Automated cost estimation from BIM models using DDC CWICR database (8 national bases, 78,228 positions). AI classification + vector search for accurate pricing.
原文の言語: 英語
メニュー
SkillsMP は datadrivenconstruction/DDC_Skills_for_AI_Agents_in_Construction から 238 件の skill を収集しています。skill を開くとソースと詳細を確認できます。
収集済み skill 238 件中 40 件を表示しています。
Automated cost estimation from BIM models using DDC CWICR database (8 national bases, 78,228 positions). AI classification + vector search for accurate pricing.
原文の言語: 英語
Build cost assemblies from CWICR work items. Combine multiple items into reusable templates for common construction elements.
原文の言語: 英語
Analyze contractor bids against CWICR benchmarks. Identify pricing anomalies, compare bid components, and support bid evaluation decisions.
原文の言語: 英語
Process construction change orders using CWICR data. Calculate cost impact, compare to original estimate, and generate change order documentation.
原文の言語: 英語
Calculate construction costs using DDC CWICR resource-based methodology. Break down costs into labor, materials, equipment with transparent pricing.
原文の言語: 英語
Optimize crew composition using CWICR labor norms. Balance productivity, cost, and skill requirements for construction crews.
原文の言語: 英語
Load and parse DDC CWICR construction cost database from multiple formats: Parquet, Excel, CSV, Qdrant snapshots. Foundation for all CWICR operations.
原文の言語: 英語
Validate CWICR data quality and estimate inputs. Check for errors, inconsistencies, outliers, and missing data.
原文の言語: 英語
Plan equipment requirements using CWICR norms. Calculate equipment hours, scheduling, utilization rates, and rental vs purchase analysis.
原文の言語: 英語
Apply price escalation to CWICR estimates over time. Calculate inflation adjustments, material price indices, and labor rate increases.
原文の言語: 英語
Track and analyze historical cost data using CWICR. Compare actual vs estimated costs, build project cost database, and improve future estimates.
原文の言語: 英語
Schedule labor crews based on CWICR norms and project timeline. Calculate crew sizes, shifts, and labor loading curves.
原文の言語: 英語
Apply geographic location factors to CWICR estimates. Adjust costs for regional labor rates, material prices, and market conditions.
原文の言語: 英語
Generate material procurement lists from CWICR data. Calculate quantities with waste factors, group by supplier categories, and create purchase orders.
原文の言語: 英語
Find substitute materials using CWICR data. Identify equivalent alternatives based on function, cost, and availability.
原文の言語: 英語
Work with CWICR database across 26 languages. Cross-language matching, translation, and regional pricing.
原文の言語: 英語
Apply overhead, profit, and markup to CWICR estimates. Calculate indirect costs, general conditions, and contractor margins.
原文の言語: 英語
Track actual vs planned productivity using CWICR norms. Calculate productivity rates, identify variances, and generate performance reports.
原文の言語: 英語
Match BIM quantities to CWICR work items. Map element categories to cost codes, validate quantities, and generate cost-linked QTOs.
原文の言語: 英語
Update CWICR resource rates with current market prices. Integrate external price data, apply inflation adjustments, and maintain rate history.
原文の言語: 英語
Analyze construction resources (labor, materials, equipment) from DDC CWICR database. Calculate resource requirements, productivity metrics, and optimization recommendations.
原文の言語: 英語
Calculate risk-adjusted cost estimates using CWICR data. Apply contingencies, Monte Carlo simulation, and probability distributions to cost estimates.
原文の言語: 英語
Integrate CWICR cost data with project schedules. Link work items to schedule activities, generate cost-loaded schedules, and cash flow projections.
原文の言語: 英語
Analyze and compare subcontractor bids against CWICR benchmarks. Evaluate pricing, identify outliers, and support negotiation.
原文の言語: 英語
Perform value engineering analysis using CWICR data. Identify cost-saving alternatives while maintaining function and quality.
原文の言語: 英語
Calculate material waste factors and losses using CWICR norms. Apply waste percentages, cutting losses, and spillage factors to material quantities.
原文の言語: 英語
Break down CWICR work items into component resources. Decompose aggregate items, analyze resource composition, and generate detailed bills of resources.
原文の言語: 英語
Build n8n pipeline for automated cost estimation from Revit/IFC using DDC CWICR database and LLM classification.
原文の言語: 英語
Check construction AI systems against the EU AI Act (Regulation 2024/1689): classify risk of estimation, scheduling, CV and agent tools, document transparency, keep human oversight. Use when deploying or auditing AI in construction.
原文の言語: 英語
Generative design for construction: text-to-BIM concepts, option generation, and AI-assisted design iteration with cost and carbon feedback. Use when exploring early design options with AI.
原文の言語: 英語
Material passports and circular construction: generate per-element material inventories from BOQ/BIM, mark reuse potential and recycled content, and prepare deconstruction data. Use for circular-economy and EU Taxonomy-aligned projects.
原文の言語: 英語
Field operations in OpenConstructionERP: punch list, daily diary, HSE observations and task tracking on site. Use when automating construction site workflows (deficiencies, diaries, safety, site tasks).
原文の言語: 英語
Portfolio mapping and model coordination in OpenConstructionERP: the 3D geo hub (Cesium), the coordination hub with clash AI, and geo-anchored projects. Use for multi-project portfolio views and BIM clash workflows.
原文の言語: 英語
Connect OpenConstructionERP to AI coding assistants via MCP (Model Context Protocol): expose costs, BOQ, BIM and catalog endpoints as MCP tools so Claude Code / Antigravity / OpenCode can drive the platform. Use when wiring an assistant to the ERP.
原文の言語: 英語
Property development lifecycle in OpenConstructionERP: lead to SPA to handover — feasibility, budgeting from cost bases, sales tracking and construction handover. Use for residential/commercial development projects.
原文の言語: 英語
Tendering and reporting in OpenConstructionERP: prepare tender BOQs, compare bids, manage risks, and generate reports (weekly, monthly, closeout). Use when a project goes to tender or needs reporting.
原文の言語: 英語
Use the OpenConstructionERP validation engine: rule packs (BOQ quality, DIN 276, NRM, GAEB, MasterFormat, DPGF) that check estimates at import time and on demand. Use when verifying BOQ correctness or writing custom validation rules.
原文の言語: 英語
Semantic search in the DDC CWICR construction cost database using vector embeddings (BGE-M3, 1024-dim, per-language Qdrant collections). Find similar work items and resources for cost estimation across 8 national bases and 30 markets in 26 languages.
原文の言語: 英語
Orchestrate multiple AI agents for construction workflows: estimator, scheduler, document, QA and safety agents coordinated by a supervisor agent, with human checkpoints. Use when automating end-to-end project processes with agentic AI.
原文の言語: 英語
Estimate embodied carbon and produce ESG/climate reporting for construction: LCA per work item, material-based carbon factors, EU taxonomy and CSRD alignment. Use when a project needs carbon estimates or sustainability reporting.
原文の言語: 英語