Skip to main content

interior-finishes-trades

Expert guidance on interior finish construction including framing, drywall, painting, flooring, tile, millwork, and finish carpentry for commercial projects.

설치로 이동

소스 정보

저장소
Construction-Gamma/construction-gamma-skills
최근 소스 활동
2026년 2월 28일 12:02
감지된 SKILL.md 언어
영어
스타
11
포크
5

설치 방법

기본적으로 소스를 먼저 확인하는 Prompt가 선택됩니다. 직접 명령으로 전환하거나 로컬 사본을 다운로드할 수도 있습니다.

소스 파일 검토

설치 여부를 결정하기 전에 SKILL.md와 SkillsMP에 표시된 보조 파일을 읽어 보세요.

파일 탐색기
27 개 파일

SKILL.md 표시 중

SKILL.md
소스 지침 · 읽기 전용 미리보기
name
interior-finishes-trades
description
Expert guidance on interior finish construction including framing, drywall, painting, flooring, tile, millwork, and finish carpentry for commercial projects.
# Interior Finishes Trades Comprehensive trade knowledge for managing interior finish work from rough framing through final punch list on commercial and institutional construction projects. ## Quick Reference Tables ### Gypsum Board Selection | Board Type | Thickness | Primary Application | |------------|-----------|---------------------| | Regular | 1/2" | Standard residential, light commercial | | Regular | 5/8" | Standard commercial walls | | Type X | 5/8" | 1-hour fire-rated assemblies | | Type X | 2 layers 5/8" | 2-hour fire-rated assemblies | | Type C | 5/8" | Enhanced fire performance | | Moisture-Resistant | 1/2", 5/8" | Bathrooms (not in wet areas) | | Mold-Resistant | 1/2", 5/8" | High humidity areas | | Abuse-Resistant | 5/8" | Corridors, high-traffic areas | | Impact-Resistant | 5/8" | Gymnasiums, detention | | Shaft Liner | 1" | Elevator/stair shaft walls | ### Drywall Finish Levels | Level | Description | Typical Applications | |-------|-------------|---------------------| | Level 0 | No finishing | Temporary construction, concealed | | Level 1 | Tape embedded | Above ceilings, service areas | | Level 2 | One coat on tape/fasteners | Tile substrate, concealed areas | | Level 3 | Two coats, tool marks OK | Heavy texture, heavy wallcovering | | Level 4 | Three coats, sanded smooth | Flat/eggshell paint, light texture | | Level 5 | Skim coat entire surface | Gloss paint, critical lighting | ### Metal Framing Gauges | Gauge | Mil Thickness | Decimal (in) | Common Applications | |-------|---------------|--------------|---------------------| | 25 ga | 18 mil | 0.0188" | Light non-load-bearing | | 22 ga | 27 mil | 0.0283" | Standard non-load-bearing | | 20 ga | 33 mil | 0.0346" | Heavy-duty non-load-bearing | | 18 ga | 43 mil | 0.0451" | Light load-bearing | | 16 ga | 54 mil | 0.0566" | Load-bearing | | 14 ga | 68 mil | 0.0713" | Heavy load-bearing | ### Paint Sheen Levels | Sheen | Gloss Units | Typical Applications | |-------|-------------|---------------------| | Flat/Matte | 0-10 | Ceilings, low-traffic walls | | Eggshell | 10-25 | Office walls, residential | | Satin | 25-35 | Corridors, moderate traffic | | Semi-Gloss | 35-70 | Bathrooms, kitchens, trim | | Gloss | 70+ | Doors, trim, accent areas | ### Floor Moisture Limits (Concrete) | Flooring Type | Calcium Chloride (lbs/1000 sf/24hr) | RH Test (%) | |---------------|-------------------------------------|-------------| | Carpet - Permeable | 5.0-8.0 | 80-85% | | VCT | 3.0-5.0 | 75-80% | | LVT/LVP | 3.0-5.0 | 75-80% | | Sheet Vinyl | 3.0-5.0 | 75-80% | | Rubber | 3.0-5.0 | 75-80% | | Hardwood (engineered) | 3.0 | 75% | | Epoxy/Urethane | Varies by manufacturer | 75-80% | ### Tile Setting Requirements | Tile Size | Trowel Notch | Coverage Required | Back-Butter? | |-----------|--------------|-------------------|--------------| | Mosaic (<2") | 3/16" V-notch | 80% min | No | | Up to 8" | 1/4" square | 80% min | No | | 8"-12" | 1/4" x 3/8" | 80% min walls / 95% wet | Optional | | 12"-16" | 1/2" x 1/2" | 80% min walls / 95% wet | Recommended | | 16"+ / Large Format | 1/2" x 1/2" or 3/4" | 95% min all locations | Required | ### AWI Quality Grades | Grade | Description | Typical Applications | |-------|-------------|---------------------| | Economy | Basic quality, functional | Back-of-house, utility areas | | Custom | Industry standard quality | Most commercial projects | | Premium | Finest quality, meticulous | Executive areas, high-end | ### Fire-Rated Assembly Requirements | Separation Type | IBC Section | Typical Rating Required | |-----------------|-------------|------------------------| | Occupancy Separation | 508 | 1-2 hours (varies by occupancy) | | Dwelling Unit Separation | 420.2 | 1 hour | | Corridor Walls | 1020.1 | 1 hour (occupancy dependent) | | Shaft Enclosures | 713 | 1-2 hours (height dependent) | | Exit Stairways | 1023 | 1-2 hours (stories connected) | | Exit Passageways | 1024 | 1-2 hours (stories connected) | | Fire Barriers | 707 | Per Table 707.3.10 | | Fire Partitions | 708 | 1 hour minimum | ## Interior Finish Sequence ``` Typical Commercial Interior Finish Sequence: 1. ROUGH FRAMING └── Metal studs, blocking, backing installed └── Inspection: Framing and blocking complete 2. MEP ROUGH-IN └── Electrical, plumbing, HVAC in walls/ceilings └── Inspection: MEP rough-in complete 3. INSULATION └── Thermal, acoustic, fire safing └── Inspection: Insulation complete 4. DRYWALL HANG └── Board hung, fire-rated assemblies complete └── Inspection: Fire-rated assemblies before tape 5. DRYWALL TAPE & FINISH └── Taping, finishing to specified level └── Inspection: Finish level acceptable 6. CEILING GRID (if ACT) └── Main tees, cross tees installed 7. PAINTING - WALLS & CEILINGS └── Prime and paint complete 8. MILLWORK & CASEWORK └── Cabinets, trim, millwork installed 9. FLOORING └── Hard surface flooring installed └── Carpet last (protect until occupancy) 10. PUNCH & TOUCH-UP └── All trades touch-up and corrections ``` ## Key Coordination Points ### Blocking Verification Checklist - [ ] Grab bar backing (verify ADA locations) - [ ] Casework backing at all cabinet locations - [ ] TV mount backing (verify heights with owner) - [ ] Toilet accessory backing - [ ] Toilet partition backing - [ ] Handrail backing (continuous) - [ ] Marker board / tack board backing - [ ] Wall-mounted equipment backing - [ ] Window treatment backing ### Pre-Drywall Checklist - [ ] Framing inspected and approved - [ ] All MEP rough-in complete - [ ] All blocking installed and verified - [ ] Fire blocking and draft stopping complete - [ ] Inspection hold points cleared - [ ] Photos of concealed conditions ### Pre-Floor Installation Checklist - [ ] Concrete moisture tested and documented - [ ] Substrate flat within tolerance - [ ] All overhead work complete - [ ] HVAC operational (temp/humidity controlled) - [ ] Flooring acclimated to space - [ ] Transitions and edge conditions defined ## Reference Files ### Rough Carpentry & Framing - [Wood Framing](references/rough-carpentry-wood-framing.md) - Lumber grades, wall/floor framing, engineered lumber, hardware - [Metal Framing](references/cold-formed-metal-framing.md) - Steel studs, gauges, load-bearing, deflection details - [Blocking & Firestopping](references/blocking-backing-firestopping.md) - Backing requirements, fire blocking, firestopping systems ### Drywall & Insulation - [Gypsum Board Systems](references/gypsum-board-systems.md) - Board types, applications, shaft wall, installation - [Drywall Finishing](references/drywall-finishing-levels.md) - Finish levels, compounds, techniques, defects - [Fire-Rated Assemblies](references/fire-rated-assemblies.md) - UL listings, construction, inspection, documentation - [Acoustic Assemblies](references/acoustic-assemblies.md) - STC, IIC, assembly design, weak points - [Insulation Systems](references/insulation-systems.md) - Batt, blown, spray foam, rigid insulation ### Finish Carpentry & Millwork - [Finish Carpentry](references/finish-carpentry-trim.md) - Trim types, materials, installation, quality - [Architectural Millwork](references/architectural-millwork.md) - AWI standards, paneling, species, finishes - [Casework & Countertops](references/casework-countertops.md) - Cabinet construction, hardware, countertop types ### Painting & Coatings - [Surface Preparation](references/painting-surface-prep.md) - Prep by substrate, moisture, temperature - [Paint & Coating Types](references/paint-coating-types.md) - Paint types, sheens, primers, stains - [Specialty Coatings](references/specialty-coatings.md) - Antimicrobial, anti-graffiti, intumescent, industrial ### Flooring - [Carpet & Resilient](references/flooring-carpet-resilient.md) - Carpet types, VCT, LVT, rubber, installation - [Hardwood & Specialty](references/flooring-hardwood-specialty.md) - Hardwood, polished concrete, epoxy, access flooring - [Floor Preparation](references/floor-preparation.md) - Substrate prep, moisture testing, underlayments ### Tile & Stone - [Tile Installation](references/tile-stone-installation.md) - Tile types, setting methods, grout, movement joints - [Waterproofing & Substrates](references/tile-waterproofing-substrates.md) - Substrates, waterproofing, shower systems ### Project Management - [Code Compliance](references/code-compliance.md) - Fire-rated, flame spread, ADA, VOC, slip resistance - [Testing & QC](references/testing-qc.md) - Moisture testing, inspections, mock-ups, standards - [Coordination & Sequencing](references/coordination-sequencing.md) - Finish sequence, phasing, trade coordination - [Protection & Punchlist](references/protection-punchlist.md) - Floor protection, punch standards, final cleaning - [Safety Hazards](references/safety-hazards.md) - Trade-specific hazards, dust, chemicals, ergonomics - [Specifications & CSI](references/specifications-csi.md) - Division 06, 07, 09, 12 specification guidance ## Related Skills - **doors-frames-hardware** - Door/frame/hardware coordination with trim and millwork - **construction-safety-management** - OSHA requirements, PPE, respiratory protection - **vdc-bim-coordination** - Interior coordination and clash detection - **procore-project-management** - RFI, submittal, and daily log workflows - **schedule-management-cpm** - Interior finish sequencing and phased turnover - **quality-control-closeout** - Punch list management and final inspections - **electrical-systems** - Blocking coordination with electrical rough-in - **mechanical-plumbing-systems** - Blocking coordination with MEP
GitHub에서 보기