Skip to main content

structural-trades

Expert guidance for managing concrete, structural steel, precast, and fireproofing trades in commercial construction.

설치로 이동

소스 정보

저장소
Construction-Gamma/construction-gamma-skills
최근 소스 활동
2026년 2월 28일 12:02
감지된 SKILL.md 언어
영어
스타
11
포크
5

설치 방법

기본적으로 소스를 먼저 확인하는 Prompt가 선택됩니다. 직접 명령으로 전환하거나 로컬 사본을 다운로드할 수도 있습니다.

소스 파일 검토

설치 여부를 결정하기 전에 SKILL.md와 SkillsMP에 표시된 보조 파일을 읽어 보세요.

파일 탐색기
25 개 파일

SKILL.md 표시 중

SKILL.md
소스 지침 · 읽기 전용 미리보기
name
structural-trades
description
Expert guidance for managing concrete, structural steel, precast, and fireproofing trades in commercial construction.
# Structural Trades Management This skill provides comprehensive technical knowledge for project managers, superintendents, and field supervisors managing structural trades on commercial and institutional construction projects. It covers cast-in-place concrete, structural steel, precast concrete, fireproofing, and miscellaneous metals. ## Quick Reference Tables ### Structural Trade Responsibilities | Trade | Typical Subcontractor | Key Deliverables | |-------|----------------------|------------------| | Formwork | Concrete contractor | Forms, shores, form drawings | | Reinforcing Steel | Rebar subcontractor | Shop drawings, placing drawings, installed rebar | | Cast-in-Place Concrete | Concrete contractor | Mix designs, placement, finishing, curing | | Post-Tensioning | PT specialty sub | Shop drawings, tendons, stressing, grouting | | Structural Steel | Steel fabricator/erector | Shop drawings, fabricated steel, erection | | Steel Deck | Deck subcontractor | Deck, attachments, shear studs | | Precast Concrete | Precast supplier | Shop drawings, panels/members, erection | | Fireproofing | Fireproofing sub | Product data, application, thickness verification | | Miscellaneous Metals | Misc metals fabricator | Shop drawings, stairs, rails, embeds | ### Critical Hold Points | Activity | Hold Point | Required Before Proceeding | |----------|-----------|---------------------------| | Concrete Pour | Pre-pour inspection | Rebar inspection complete, formwork approved | | PT Stressing | Strength verification | Minimum f'c achieved (typically 3000-3500 psi) | | Steel Erection | Anchor bolt verification | Anchor bolts set and surveyed | | Precast Setting | Connection hardware | Embed plates and bearing surfaces ready | | Fireproofing | Surface preparation | Steel cleaned, primer applied if required | | Deck Welding | Welder qualification | Welder certification current | ### Typical Lead Times | Item | Lead Time | Notes | |------|-----------|-------| | Structural Steel | 12-16 weeks | From approval to delivery | | Precast Concrete | 10-16 weeks | Varies by complexity | | Reinforcing Steel | 4-8 weeks | Shop fabrication time | | Post-Tensioning | 6-10 weeks | Materials and coordination | | Miscellaneous Metals | 8-12 weeks | Stairs, rails, ladders | | Fireproofing Materials | 2-4 weeks | Product availability | ### Common Concrete Strengths (f'c) | Application | Typical f'c (psi) | Notes | |-------------|-------------------|-------| | Footings | 3000-4000 | Standard foundations | | Foundation Walls | 4000-5000 | Below grade | | Columns | 5000-10000 | May vary by floor | | Elevated Slabs | 4000-5000 | Standard construction | | Post-Tensioned Slabs | 5000-6000 | Higher for PT | | Shear Walls | 5000-8000 | Lateral system | | High-Rise Columns | 8000-14000 | Lower floors | ### Structural Steel Grades | Grade | Fy (ksi) | Fu (ksi) | Common Use | |-------|----------|----------|------------| | A36 | 36 | 58-80 | Plates, angles, misc steel | | A572 Gr 50 | 50 | 65 | Shapes, plates | | A992 | 50-65 | 65 | Wide flange shapes (standard) | | A500 Gr B | 46 | 58 | HSS (tube steel) | | A500 Gr C | 50 | 62 | HSS (higher strength) | | A53 Gr B | 35 | 60 | Pipe | ### Rebar Grades and Properties | Grade | fy (ksi) | Common Sizes | Notes | |-------|----------|--------------|-------| | Grade 40 | 40 | #3, #4 | Stirrups, ties | | Grade 60 | 60 | #3-#11 | Standard (most common) | | Grade 75 | 75 | #6-#18 | High-strength applications | | Grade 80 | 80 | #6-#18 | Reduced congestion | ### Bar Sizes Quick Reference | Bar Size | Diameter (in) | Area (sq in) | Weight (lb/ft) | |----------|---------------|--------------|----------------| | #3 | 0.375 | 0.11 | 0.376 | | #4 | 0.500 | 0.20 | 0.668 | | #5 | 0.625 | 0.31 | 1.043 | | #6 | 0.750 | 0.44 | 1.502 | | #7 | 0.875 | 0.60 | 2.044 | | #8 | 1.000 | 0.79 | 2.670 | | #9 | 1.128 | 1.00 | 3.400 | | #10 | 1.270 | 1.27 | 4.303 | | #11 | 1.410 | 1.56 | 5.313 | | #14 | 1.693 | 2.25 | 7.650 | | #18 | 2.257 | 4.00 | 13.600 | ### Fire Resistance Ratings | Assembly Type | 1-Hour | 2-Hour | 3-Hour | 4-Hour | |---------------|--------|--------|--------|--------| | W-Shape Column | 1/2" | 1" | 1-1/2" | 2" | | W-Shape Beam | 3/8" | 3/4" | 1-1/8" | 1-1/2" | | Steel Deck (restrained) | Varies | Varies | Varies | N/A | | Concrete (by cover) | Per UL | Per UL | Per UL | Per UL | *Note: SFRM thicknesses are approximate; always verify with specific UL Design Number* ## Reference Files ### Cast-in-Place Concrete - [Concrete Fundamentals](references/concrete-fundamentals.md) - Mix design, strength, admixtures, SCMs, temperature limits, ordering - [Formwork Systems](references/formwork-systems.md) - Wall, column, slab forming, shoring, stripping times, tolerances - [Reinforcing Steel](references/reinforcing-steel.md) - Grades, detailing, splices, development length, cover, supports - [Concrete Placement & Curing](references/concrete-placement-curing.md) - Pumping, consolidation, finishing, curing, weather, joints - [Post-Tensioning](references/post-tensioning.md) - Bonded/unbonded systems, stressing, grouting, coordination - [Specialty Concrete](references/specialty-concrete.md) - Architectural, SCC, high-strength, lightweight, fiber, tilt-up ### Structural Steel - [Structural Steel Basics](references/structural-steel-basics.md) - Grades, shapes, mill certs, fabrication, shop drawings - [Steel Connections](references/steel-connections.md) - Shear, moment, base plates, splices, braced frame connections - [Welding & Inspection](references/welding-inspection.md) - Processes, weld types, AWS D1.1, WPS, NDT, defects - [High-Strength Bolting](references/high-strength-bolting.md) - Grades, installation methods, pretensioning, inspection - [Steel Erection](references/steel-erection.md) - Sequence, bracing, anchor setting, tolerances, OSHA requirements - [Steel Deck & Composite](references/steel-deck-composite.md) - Deck types, attachment, shear studs, composite design ### Precast Concrete - [Precast Concrete](references/precast-concrete.md) - Structural, architectural products, finishes, tolerances, plant QC - [Precast Erection & Connections](references/precast-erection-connections.md) - Erection, connections, grouting, topping, repairs ### Fireproofing & Miscellaneous - [Fireproofing Systems](references/fireproofing-systems.md) - SFRM, intumescent, board, application, UL assemblies - [Miscellaneous Metals](references/miscellaneous-metals.md) - Stairs, rails, ladders, grating, bollards, code requirements - [Anchors & Embeds](references/anchors-embeds.md) - Cast-in, post-installed, adhesive anchors, templates, inspection ### Quality, Inspections & Compliance - [Special Inspections](references/special-inspections.md) - IBC requirements, types, documentation, coordination - [Testing & QC](references/testing-qc.md) - Concrete, steel, welding, bolt, fireproofing testing - [Code Compliance](references/code-compliance.md) - ACI, AISC, AWS, PCI, IBC reference guide ### Coordination & Safety - [Coordination & Sequencing](references/coordination-sequencing.md) - Sequence planning, MEP coordination, BIM, RFIs - [Safety Hazards](references/safety-hazards.md) - Concrete, steel, precast, fireproofing hazards, OSHA - [Specifications & CSI](references/specifications-csi.md) - Division 03, 05, 07, key sections, common issues ## Integration with Other Skills This skill integrates with other construction management skills: | Related Skill | Integration Points | |---------------|-------------------| | [construction-safety-management] | OSHA requirements, fall protection, PPE, hazard analysis | | [vdc-bim-coordination] | Structural coordination, clash detection, 4D sequencing | | [procore-project-management] | RFI workflow, submittal tracking, daily logs | | [schedule-management-cpm] | Structural milestones, critical path, float management | | [contract-administration] | Change orders, PCOs, structural scope issues | | [quality-control-closeout] | Structural punch list, inspection coordination | | [early-phase-enabling-trades] | Foundation coordination, excavation support | ## Key Contacts and Coordination ### Typical Structural Team - **Structural Engineer of Record (SEOR)**: Design questions, RFIs, field observations - **Steel Detailer**: Shop drawing coordination, piece marks, connections - **Concrete Testing Lab**: Cylinder testing, special inspections - **Special Inspector**: IBC-required inspections, documentation - **Welding Inspector**: CWI for structural welding, NDT coordination ### Critical Coordination Meetings - **Pre-Pour Meetings**: Before major concrete placements - **Steel Coordination**: With fabricator before fabrication starts - **Precast Coordination**: Erection sequence, crane locations - **MEP Coordination**: Penetrations, embeds, hangers before concrete/steel ## Common Issues and Solutions | Issue | Likely Cause | Solution | |-------|--------------|----------| | Failing concrete cylinders | Mix issue, curing, testing | Core testing, maturity method | | Steel connection fit-up problems | Shop drawing errors, tolerances | Field welding, shims, RFI | | Rebar congestion | Design, coordination | Mechanical splices, RFI for alternatives | | PT tendon conflicts | Coordination failure | Reposition sleeves, add blockouts | | Fireproofing adhesion failure | Poor surface prep | Clean, re-prep, re-apply | | Anchor bolt misalignment | Template error, movement | Oversize holes, bent plates | ## Documentation Requirements ### Daily Documentation - Concrete placement logs (pour cards) - Steel erection daily reports - Welding inspection reports - Temperature logs (concrete, weather) ### Inspection Documentation - Special inspection reports - Concrete test reports (cylinders) - Mill test reports (steel) - Bolt tensioning logs - Fireproofing thickness reports ### Quality Records - Non-conformance reports (NCRs) - Corrective action reports - Final special inspection letters - Structural observation reports