Skip to main content

equipment-division-11

Division 11 equipment coordination for food service, laboratory, medical, athletic, and specialty equipment installation.

설치로 이동

소스 정보

저장소
Construction-Gamma/construction-gamma-skills
최근 소스 활동
2026년 2월 28일 12:02
감지된 SKILL.md 언어
영어
스타
11
포크
5

설치 방법

기본적으로 소스를 먼저 확인하는 Prompt가 선택됩니다. 직접 명령으로 전환하거나 로컬 사본을 다운로드할 수도 있습니다.

소스 파일 검토

설치 여부를 결정하기 전에 SKILL.md와 SkillsMP에 표시된 보조 파일을 읽어 보세요.

파일 탐색기
25 개 파일

SKILL.md 표시 중

SKILL.md
소스 지침 · 읽기 전용 미리보기
name
equipment-division-11
description
Division 11 equipment coordination for food service, laboratory, medical, athletic, and specialty equipment installation.
# Equipment - Division 11 This skill provides comprehensive guidance for Division 11 equipment coordination including food service equipment, laboratory casework and fume hoods, medical imaging and equipment, athletic equipment, loading dock equipment, waste handling systems, and specialty equipment. ## Quick Reference Tables ### Equipment Categories Overview | Category | Key Equipment Types | Primary Coordination Needs | |----------|--------------------|-----------------------------| | Food Service | Cooking, refrigeration, hoods, warewashing | Kitchen consultant, health dept, MEP | | Laboratory | Casework, fume hoods, BSCs, services | Lab planner, HVAC, plumbing | | Medical Imaging | X-ray, CT, MRI, nuclear medicine | Vendor, shielding, structural | | Medical General | Sterilizers, surgical, patient lifts | Equipment planner, MEP, structural | | Athletic | Backstops, bleachers, scoreboards | Structural, electrical, flooring | | Loading Dock | Levelers, seals, restraints | Structural, electrical, civil | | Waste Handling | Compactors, chutes, recycling | Structural, fire protection | | Specialty | Parking, theater, library, bank | Varies by equipment type | ### Procurement Categories | Abbreviation | Definition | Contractor Responsibility | |--------------|------------|---------------------------| | CFCI | Contractor Furnished, Contractor Installed | Full procurement and installation | | OFCI | Owner Furnished, Contractor Installed | Receive, store, install, connect | | OFOI | Owner Furnished, Owner Installed | Infrastructure and rough-in only | | VFI | Vendor Furnished, Vendor Installed | Coordinate access and utilities | ### Common Utility Requirements | Equipment Type | Electrical | Plumbing | HVAC | Special | |----------------|------------|----------|------|---------| | Commercial ranges | 208-480V, 3-phase | Gas connection | Hood exhaust | Fire suppression | | Walk-in coolers | 208V, single/3-phase | Floor drain | Refrigeration | Condensing unit location | | Combi ovens | 208-480V, 3-phase | Water, drain | Hood exhaust | Water softener | | Dishwashers | 208-480V, 3-phase | Hot water, drain | Exhaust | Booster heater | | Fume hoods | 120V | Varies | Dedicated exhaust | Face velocity monitor | | BSC Class II | 120V | None typical | Exhaust connection | Annual certification | | MRI | High power, UPS | Chilled water | Dedicated HVAC | Quench pipe, RF shield | | CT Scanner | High power | Chilled water | High cooling load | Shielding | | Autoclaves | 208-480V, 3-phase | Steam, water, drain | Exhaust | Pass-through coordination | ## Reference Documents ### Food Service Equipment - [Food Service Layout & Design](references/food-service-layout.md) - Kitchen zones, work flow, floor planning - [Cooking Equipment](references/cooking-equipment.md) - Ranges, ovens, fryers, steamers, kettles - [Refrigeration Equipment](references/refrigeration-equipment.md) - Walk-ins, reach-ins, ice machines - [Hoods & Exhaust Systems](references/hoods-exhaust-systems.md) - Type I/II hoods, fire suppression - [Warewashing Equipment](references/warewashing-equipment.md) - Dishwashers, disposers, pot washing - [Food Service Coordination](references/food-service-coordination.md) - Consultant role, stainless fabrication ### Laboratory Equipment - [Laboratory Casework](references/laboratory-casework.md) - Cabinets, countertops, sinks - [Fume Hoods & Biosafety](references/fume-hoods-biosafety.md) - Chemical hoods, BSC classes - [Lab Services & Equipment](references/lab-services-equipment.md) - Gases, vacuum, DI water, emergency fixtures ### Medical Equipment - [Medical Imaging Equipment](references/medical-imaging.md) - X-ray, CT, fluoroscopy, shielding - [MRI Requirements](references/mri-requirements.md) - Zones, RF shielding, quench pipe - [Medical Equipment General](references/medical-equipment-general.md) - Sterilizers, surgical, patient lifts ### Site & Support Equipment - [Athletic Equipment](references/athletic-equipment.md) - Gym, natatorium, scoreboards, bleachers - [Loading Dock Equipment](references/loading-dock-equipment.md) - Levelers, seals, restraints - [Waste Handling](references/waste-handling.md) - Compactors, chutes, recycling - [Specialty Equipment](references/specialty-equipment.md) - Parking, theater, library, detention ### Coordination & Management - [OFCI/OFOI Coordination](references/ofci-ofoi-coordination.md) - Procurement categories, responsibilities - [Utility Rough-In](references/utility-rough-in.md) - Electrical, plumbing, HVAC coordination - [Structural Coordination](references/structural-coordination.md) - Floor loading, vibration, supports - [Code Compliance](references/code-compliance.md) - Health dept, licensing, lab codes - [Commissioning & Startup](references/commissioning-startup.md) - Testing, training, documentation - [Safety Hazards](references/safety-hazards.md) - Installation hazards, PPE requirements - [Specifications & CSI](references/specifications-csi.md) - Division 11 sections, related divisions ## Critical Coordination Points ### Pre-Construction Phase 1. Identify all Division 11 equipment from specifications and equipment schedules 2. Determine procurement responsibility (CFCI, OFCI, OFOI) for each item 3. Coordinate with equipment consultants (food service, lab planner, equipment planner) 4. Review utility requirements and verify MEP design accommodates all equipment 5. Identify structural requirements (floor loading, vibration, shielding) 6. Establish equipment delivery schedule aligned with construction schedule ### Construction Phase 1. Verify rough-in locations using equipment cut sheets and shop drawings 2. Install blocking, supports, and structural accommodations 3. Coordinate specialty construction (shielding, walk-in panels, hoods) 4. Manage equipment deliveries (staging, storage, protection, rigging) 5. Complete final utility connections 6. Coordinate vendor installations ### Closeout Phase 1. Equipment startup and testing 2. Manufacturer certifications (fume hoods, BSCs, refrigeration) 3. Regulatory inspections (health department, state licensing) 4. Owner training 5. O&M manuals and warranty documentation ## Related Skills - **mechanical-plumbing-systems** - Kitchen ventilation, lab exhaust, plumbing connections - **electrical-systems** - Power, data, low-voltage coordination - **fire-protection-systems** - Kitchen suppression, trash chute sprinklers - **structural-trades** - Heavy equipment support, shielding construction - **interior-finishes-trades** - Blocking, casework coordination - **specialties-division-10** - Related Division 10 items - **doors-frames-hardware** - Lead-lined doors, detention hardware - **quality-control-closeout** - Commissioning and turnover procedures - **procore-project-management** - Submittal and procurement tracking ## Common Issues & Solutions | Issue | Prevention | Resolution | |-------|------------|------------| | Late equipment delivery | Build float into schedule, track procurement early | Expedite, adjust sequence, protect utilities | | Utility rough-in mismatch | Review cut sheets before rough-in, verify locations | Relocate utilities before finishes | | Structural capacity inadequate | Early coordination with structural engineer | Reinforce, redistribute loads | | Equipment won't fit through doors | Plan delivery route during design | Temporary opening, disassembly | | Health department rejection | Pre-inspection consultation, plan review | Address deficiencies, re-inspect | | Shielding gaps (radiology) | Quality installation, physicist review | Add shielding, re-survey | | Vendor installation delays | Clear access schedule, utility readiness | Escalate to owner, expedite |
GitHub에서 보기