Skip to main content

plumbing-bid-scope

Bid-project scope rules for plumbing. Use when starting, triaging, validating, or packaging a commercial plumbing bid.

跳到安装

来源信息

仓库
ContractorKeith/contractor-bid
最近来源活动
2026年7月1日 22:41
检测到的 SKILL.md 语言
英语
星标
5
分支
1

安装方式

默认使用会先检查来源的 Prompt;你也可以切换为直接命令,或下载本地副本。

检查来源文件

决定是否安装前,请先阅读 SKILL.md,以及 SkillsMP 当前展示的配套文件。

正在显示 SKILL.md

SKILL.md
来源说明 · 只读预览
name
plumbing-bid-scope
description
Bid-project scope rules for plumbing. Use when starting, triaging, validating, or packaging a commercial plumbing bid.
# Plumbing Bid Scope Company: Your Company CSI division(s): 22 Spec section hints: 22 05 00, 22 11 16, 22 13 16, 22 40 00 ## Scope Rule Base bid is limited to plumbing systems defined by the profile: sanitary waste and vent, domestic water, interior storm leaders, fixtures, and water heaters. Site utilities beyond 5 ft of the building, fire protection, gas piping, and equipment connections must be explicitly included, excluded, or flagged before pricing. ## Base Scope - sanitary waste and vent - domestic water piping - plumbing fixtures - water heaters - floor drains - cleanouts - interior storm leaders - trap primers ## Terms That Usually Identify This Scope - plumbing - sanitary - waste and vent - domestic water - fixture - water heater - floor drain - 22 11 - 22 13 ## Adjacent Scope To Exclude By Default - fire sprinkler - fire protection - process piping - hvac piping - owner furnished ## Adjacent Scope To Flag Before Pricing - gas piping - medical gas - grease interceptor - backflow - water meter - site utility - storm drainage ## Bid Package Workflow 1. Put source PDFs, spreadsheets, and addenda in `bid-docs/`. 2. Run `contractor-bid triage <project> --profile plumbing`. 3. Review `bid-package-working/takeoff/candidate-pages.md` (candidate pages plus scope signals). 4. Fill `takeoff/scope-pages-sources.json`, then run `contractor-bid build-packets <project>`. 5. Fill the takeoff JSON, then run `contractor-bid build-workbook <project>`. 6. Run `contractor-bid check <project> --profile plumbing` before sending anything out. 7. Record user corrections with `contractor-bid learn` and update this skill/profile when the correction should become a durable rule. ## Guardrail Do not silently price excluded or flagged adjacent scopes. Carry the scope boundary through the summary, workbook, proposal letter, alerts, and sendoff package.
在 GitHub 查看