Split a bound drawing set PDF into individual sheet PDFs. Extracts sheet numbers from title blocks via vision, renames files, and records where the cover sheet's drawing index disagrees with the set, logging the ones that need an RFI for rfi-drafter.…
Checks construction drawings and specs for what's missing, cross-trade coordination conflicts and scope gaps, with PE judgment. Use for 'what's missing', 'check coordination', 'scope gap', or researching an RFI before answering it. Not for drafting RFIs…
Extract tabular schedule data from construction drawings — door, window, finish, fixture, panel schedules — and output to Excel. Triggers: 'door schedule', 'extract schedule', 'schedule to Excel', 'panel schedule'.
Evaluate tabulated subcontractor bids against specs and drawings — scope gap analysis, exclusion risk scoring, award recommendation. Triggers: 'evaluate bids', 'bid evaluation', 'lowest responsible bidder'.
Operating guide for construction project documents — load before reading drawings, specs, schedules, RFIs, submittals or bids. Data-access rules (never read PDFs directly; rasterize first), AgentCM graph-guided vision, drawing and cross-reference conventions,…
Split a bound project manual PDF into individual spec section PDFs and extract searchable text. Triggers: 'split specs', 'break up the project manual', 'separate spec sections', 'extract spec text'. Prerequisite for /submittal-log-generator.
Expert PE review of a submittal (shop drawings, product data, samples, equipment brochures) against specs, drawings, code questions and trade coordination. Produces findings with both sources, trade routing and a completeness gate. Triggers: 'review…
Count-based quantity takeoff and tag completeness auditing for construction drawings. Vision + OCR reconciliation, sheet markup, Excel QTO output. Triggers: 'tag audit', 'quantity takeoff', 'QTO', 'count fixtures'.