワンクリックで
plumbing-bid-scope
Bid-project scope rules for plumbing. Use when starting, triaging, validating, or packaging a commercial plumbing bid.
Codex または Claude でインストール この Prompt をコピーして Codex、Claude、または他のアシスタントに貼り付けると、Skill ページを確認してインストールできます。
メニュー
Bid-project scope rules for plumbing. Use when starting, triaging, validating, or packaging a commercial plumbing bid.
Codex または Claude でインストール この Prompt をコピーして Codex、Claude、または他のアシスタントに貼り付けると、Skill ページを確認してインストールできます。
SOC 職業分類に基づく
Bid-project scope rules for concrete flatwork. Use when starting, triaging, validating, or packaging a commercial concrete flatwork bid.
Whole-division starter rules for CSI Division 03 - Concrete. Use when starting, triaging, validating, or packaging a commercial concrete bid.
Whole-division starter rules for CSI Division 04 - Masonry. Use when starting, triaging, validating, or packaging a commercial masonry bid.
Whole-division starter rules for CSI Division 05 - Metals. Use when starting, triaging, validating, or packaging a commercial metals bid.
Whole-division starter rules for CSI Division 06 - Wood, Plastics, and Composites. Use when starting, triaging, validating, or packaging a commercial carpentry or millwork bid.
Whole-division starter rules for CSI Division 07 - Thermal and Moisture Protection. Use when starting, triaging, validating, or packaging a commercial roofing, waterproofing, insulation, firestopping, or sealants bid.
| name | plumbing-bid-scope |
| description | Bid-project scope rules for plumbing. Use when starting, triaging, validating, or packaging a commercial plumbing bid. |
Company: Your Company CSI division(s): 22 Spec section hints: 22 05 00, 22 11 16, 22 13 16, 22 40 00
Base bid is limited to plumbing systems defined by the profile: sanitary waste and vent, domestic water, interior storm leaders, fixtures, and water heaters. Site utilities beyond 5 ft of the building, fire protection, gas piping, and equipment connections must be explicitly included, excluded, or flagged before pricing.
bid-docs/.contractor-bid triage <project> --profile plumbing.bid-package-working/takeoff/candidate-pages.md (candidate pages plus scope signals).takeoff/scope-pages-sources.json, then run contractor-bid build-packets <project>.contractor-bid build-workbook <project>.contractor-bid check <project> --profile plumbing before sending anything out.contractor-bid learn and update this skill/profile when the correction should become a durable rule.Do not silently price excluded or flagged adjacent scopes. Carry the scope boundary through the summary, workbook, proposal letter, alerts, and sendoff package.